Simulation Model to Forecast Project Completion Time
Publication: Journal of Construction Engineering and Management
Volume 111, Issue 4
Abstract
Project cost is most sensitive to its schedule. The construction project environment comprising dynamic, uncertain, but predictable, variables such as weather, space congestion, workmen absenteeism, etc., is changing continuously, affecting activity durations. The reliability of project duration forecast can be enhanced by an explicit analysis to determine the variation in activity durations caused by the dynamic variables. A computer model is used to simulate the expected occurrence of the uncertainty variables. From the information that is collected normally for a progress update of the tactical plan and by simulating the project environment, the combined impact of the uncertainty variables is predicted for each progress period. By incorporating the combined impact in the duration estimates of each activity, the new activity duration distribution is generated. From these activity duration distributions, the probability of achieving the original project completion time and of completing the project at any other time is computed.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Ahuja, H. N., and Nandakumar, V., “Enhancing Reliability of Project Duration Forecast,” Transactions of American Association of Cost Engineers, 28th Annual Meeting, Montreal, Canada, June, 1984.
2.
Ahuja, H. N., Project Management; Techniques in Planning and Controlling Construction Projects, John Wiley and Sons, New York, NY, Apr., 1984.
3.
Baldwin, J. R., and Mantres, J. M., “Causes of Delay in Construction Industry,” ASCE, Journal of the Construction Engineering Division, Vol. 97, No. CO2, Nov., 1971.
4.
Borcherding, J. D., and Sebastian, S. J., “Major Factors Influencing Craft Productivity in Nuclear Power Plant Construction,” Transactions of the American Association of Cost Engineers, Vol. I, 24th Annual Meeting, Washington, DC, July, 1980.
5.
Carr, R. I., “Simulation of Construction Project Duration,” ASCE, Journal of the Construction Engineering Division, Vol. 105, June, 1979.
6.
Gates, M., and Scarpa, A., “Learning and Experience Curves,” ASCE, Journal of the Construction Engineering Division, Vol. 98, Mar., 1972.
7.
Halpin, D. W., and Woodhead, R. W., “CONSTRUCTO: A Computerized Construction Management Game,” Univ. of Illinois, Urbana, IL, Dec., 1970.
8.
Lorenzoni, A. B., “Productivity—Everybody's Business and It can be Controlled,” Cost Engineering, Vol. 21, No. 5, Sept./Oct., 1979, pp. 189–192.
9.
O'Brien, CPM in Construction Management, McGraw Hill Book Company Limited, New York, NY.
10.
Parviz, F., “Analysis of Working Space Congestion from Scheduling Data,” Transactions of the American Association of Cost Engineers, Vol. F‐41, 24th Annual Meeting, Washington, DC, July, 1980.
11.
Suhanic, G., “Change Orders Impact on Construction Cost and Schedule,” Transactions of the American Association of Cost Engineers, Vol. F‐3, 24th Annual Meeting, Washington, DC, July, 1980.
Information & Authors
Information
Published In
Copyright
Copyright © 1985 ASCE.
History
Published online: Dec 1, 1985
Published in print: Dec 1985
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.