TECHNICAL PAPERS
Dec 1, 1983

Long‐Range Forecasting Highway Construction Costs

Publication: Journal of Construction Engineering and Management
Volume 109, Issue 4

Abstract

In the process of decision making for design and execution of highway construction projects, long‐range cost forecasting is one of the most significant and complicated problems. This paper describes the development of a model that enables the user to make long‐range cost projections, taking into consideration general characteristics of the highway construction industry, as well as pertinent local conditions. The model presented uses conventional statistical methods to represent the main categories of typical jobs in the highway construction industry. From these categories, a composite model is created by assigning different weights to the input elements costs and then choosing a series of indicators to predict price trends for each separate element of the composite model. Use of this model reveals that bid volume in a certain area is a factor that has significant influence upon cost forecasts. This paper is accompanied by a case study based on actual data from highway construction projects performed for the Florida Department of Transportation in the years 1968–1981.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Box, G. E. P., and Jenkins, G. M., “Time Series Analysis, Forecasting and Control,” Holden‐Dax Inc., San Francisco, Calif., 1970.
2.
Carpenter, C. M., “Simultaneous Inflation and Unemloyment,” The Routes of Inflation, Burt Franklin Co., 1975.
3.
Cox, D. R., “Prediction by Exponentially Weighted Moving Average and Related Methods,” Journal of the Royal Statistical Society, Series B, London, England, Vol. 23, 1961, pp. 414–422.
4.
Foster, J., Gregory, M., “Inflation Expectation: The Use of Qualitative Survey Data,” Applied Economics, Vol. 9, Dec., 1977, pp. 319–329.
5.
Globerman, S., and Basel, Jr., “Comparison of Alternative Inflation Forecasts,” Business Economics, Vol. II, Sept., 1976, pp. 60–64.
6.
Herbsman, Z., “Development of Mathematical Model for Estimating and Updating of Construction Inputs,” D.Sc. thesis published by Technion, Haifa, Israel, Apr., 1977.
7.
Herbsman, Z., “Indexed Contracts the Solution for Bidding in Times of Inflation,” Transaction of the 7th International Cost Engineering Congress, pp. A6 (1–10).
8.
Hipel, K. W., McLeod, A. I., and Lennox, W. C., “Advances Box‐Jenkins Modelling,” Part 2, Applications, Water Resources Research, Vol. 13, No. 3, June, 1977, pp. 577–586.
9.
Hudson, J., “Expectation of Wage Inflation and Their Formation,” Applied Economics, Vol. 10, 1973, pp. 195–201.
10.
Koppula, S. D., “Forecasting Engineering Costs: Two Case Studies,” Journal of the Construction Division, ASCE, Vol. 107, No. CO4, Dec., 1981, pp. 733–743.
11.
Lahiri, K., “Inflation Expectation—Their Formation and Interest Rate Effects,” American Economic Review, Vol. 66, No. 1, Mar., 1976.
12.
Leroy, “Inflation Rates and the Inflation Premium,” Report of Federal Bank of Kansas City, May, 1973.
13.
Levi, M. D., and Makin, J. H., “Anticipated Inflation and Interest Rates Future Interpretation of Findings on the Fisher Equation,” American Economic Review, Vol. 68, Oct., 1978, pp. 801–812.
14.
McMahon, L. A., “Analysis of Factors that Cause Inflation,” Transactions, American Association of Cost Engineers, 1978, pp. 36–39.
15.
Olsen, R. A., “Empirical Investigation of the Association Between Common Stock Returns and Uncertain Inflation,” Review of Business and Economics, Vol. 16, Winter, 1980–81, pp. 56–67.
16.
F. H. W. A., “Request for Proposal DTFH61‐80‐C‐00045,” Office of Program and Policy Planning, the Federal Highway Administration, Washington, D.C., 20540, Dec., 1980.
17.
Rhea, N. W., “Methods for Predicting the Basic Rate of Inflation,” Business Economics, Vol. 16, Jan., 1981, pp. 90–91.
18.
Saunders, P., “Inflation Expectation and the National Rate of Unemployment,” Applied Economics, Vol. 10, 1978, pp. 187–193.
19.
Spitaller, E., “Inflationary Expectations and Trade Off Between Unemployment and Inflation in the United States,” International Monetary Fund Staff Papers, Vol. 22, Nov., 1975, pp. 775–790.
20.
Winters, P. R., “Forecasting Sales by Exponentially Weighted Moving Averages,” Management Science, Vol. 6, No. 3, Apr., 1960, pp. 324–342.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 109Issue 4December 1983
Pages: 423 - 434

History

Published online: Dec 1, 1983
Published in print: Dec 1983

Permissions

Request permissions for this article.

Authors

Affiliations

Zohar Herbsman, M. ASCE
Assoc. Prof., Dept. of Civ. Engrg., Univ. of Florida, Gainesville, Fla

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share