Systematic Risk Management Approach for Construction Projects
Publication: Journal of Construction Engineering and Management
Volume 116, Issue 3
Abstract
Risk is inherently present in all construction projects. Quite often, construction projects fail to achieve their time, quality, and budget goals. A risk model entitled construction risk management system (CRMS) is introduced to help contractors identify project risks and systematically to analyze and manage them. The CRMS model is a logical substitute for the traditional intuitive unsystematic approach currently used by most contractors. The influence diagramming technique and Monte Carlo simulation are used as tools to analyze and evaluate project risks. Alternative risk management strategies are suggested. Such strategies include: risk avoidance, risk transfer, risk retention, loss reduction, and risk prevention and insurance.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Agogino, A. M., and Rege, A. (1986). “A tutorial on influence diagrams.” Working Paper #85‐07‐03, Expert System Laboratory, Dept. of Mech. Engrg., Univ. of California, Berkeley, Calif.
2.
Al‐Bahar, J. F. (1988). “Risk management in construction project: A systematic analytical approach for contractors,” thesis presented to the University of California at Berkeley, Berkeley, California, in partial fulfillment of the requirements for the degree of Doctor of Philosophy.
3.
Ashley, D. B. (1977). “Construction project risk‐sharing.” Technical Report No. 220, Dept. of Civ. Engrg., Stanford Univ., Stanford, Calif., Jul.
4.
Ashley, D. B. (1981). “Construction project risks: Mitigation and management.” Proc. PMI/Internet Joint Symp., Project Management Institute, Drexel Hill, Pa., 331–340.
5.
Ashley, D. B., and Perng, Y.‐H. (1987). “An intelligent construction risk identification system.” Proc. 6th Int. Symp. Offshore Mech. Arctic Engrg., Houston, Texas, Mar.
6.
Baldwin, J. R., et al. (1971). “Causes of delay in the construction industry.” J. Constr. Div., ASCE, 105–106.
7.
Boodman, D. M. (1977). “Risk management and risk management science: An overview.” Paper presented at the Session of Risk Management, TIMS 23rd. Annual Meeting of Institute of Management Sciences, Athens, Greece, Jul.
8.
Bunn, D. W. (1984). Applied decision analysis. McGraw‐Hill Book Co., New York, N.Y.
9.
The Construction Risk Management Manual. (1987). International Risk Management Institute, Inc., Dallas, Tex.
10.
Erikson, C. A. (1979). “Risk sharing in construction contracts,” thesis presented to the University of Illinois at Urbana‐Champaign, Urbana‐Champaign, Ill., in partial fulfillment of the requirements for the degree of Doctor of Philosophy.
11.
Faber, W. (1979). Protecting giant projects: A study of problems and solutions in the area of risk and insurance. Willis Faber, London, England.
12.
Fraser, D. C. (1978). “Risk minimization in giant projects.” Paper presented at Int. Conf. Successful Accomplishment of Giant Projects, OYEZ‐IBC, London, England, May.
13.
Greene, M. R., and Trieschmann, J. S. (1984). Risk and insurance, 6th Ed., South‐Western Publishing Co., Cincinnati, Ohio.
14.
Healy, N. J. (1981). “Risk management in giant civil engineering projects,” thesis presented to the University of Manchester, UMIST, in partial fulfillment of the requirements for the degree of Master of Science.
15.
Hertz, D. B., and Thomas, H. (1983). Risk analysis and its applications. John Wiley and Sons, Inc., New York, N.Y.
16.
Howard, R. H., and Matheson, J. E. (1984). “Influence diagrams.” Readings on the principles and applications of decision analysis, R. H. Howard and J. E. Matheson, eds., Vol. II, Strategic Decision Group, Menlo Park, Calif., 1984.
17.
Huber, G. P. (1974). “Method of quantifying probabilities and multivariate utilities.” Decision Science, 5.
18.
Johnson, J., and Rood, O. E. (1977). “Elements of a fair and equitable profit‐determination for construction contract negotiations.” Draft Report, CERL.
19.
Lifson, M. W., and Shaifer, E. F., Jr. (1982). Decision and risk analysis for construction management. John Wiley and Sons, Inc., New York, N.Y.
20.
Mason, G. E. (1973). “A quantitative risk management approach to selection of construction contract provisions.” Technical Report No. 173, Construction Institute, Dept. of Civ. Engrg., Stanford Univ., Stanford, Calif.
21.
Miller, A. C., et al. (1976). “Development of automated aids for decision analysis.” Stanford Research Institute, Menlo Park, Calif.
22.
Olmsted, S. M. (1983). “On representing and solving decision problems,” thesis presented to Stanford University, at Stanford, Calif., in partial fulfillment of the requirements for the degree of Doctor of Philosophy.
23.
Owen, D. L. (1984). “The use of influence diagrams in structuring complex decision problems.” Readings on the principles and application of decision analysis. Strategic Decision Group, Menlo Park, Calif.
24.
“Preliminary investigations of risk sharing in construction contracts.” (1978). Interim Report No. 88, Construction Engineering Research Laboratory, CERL, Apr.
25.
Spetzler, C. S., and Staël von Holstein, C.‐A. S. (1984). “Probability encoding in decision analysis.” Readings on the principles and applications of decision analysis, R. H. Howard and J. E. Matheson, eds., Vol. II, Strategic Decision Group, Menlo Park, Calif., 601–624.
26.
Staël von Holstein, C.‐A. S. (1970). Assessment and evaluation of subjective probability distributions. Economic Research Institute, Stockholm, Sweden.
27.
Wideman, R. M. (1986). “Risk management.” Project Management Journal, Project Management Institute, Sep., 20–26.
Information & Authors
Information
Published In
Copyright
Copyright © 1990 ASCE.
History
Published online: Sep 1, 1990
Published in print: Sep 1990
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.