Simulation Model to Forecast Project Completion Time

Publication: Journal of Construction Engineering and Management
Volume 111, Issue 4

Abstract

Project cost is most sensitive to its schedule. The construction project environment comprising dynamic, uncertain, but predictable, variables such as weather, space congestion, workmen absenteeism, etc., is changing continuously, affecting activity durations. The reliability of project duration forecast can be enhanced by an explicit analysis to determine the variation in activity durations caused by the dynamic variables. A computer model is used to simulate the expected occurrence of the uncertainty variables. From the information that is collected normally for a progress update of the tactical plan and by simulating the project environment, the combined impact of the uncertainty variables is predicted for each progress period. By incorporating the combined impact in the duration estimates of each activity, the new activity duration distribution is generated. From these activity duration distributions, the probability of achieving the original project completion time and of completing the project at any other time is computed.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Ahuja, H. N., and Nandakumar, V., “Enhancing Reliability of Project Duration Forecast,” Transactions of American Association of Cost Engineers, 28th Annual Meeting, Montreal, Canada, June, 1984.
2.
Ahuja, H. N., Project Management; Techniques in Planning and Controlling Construction Projects, John Wiley and Sons, New York, NY, Apr., 1984.
3.
Baldwin, J. R., and Mantres, J. M., “Causes of Delay in Construction Industry,” ASCE, Journal of the Construction Engineering Division, Vol. 97, No. CO2, Nov., 1971.
4.
Borcherding, J. D., and Sebastian, S. J., “Major Factors Influencing Craft Productivity in Nuclear Power Plant Construction,” Transactions of the American Association of Cost Engineers, Vol. I, 24th Annual Meeting, Washington, DC, July, 1980.
5.
Carr, R. I., “Simulation of Construction Project Duration,” ASCE, Journal of the Construction Engineering Division, Vol. 105, June, 1979.
6.
Gates, M., and Scarpa, A., “Learning and Experience Curves,” ASCE, Journal of the Construction Engineering Division, Vol. 98, Mar., 1972.
7.
Halpin, D. W., and Woodhead, R. W., “CONSTRUCTO: A Computerized Construction Management Game,” Univ. of Illinois, Urbana, IL, Dec., 1970.
8.
Lorenzoni, A. B., “Productivity—Everybody's Business and It can be Controlled,” Cost Engineering, Vol. 21, No. 5, Sept./Oct., 1979, pp. 189–192.
9.
O'Brien, CPM in Construction Management, McGraw Hill Book Company Limited, New York, NY.
10.
Parviz, F., “Analysis of Working Space Congestion from Scheduling Data,” Transactions of the American Association of Cost Engineers, Vol. F‐41, 24th Annual Meeting, Washington, DC, July, 1980.
11.
Suhanic, G., “Change Orders Impact on Construction Cost and Schedule,” Transactions of the American Association of Cost Engineers, Vol. F‐3, 24th Annual Meeting, Washington, DC, July, 1980.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 111Issue 4December 1985
Pages: 325 - 342

History

Published online: Dec 1, 1985
Published in print: Dec 1985

Permissions

Request permissions for this article.

Authors

Affiliations

Hira N. Ahuja
Prof., Faculty of Engrg., Tech. Univ. of Nova Scotia, Halifax, Nova Scotia, Canada
V. Nandakumar
Sr. Proj. Engr., Metallurgical and Engrg. Consultants (India) Ltd. (MECON) India

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share