TECHNICAL PAPERS
Jun 1, 1989

Truck Capacity Selection for Earthmoving

Publication: Journal of Construction Engineering and Management
Volume 115, Issue 2

Abstract

In a major earthmoving operation involving a loader and trucks, a careful selection of equipment size can result in substantial savings both in time and cost. When planning an earthmoving operation, usually the size of the loading unit is selected based on the production required. The optimal truck capacity is either selected by comparing the production cost of various truck capacities or by using a rule of thumb that recommends truck capacities four to five times the capacity of the selected loader. The objective of this study is to investigate the optimal truck capacity for various loader sizes. To achieve this objective, specifications and costs of a number of loaders and trucks commonly used in earth‐moving are used.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Bernard, D. A., Ferragut, T. R., and Neuman, D. L. (1973). “Production efficiency study on large‐capacity, rubber‐tired front‐end loaders.” Report No. FHWA‐RDDP‐PC‐520, Fed. Highway Admin., Arlington, Va., 12–13.
2.
Caterpillar performance handbook. (1986). 17th Ed., Caterpillar Inc., Peoria, Ill., 458.
3.
Contractor's equipment cost guide. (1986). Dataquest Inc., San Jose, Calif., 20.2–20.17, 9.15–9.25.
4.
Griffis, F. H. (1968). “Optimizing haul fleet size using queueing theory.” J. Constr. Mgmt. and Engrg., ASCE, 94(1), 75–93.
5.
Nunnally, S. W. (1977). Managing construction equipment. Prentice‐Hall, Inc., Englewood Cliffs, N.J., 68–69.
6.
Peurifoy, R. L., and Ledbetter, W. B. (1985). Construction planning, equipment, and methods. 4th Ed., McGraw‐Hill, New York, N.Y., 259.
7.
Production and cost estimating of material movement with earthmoving equipment. (1981). TEREX Division, General Motors Corp., Hudson, Ohio, 29.
8.
O'Shea, J. B., Slutkin, G. N., and Shaffer, L. R. (1964). “An application of the theory of queues to the forecasting of shoven‐truck fleet production.” Constr. Res. Series, 3. Dept. of Civ. Engrg., Univ. of Illinois, Urbana, Ill., 9–22.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 115Issue 2June 1989
Pages: 212 - 227

History

Published online: Jun 1, 1989
Published in print: Jun 1989

Permissions

Request permissions for this article.

Authors

Affiliations

Saeed Karshenas, Associate Member, ASCE
Asst. Prof. of Civ. Engrg., Marquette Univ., Milwaukee, WI 53233

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share