TECHNICAL PAPERS
Mar 1, 1991

Forecasting Design‐Related Problems—Case Study

Publication: Journal of Construction Engineering and Management
Volume 117, Issue 1

Abstract

The goal of an owner is to have a project that incorporates the latest technology with timely completion. This goal has resulted in fast‐track construction. The trade‐offs for this are design‐related problems that are often not found until the construction phase of the project. The results of these problems are work stoppages or rework and increased costs. This paper uses an industrial‐project case study to identify the number, type, and time of occurrence of design‐related problems. This information is used to develop a model to forecast potential design‐related problems. Results of this study show that design‐related problems can be traced back to the design phase of a project and that design complexity is the main cause of these problems. Profile curves are presented for specific disciplines that predict the pattern of problems throughout that discipline's progress. Forecasting models using design or construction man‐hours are developed to predict the potential number of design‐related problems that can be expected during the construction of an industrial project.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Anderson, D. R., Sweeney, D. J., and Williams, T. A. (1984). Statistics for Business and Economics, 2nd Ed. West Publishing Co., St. Paul, Minn.
2.
Bliudzius, P. A., and Ashley, D. B. (1985). “A construction project risk identification relational database.” Report No. UTCEPM‐85‐4, Univ. of Texas at Austin, Austin, Texas.
3.
Glavan, J. R. (1988). “Analysis of design‐related problems from an industrial project,” thesis presented to the University of Texas at Austin, Texas, in partial fulfillment of the requirements for the degree of Doctor of Philosophy.
4.
“Nuclear power in an age of uncertainty.” (1984). OTA‐E‐216, U.S. Congress, Office of Technology Assessment, Washington, D.C.
5.
“Reshaping to ride the new wave.” (1985). Engrg. News Record, 215(9), 24–28.
6.
Smith, M. A. (1983). “An assessment of the potential problems occurring in the engineering phase of an industrial project,” thesis presented to the University of Texas at Austin, Texas, in partial fulfillment of the requirements for the degree of Doctor of Philosophy.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 117Issue 1March 1991
Pages: 47 - 65

History

Published online: Mar 1, 1991
Published in print: Mar 1991

Permissions

Request permissions for this article.

Authors

Affiliations

John R. Glavan
Asst. Prof., Dept. of Civ. Engrg., U.S. Air Force Academy, Colorado Springs, CO 80840
Richard L. Tucker, Fellow, ASCE
C. T. Wells Prof. of Proj. Mgmt., Univ. of Texas, Austin, TX 78703

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share