Technical Papers
Jun 28, 2019

Analysis of Impartial Implementation in Practice of Risk Identification in Technical Projects

Publication: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
Volume 5, Issue 3

Abstract

Risk identification in the case of technical projects is an issue that has been extensively studied in many previous research efforts; however, a thorough study of the respective literature clearly reveals a methodological and application gap between research and practice, which is further increased by a wide discrepancy of definitions and procedures applied. This paper proposes the consideration of risk sources in the risk identification process as a means to bridge the identified gap and reduce discrepancy. The paper presents the results of the processing and analysis of real projects’ risk data through unstructured interviews with the experts who provided the data, and examines their correlation with a comprehensive risk sources checklist drawn from previous research. The results of this cross-checking clearly highlighted the extensive misconceptions of the related terms and notions in practice (e.g., what is perceived as risk identification is actually risk source identification), as well as the partial implementation of procedures that reflects a similar partial approach to technical project risk analysis in practice (e.g., the risk sources actually identified are fewer than those that could be identified through a holistic approach to technical project risk analysis). These results draw attention to the need for more-focused risk source–related research, because the new paradigm shift in technical project risk analysis highlights the importance of risk sources.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The authors warmly acknowledge the invested time and cooperation of all the experts who participated in the unstructured interviews.

References

Amiri, M., A. Ardeshir, and M. H. F. Zarandi. 2017. “Fuzzy probabilistic expert system for occupational hazard assessment in construction.” Saf. Sci. 93 (Mar): 16–28. https://doi.org/10.1016/j.ssci.2016.11.008.
Bosher, L., A. Dainty, P. Carrillo, J. G. And, and A. Price. 2007. “Integrating disaster risk management into construction: AUK perspective.” Build. Res. Inf. 35 (2): 163–177. https://doi.org/10.1080/09613210600979848.
BSI (British Standard Institution). 2010. Project management. Principles and guidelines for the management of projects. BS 6079-1. London: BSI.
Chiarini, A. 2017. “Risk-based thinking according to ISO 9001:2015 standard and the risk sources European manufacturing SMEs intend to manage.” TQM J. 29 (2): 310–323. https://doi.org/10.1108/TQM-04-2016-0038.
Dang, C. N., L. Le-Hoai, S. Y. Kim, C. V. Nguyen, Y. D. Lee, and S. H. Lee. 2017. “Identification of risk patterns in Vietnamese road and bridge construction: Contractor’s perspective.” Built Environ. Project Asset Manage. 7 (1): 59–72. https://doi.org/10.1108/BEPAM-11-2015-0065.
Ding, L. Y., H. L. Yu, H. Li, C. Zhou, X. G. Wu, and M. H. Yu. 2012. “Safety risk identification system for metro construction on the basis of construction drawings.” Autom. Constr. 27 (Nov): 120–137. https://doi.org/10.1016/j.autcon.2012.05.010.
Ding, L. Y., B. T. Zhong, S. Wu, and H. B. Luo. 2016. “Construction risk knowledge management in BIM using ontology and semantic web technology.” Saf. Sci. 87 (Aug): 202–213. https://doi.org/10.1016/j.ssci.2016.04.008.
Farina, L., E. Danesi, A. Travaglini, M. Mancini, and P. Trucco. 2018. “Integration of constructability and project risk management.” In Closing the gap between practice and research in industrial engineering, edited by E. Viles, M. Ormazábal, and E. Lleó, 313–321. Cham, Switzerland: Springer.
Flanagan, R., and G. Norman. 1993. Risk management and construction. Hoboken, NJ: Blackwell Science.
Gemünden, H. G., P. Lehner, and A. Kock. 2018. “The project-oriented organization and its contribution to innovation.” Int. J. Project Manage. 36 (1): 147–160. https://doi.org/10.1016/j.ijproman.2017.07.009.
ISO (International Organization for Standardization). 2015. Quality management systems-requirements. ISO 9001. Geneva: ISO.
Kang, L. S., S. K. Kim, H. S. Moon, and H. S. Kim. 2013. “Development of a 4D object-based system for visualizing the risk information of construction projects.” Autom. Constr. 31 (May): 186–203. https://doi.org/10.1016/j.autcon.2012.11.038.
Khumpaisal, Z. C. S. 2009. “An analytic network process for risks assessment in commercial real estate development.” J. Property Investment Finance 27 (3): 238–258. https://doi.org/10.1108/14635780910951957.
Kifokeris, D., and Y. Xenidis. 2018. “Application of linguistic clustering to define sources of risks in technical projects.” J. Risk Uncertainty Eng. Syst. Part A Civ. Eng. 4 (1): 04017031. https://doi.org/10.1061/AJRUA6.0000938.
Kivilä, J., M. Martinsuo, and L. Vuorinen. 2017. “Sustainable project management through project control in infrastructure projects.” Int. J. Project Manage. 35 (6): 1167–1183. https://doi.org/10.1016/j.ijproman.2017.02.009.
Kokangül, A., U. Polat, and C. Dağsuyu. 2017. “A new approximation for risk assessment using the AHP and Fine Kinney methodologies.” Saf. Sci. 91 (Jan): 24–32. https://doi.org/10.1016/j.ssci.2016.07.015.
Liu, J., F. Jin, Q. Xie, and M. Skitmore. 2017. “Improving risk assessment in financial feasibility of international engineering projects: A risk driver perspective.” Int. J. Project Manage. 35 (2): 204–211. https://doi.org/10.1016/j.ijproman.2016.11.004.
Mojtahedi, S. M. H., S. M. Mousavi, and A. Makui. 2010. “Project risk identification and assessment simultaneously using multi-attribute group decision making technique.” Saf. Sci. 48 (4): 499–507. https://doi.org/10.1016/j.ssci.2009.12.016.
Nasirzadeh, F., A. Afshar, M. Khanzadi, and S. Howick. 2008. “Integrating system dynamics and fuzzy logic modelling for construction risk management.” Constr. Manage. Econ. 26 (11): 1197–1212. https://doi.org/10.1080/01446190802459924.
Odimabo, O. O., C. F. Oduoza, and S. Suresh. 2017. “Methodology for project risk assessment of building projects using Bayesian belief networks.” Int. J. Constr. Eng. Manage. 6 (6): 221–234. https://doi.org/10.5923/j.ijcem.20170606.01.
Patton, M. Q. 2005. “Qualitative research.” In Vol. 3 of Encyclopedia of statistics in behavioral science, edited by B. S. Everitt and D. C. Howell, 1633–1636. New York: Wiley.
Poon, J., K. Potts, and P. Cooper. 1999. “Development of a new best practice model for building projects.” In Vol. 2 of Proc., 15th Annual ARCOM Conf., edited by W. Hughes, 705–714. Liverpool, UK: Association of Researchers in Construction Management.
Qu, Y. 2017. “Computer-assisted content analysis in risk identification of public-private partnership projects.” In Vol. 10676 of Proc., Emerging Technologies for Education—SETE 2017, edited by T. C. Huang, R. Lau, Y. M. Huang, M. Spaniol, and C. H. Yuen. Cham, Switzerland: Springer.
Raviv, G., A. Shapira, and B. Fishbain. 2017. “AHP-based analysis of the risk potential of safety incidents: Case study of cranes in the construction industry.” Saf. Sci. 91 (Jan): 298–309. https://doi.org/10.1016/j.ssci.2016.08.027.
Robinson, O. C. 2014. “Sampling in interview-based qualitative research: A theoretical and practical guide.” Qual. Res. Psychol. 11 (1): 25–41. https://doi.org/10.1080/14780887.2013.801543.
Saghatforoush, E., B. Trigunarsyah, and E. G. Too. 2012. “Assessment of operability and maintainability success factors in provision of extended constructability principles.” In Proc., 9th Int. Congress on Civil Engineering. Isfahan, Iran: Civilica Encyclopedia of Civil Engineering.
Salah, A., and O. Moselhi. 2016. “Risk identification and assessment for engineering procurement construction management projects using fuzzy set theory.” Can. J. Civ. Eng. 43 (5): 429–442. https://doi.org/10.1139/cjce-2015-0154.
Serpella, A. F., X. Ferrada, R. Howard, and L. Rubio. 2014. “Risk management in construction projects: A knowledge-based approach.” Procedia Social Behav. Sci. 119 (Mar): 653–662. https://doi.org/10.1016/j.sbspro.2014.03.073.
Singh, V. P., S. K. Jain, and A. Tyagi. 2007. Risk and reliability analysis: A handbook for civil and environmental engineers. Reston, VA: ASCE.
Smith, N. J., T. Merna, and P. Jobling. 2014. Managing risk in construction projects. 3rd ed. Oxford, UK: Blackwell.
Titarenko, B. P., S. M. Lubkin, S. Y. Eroshkin, and M. A. Kameneva. 2017. “Robust and traditional methods of risk management in investment and construction projects.” In Proc., 10th Int. Conf. on Management of Large-Scale System Development (MLSD)–2017, 1–4. New York: IEEE.
Youssef, A., H. Osman, M. Georgy, and N. Yehia. 2018. “Semantic risk assessment for ad hoc and amended standard forms of construction contracts.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 10 (2): 04518002. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000253.
Zhang, L., X. Wu, L. Ding, M. J. Skibniewski, and Y. Lu. 2016. “BIM-based risk identification system in tunnel construction.” J. Civ. Eng. Manage. 22 (4): 529–539. https://doi.org/10.3846/13923730.2015.1023348.
Zhong, B., and Y. Li. 2015. “An ontological and semantic approach for the construction risk inferring and application.” J. Intell. Rob. Syst. 79 (3–4): 449–463. https://doi.org/10.1007/s10846-014-0107-9.

Information & Authors

Information

Published In

Go to ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
Volume 5Issue 3September 2019

History

Received: Aug 23, 2018
Accepted: Jan 14, 2019
Published online: Jun 28, 2019
Published in print: Sep 1, 2019
Discussion open until: Nov 28, 2019

Permissions

Request permissions for this article.

Authors

Affiliations

Ph.D. Candidate, Dept. of Civil Engineering, Aristotle Univ. of Thessaloniki, University Campus, Thessaloniki 54124, Greece. ORCID: https://orcid.org/0000-0003-4186-8730. Email: [email protected]
Assistant Professor, Dept. of Civil Engineering, Aristotle Univ. of Thessaloniki, University Campus, Thessaloniki 54124, Greece (corresponding author). ORCID: https://orcid.org/0000-0002-1415-2051. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share