TECHNICAL PAPERS
Mar 1, 1984

Project Scheduling Using Fuzzy Set Concepts

Publication: Journal of Construction Engineering and Management
Volume 110, Issue 2

Abstract

Probabilistic methods are being used increasingly in construction engineering. However, when a parameter is expressed in linguistic rather than mathematical terms, classical probability theory fails to incorporate the information. The linguistic variables can be translated into mathematical measures using fuzzy set and system theory. A construction management problem, i.e., estimation of the duration of an activity, is solved using this theory. In order to implement the proposed technique, various membership functions need to be estimated using judgment or with the assistance of experts. The proposed technique is not sensitive to small variations in the membership values. This is a very desirable property. However, the method is sensitive to the choice of the fuzzy relations. The uncertainty in the fuzzy relations can be modeled along with other sources of uncertainty. The mean and variance of the parameters involved in the problem under consideration are estimated here using a new method. The method maximizes the product of the sum of the membership associations for a certain frequency of occurrence and the corresponding frequency of occurrence. One of the main advantages of the proposed technique is that it can be easily implemented in existing computer programs for project scheduling.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Ahuja, H. N., Construction Performance Control by Network, John Wiley & Sons, Inc., New York, N.Y., 1976, pp. 23–126.
2.
Ang, A. H.‐S., and Tang, W. H., Probability Concepts in Engineering Planning Design, Vol. 1, John Wiley & Sons, Inc., New York, N.Y., 1975.
3.
Anonymous, PERT Summary Report, Phase I, Special Project Office, Bureau of Naval Weapons, Department of Navy, Washington, D.C., July, 1958.
4.
Ayyub, B. M., and Haldar, A., “Practical Structural Reliability Techniques,” Journal of Structural Engineering, ASCE (to be published).
5.
Benjamin, N. B. H., and Davis, C., “The Impact of Weather on Construction Planning,” presented at the October 18–22,1971, ASCE Annual and National Environmental Engineering Meeting, held at St. Louis, Mo. (Preprint 1551).
6.
Benjamin, B. H., and Greenwald, T. W., “Simulating Effects of Weather on Construction,” Journal of the Structural Engineering Division, ASCE, Vol. 99, No. CO1, Proc. Paper 9888, July, 1973, pp. 389–404.
7.
Blockley, D. L., “Analysis of Structural Failures,” Proceedings, Institution of Civil Engineers, Vol. 62, Part 1, Feb., 1977.
8.
Blockley, D. L., “Predicting the Likelihood of Structural Accidents,” Proceedings, Institution of Civil Engineers, Vol. 59, Part 2, Dec., 1975.
9.
Blockley, D. L., “The Role of Fuzzy Sets in Civil Engmeering,” Fuzzy Sets and Systems, Vol. 2, North‐Holland Publishing Co., Amsterdam, The Netherlands, 1979, pp. 267–278.
10.
Brown, C. B., “A Fuzzy Safety Measure,” Journal of the Engineering Mechanics Division, ASCE, Vol. 105, Proc. Paper 14915, Oct., 1979, pp. 855–872.
11.
Buchert, K. P., “Use of Weather Information in Planning Shell Construction,” Proceedings, International Association of Shell Structures, Conference on Shell Structures and Climatic Conditions, July, 1972, pp. 95–102.
12.
Davis, C. S., “Construction Project Simulation Effects of Weather,” thesis presented to the University of Missouri, at Columbia, Mo., in 1972, in partial fulfillment of the requirements for the degree of Master of Science.
13.
Fazar, W., “The Origin of PERT,” The Controller, Vol. 30, Dec., 1962, p. 598.
14.
Haldar, A., “Statistical Methods,” Numerical Methods in Geomechanics, J. B. Martins, ed., NATO Advanced Study Institute Series, D. Reidel Publishing Company, Boston, Mass., 1981, pp. 473–506.
15.
Halpin, D. W., and Woodhead, R. W., Construction Management, John Wiley & Sons, Inc., New York, N.Y., 1980, pp. 313–337.
16.
Ishizuka, M., Fu, K. S., and Yao, J. T. P., “A Rule‐Inference Method for Damage Assessment,” ASCE, St. Louis, Mo., Oct., 1981, (Preprint 81–502).
17.
Kaufmann, A., Introduction to the Theory of Fuzzy Subsets, Academic Press, New York, N.Y., 1975.
18.
Kelley, J. E., Jr., “Critical Path Planning and Scheduling: Mathematical Basis,” Operations Research, Vol. 9, No. 3, 1961, pp. 296–320.
19.
Miller, R. W., Schedule Cost and Profit Control with PERT, McGraw‐Hill Book Co., New York, N.Y., 1963.
20.
O'Brien, J. J., CPM in Construction Management, McGraw‐Hill Book Co., New York, N.Y., 1965.
21.
O'Brien, J. J., (ed.), Scheduling Handbook, McGraw‐Hill Book Co., New York, N.Y., 1969.
22.
Yao, J. T. P., “Damage Assessment of Existing Structures,” Journal of the Engineering Mechanics Division, ASCE, Vol. 106, No. EM4, Proc. Paper 15653, Aug., 1980, pp. 785–799.
23.
Zadeh, L. A., “Fuzzy Sets,” Information and Control, Vol. 8, 1965, pp. 338–353.
24.
Zadeh, L. A., “Outline of a New Approach to the Analysis of Complex Systems and Decision Processes,” IEEE Transactions on Systems, Man and Cybemetics, Vol. SMC‐3, No. 1, Jan., 1973, pp. 28–44.
25.
Zadeh, L. A., “Probability Measures of Fuzzy Events,” Journal of Mathematical Analysis and Applications, Vol. 23, 1968, pp. 421–427.
26.
Zadeh, L. A., Fu, K. S., Tamaka, K., and Shimara, J., Fuzzy Sets and Their Application to Cognitive and Decision Processes, Academic Press, New York, N.Y., 1975.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 110Issue 2March 1984
Pages: 189 - 204

History

Published online: Mar 1, 1984
Published in print: Mar 1984

Permissions

Request permissions for this article.

Authors

Affiliations

Bilal M. Ayyub
Asst. Prof., Dept. of Civ. Engrg., Univ. of Maryland, College Park, Md. 20742
Achintya Haldar, M. ASCE
Asst. Prof., School of Civ. Engrg., Georgia Inst. of Tech., Atlanta, Ga. 30332

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share