Free access
Corrections
Sep 25, 2021

Erratum for “Heuristic Methods for Finance-Based and Resource-Constrained Project Scheduling Problem” by Wanlin Liu, Jingwen Zhang, and Wanjun Liu

You are viewing the correction.
VIEW THE CORRECTED ARTICLE
Publication: Journal of Construction Engineering and Management
Volume 147, Issue 12
Eq. (18) in the original paper included a typographical error resulting in the incorrect notation for profit. The correct notation is PF. The corrected equation is included herein:
Maximize:PF=CP-TC
(18)
To preserve the published version of record, these details have been corrected only in this erratum.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 147Issue 12December 2021

History

Received: Aug 25, 2021
Accepted: Aug 26, 2021
Published online: Sep 25, 2021
Published in print: Dec 1, 2021
Discussion open until: Feb 25, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Ph.D. Student, School of Management, Northwestern Polytechnical Univ., Xi’an 710072, China. Email: [email protected]
Professor, School of Management, Northwestern Polytechnical Univ., Xi’an 710072, China (corresponding author). ORCID: https://orcid.org/0000-0003-4519-5502. Email: [email protected]
Ph.D. Student, School of Management, Northwestern Polytechnical Univ., Xi’an 710072, China. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share