Conceptual Construction Process Model
Publication: Journal of Construction Engineering and Management
Volume 114, Issue 2
Abstract
Managers have tried several project‐specific methods to improve declining construction productivity with mixed results. Most solutions have focused on supporting craftsmen in the field. This paper presents a conceptual model of the construction process, defining goals for management and control systems to support the craftsman's needs in the field. This model comprises four generic flow charts with rules that govern them. The first defines the needs of the craftsman. The second specifies the support functions required from a site organization, while the third defines all of the other major site‐related functions. Finally, the limits of site management control are specified. Craft support is the acid test of a functioning system; thus validation of the model focused on the first two flow charts. Analysis of five groups of similar projects showed that the closer a site organization is to the conceptual model, the better its performance. Site evaluation tools are presented.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Alexander, M. J. (1974). Information systems analysis. Science Research Associates, Inc., Kingsport, Tenn.
2.
Anthony, R. N. (1965). Planning and control systems: a framework for analysis. Division of Research, Graduate School of Business, Harvard University, Boston, Mass.
3.
Ballard, G. (1982). “Work Improvement Programs.” Bechtel Petroleum, in‐house presentation.
4.
Bennett, P. (1980). “Reflections on construction productivity.” Construction productivity frontiers, Illinois Institute of Technology, Second Quarterly, 5–9.
5.
Borcherding, J. D. (1972). Attitudes affecting human resources in building and industrial construction. Technical Report No. 159, Dept. of Civil Engineering, The Construction Inst., Stanford Univ., Stanford, Calif.
6.
Borcherding, J. D. (1977). “Participative decision making in construction.” J. Constr. Div., ASCE, 103(CO4), 567–577.
7.
Burkhardt, A. F. (1980). “Timelapse photography applications.” Proc., Conference on Construction Productivity Improvement, University of Texas at Austin, Austin, Tex., 177–180.
8.
The Business Roundtable. (1982). Construction industry cost effectiveness project reports. The Business Roundtable, New York, N.Y.
9.
Casten, M. H. (1980). “Training and planning.” Proc. Conference on Construction Productivity Improvement, University of Texas at Austin, Austin, Tex., 173–176.
10.
Casten, M. H. (1983). “Short‐term and long‐term commitments.” Proc. Conference on Construction Productivity Improvement, University of Texas at Austin, Austin, Tex.
11.
Galbraith, J. R. (1974). “Organization design: an information processing view.” Interfaces, 4(3), 28–36.
12.
Gorry, G. A. (1971). “The development of managerial models.” Sloan Mgmt. Rev., 12(2), 1–16.
13.
Gorry, G. A., and Scott‐Morton, M. S. (1971). “A framework for management information systems.” Sloan Mgmt. Rev., 13(1), 55–70.
14.
Gregerman, I. B. (1981). “Worker productivity—characteristics and measurement.” AACE Trans., I.2.1–I.2.5.
15.
Howell, G. A., and Casten, M. (1983). Making jobs run better. Howell Assoc., in‐house publication.
16.
Johnston, J. E. (1981). Site control of materials. Butterworth Press, London, U.K.
17.
Judson, A. S. (1982). “The awkward truth about productivity.” Harvard Business Rev., 82(5), 93–97.
18.
Levitt, R. E., and Logcher, R. D. (1976). “The human element in project control systems.” Proc. Annual Seminar/Symposium of the Project Management Institute, Montreal, Canada, 223–237.
19.
Levitt, R. E. (1981). “Superprojects and superheadaches.” Proc., Annual Seminar/Symposium of the Project Management Institute, Boston, Mass., 487–491.
20.
Luthans, F. (1981). Organizational behavior. 3rd Ed., McGraw‐Hill, New York, N.Y.
21.
Mason, R. O., and Mitroff, I. I. (1973). “A program for research on management information systems.” Mgmt. Sci., 19(5), 475–487.
22.
McFarlan, F. W. (1981). “Portfolio approach to information systems.” Harvard Business Rev., 81(5), 142–150.
23.
McFarlan, F. W., and McKenney, J. L. (1983). Corporate information systems management. Richard D. Irwin, Inc., Homewood, Ill.
24.
Mitchell, T. R. (1982). People in organizations. 2nd Ed., McGraw‐Hill, New York, N.Y.
25.
Nadler, D., Mirvis, P., and Cammann, C. (1976). “The ongoing feedback system.” Organizational Dynamics, 4(4), 63–80.
26.
Parker, H. W., and Oglesby, C. H. (1972). Methods improvement for construction managers. McGraw Hill, New York, N.Y.
27.
Paulson, B. C., Jr. (1976). “Human implementation of computer‐based project management.” Proc., Annual Seminar/Symposium of the Project Management Institute, Montreal, Canada, 238–242.
28.
Proc., 1980 Conference on Productivity Improvement. (1980). University of Texas at Austin, Austin, Tex., 9–10.
29.
Proc., 1981 Conference on Productivity Improvement. (1981). University of Texas at Austin, Austin, Tex.
30.
Proc., 1982 Conference on Productivity Improvement. (1982). University of Texas at Austin, Austin, Tex.
31.
Revay, S. G. (1978). “Productivity: how to improve it.” Eng. Contract Rec., Jun., 12–13, 24–26, 28–30.
32.
Rockhart, J. F. (1979). “Chief executives define their own data needs.” Harvard Business Rev., 79(2), 81–93.
33.
Sanvido, V. E. (1983). Productivity improvement programs in construction. Technical Report No. 273, Department of Civil Engineering, The Construction Institute, Stanford University, Stanford, Calif.
34.
Sanvido, V. E. (1984). A framework for designing and analyzing management and control systems to improve the productivity of construction projects. Technical Report No. 282, Department of Civil Engineering, The Construction Institute, Stanford University, Stanford, Calif.
35.
Simon, H. A. (1960). The new science of management decision. Harper & Brothers, Publishers, New York, N.Y.
36.
Simon, J. L. (1978). Basic research methods in social science. 2nd Ed., Random House, New York, N.Y.
37.
Tatum, C. B. (1983). Decision‐making in structuring construction project organizations. Technical Report No. 279, Department of Civil Engineering, The Construction Institute, Stanford University, Stanford, Calif.
38.
Vancil, R. F. (1973). “What kind of management control do you need?” Harvard Business Rev., 51(2), 75–86.
39.
Walton, R. E. (1972). “How to counter alienation in the plant.” Harvard Business Rev., 72(6), 70–81.
Information & Authors
Information
Published In
Copyright
Copyright © 1988 ASCE.
History
Published online: Jun 1, 1988
Published in print: Jun 1988
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.