Technical Papers
Nov 2, 2021

Understanding Disputes in Modular Construction Projects: Key Common Causes and Their Associations

Publication: Journal of Construction Engineering and Management
Volume 148, Issue 1

Abstract

Modularization is a well-known approach that can potentially mitigate many of the current construction industry’s challenges including, for example, poor productivity, shortages in skilled labors, and poor safety performance. Recent studies have shown that contractual risks and disputes are still considered one of the top factors affecting the performance of modular processes. Many research efforts have analyzed disputes and their causes in the construction industry, but none of them addressed the unique and complex sources of disputes that could be associated with the use of modularization. The goal of this paper is to investigate dispute causation in modular construction projects. To this end, this study adopted an integrated multistep analytical research methodology. First, the authors collected and analyzed a total of 39 publicly available law cases of modular construction disputes in the US. Second, social network analysis was performed to identify the most common causes leading to disputes in modular construction projects. Third, spectral clustering was conducted to group the dispute causes based on the strength of their interconnectivities. Fourth, association rule analysis and Apriori algorithms were used to identify key associations of causes that would most likely trigger modular construction disputes. The results indicated that payment holds and delays, delay in project completion, poor communication among the project stakeholder, and lack of collaboration between various trades are common causes of disputes in modular construction projects. Also, as the authors were able to cluster the 40 identified causes of disputes into four clusters, the most significant associations of dispute causes were determined and quantified within each identified cluster. Further, the findings reflected that modular construction disputes are mostly triggered by the occurrence of multiple causes rather than by just a single cause. This paper adds to the body of knowledge by helping practitioners manage and control sources of disputes in modular construction projects. This should help to minimize dispute occurrence during modular processes, and thus maximize capitalization on modularization benefits. Ultimately, the outcomes of this paper should direct researchers and industry practitioners toward the contractual aspects of modularization that require appropriate adjustments and revision so as to better account for the uniqueness of modular processes within today’s complex construction industry.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data and code generated or used during the study appear in the published article.

Acknowledgments

This study was conducted through the financial support provided by the Missouri Consortium for Construction Innovation (MO-CCI) as represented by its member companies, including McCarthy Building Companies, Brinkman Constructors, Arco Construction, Clayco, BJC Healthcare, Alberici, Patric Corporation, and Greensfelder.

References

Abdou, A., M. Haggag, and O. Al Khatib. 2016. “Use of building defect diagnosis in construction litigation: Case study of a residential building.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 8 (1): C4515007. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000177.
Abdul Nabi, M., and I. H. El-adaway. 2020. “Modular construction: Determining decision-making factors and future research needs.” J. Manage. Eng. 36 (6): 04020085. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000859.
Abdul Nabi, M., and I. H. El-adaway. 2021. “Understanding the key risks affecting cost and schedule performance of modular construction projects.” J. Manage. Eng. 37 (4): 04021023. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000917.
Abdul Nabi, M., I. H. El-adaway, S. Fayek, C. Howell, and J. Gambatese. 2020. “Contractual guidelines for construction safety-related issues under design-build standard forms of contract.” J. Constr. Eng. Manage. 146 (7): 04020074. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001855.
Abotaleb, I. S., and I. H. El-adaway. 2019. “A network-based methodology for quantitative knowledge gap identification in construction simulation and modeling research.” In Computing in civil engineering 2019: Visualization, information modeling, and simulation, 522–529. Reston, VA: ASCE.
Agrawal, R., H. Road, and S. Jose. 1993. “Mining association rules between sets of items in large databases.” In Proc., 1993 ACM SIGMOD Int. Conf. on Management of Data. New York: Association for Computing Machinery.
Ahmad, V. 2019. Icon legacy custom modular homes. New York: Appellate Div. of the Supreme Court of New York.
Ali, G. G., R. Khalef, I. H. El-adaway, M. Eid, T. Kahle, C. Funke, C. Vaupel, and A. Nault. 2021. “Joint venture agreements for construction and professional services: Comparative contractual analysis and guidelines.” J. Manage. Eng. 37 (4): 04021039. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000940.
Aljassmi, H., S. Han, and S. Davis. 2014. “Project pathogens network: New approach to analyzing construction-defects-generation mechanisms.” J. Constr. Eng. Manage. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000774. 140 (1): 04013028.
Alsamadani, R., M. R. Hallowell, A. Javernick-Will, and J. Cabello. 2013. “Relationships among language proficiency, communication patterns, and safety performance in small work crews in the United States.” J. Constr. Eng. Manage. 139 (9): 1125–1134. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000724.
Alwisy, A., M. Al-Hussein, and S. H. Al-Jibouri. 2012. “BIM approach for automated drafting and design for modular construction manufacturing.” In Computing in civil engineering (2012), 221–228. Reston, VA: ASCE.
Ameripod. 2017. LLC v. Davisreed Construction Inc., No. 3: 17-cv-00747-H-WVG (S.D. Cal. July 11, 2017). New York: US District Court.
Arashpour, M., B. Abbasi, M. Arashpour, M. R. Hosseini, and R. Yang. 2017. “Integrated management of on-site, coordination and off-site uncertainty: Theorizing risk analysis within a hybrid project setting.” Int. J. Project Manage. 35 (4): 647–655. https://doi.org/10.1016/j.ijproman.2017.02.016.
Arcadis, N. V. 2019. Global construction disputes report. Amsterdam, Netherlands: Arcadis.
Arif, M., N. Blismas, and R. Wakefield. 2009. “Drivers, constraints and the future of offsite manufacture in Australia.” Constr. Innov. 9 (1): 72–83. https://doi.org/10.1108/14714170910931552.
Artan Ilter, D., and G. Bakioglu. 2018. “Modeling the relationship between risk and dispute in subcontractor contracts.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 10 (1): 04517022. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000246.
Assaad, R., and I. H. El-adaway. 2021. “Determining critical combinations of safety fatality causes using spectral clustering and computational data mining algorithms.” J. Constr. Eng. Manage. 147 (5): 04021035. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002040.
Assaad, R., I. H. El-adaway, A. H. El Hakea, M. J. Parker, T. I. Henderson, C. R. Salvo, and M. O. Ahmed. 2020. “Contractual perspective for BIM utilization in US construction projects.” J. Constr. Eng. Manage. 146 (12): 04020128. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001927.
Assah-Kissiedu, M., F. D. K. Fugar, and E. Badu. 2010. “Triggers of disputes within the Ghanaian construction industry.” In Proc., 5th Built Environment Conf., 17–28. Bellville, South Africa: Association of Schools of Construction of Southern Africa.
Atlantic Natural BK. 1978. ETC. v. Modular Age, Inc., 363 So. 2d 1152 (Fla. Dist. Ct. App. 1978). Tallahassee, FL: District Court of Appeal of Florida.
Azghandi-Roshnavand, A. 2019. “Evaluation of construction contract documents to be applied in modular construction focusing ambiguities; a text processing approach.” Doctoral dissertation, Dept. of Building, Civil and Environmental Engineering, Concordia Univ.
Banxia. 2017. Decision explorer: User’s guide version 3.5.0. Kendal, UK: Banxia Software.
Barbosa, F., J. Woetzel, J. Mischke, M. J. Ribeirinho, M. Sridhar, M. Parsons, M. Bertram, and S. Brown. 2017. Reinventing construction: A route to higher productivity. New York: McKinsey & Company.
Barham Construction, Inc. 2011. v. City of Riverbank, No. F058692 (Cal. Ct. App. Aug. 8, 2011). Fresno, CA: Court of Appeals of California.
Barham Construction, Inc. 2015. v. City of Riverbank, No. F068373 (Cal. Ct. App. July 21, 2015). Fresno, CA: Court of Appeals of California.
Barman, A., and C. Charoenngam. 2017. “Decisional uncertainties in construction projects as a cause of disputes and their formal legal interpretation by the courts: Review of legal cases in the United Kingdom.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 9 (3): 04517011. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000222.
Bateman, V. 2020. CMH Homes, Inc., Civil Action No. 3: 19-0449 (S.D.W. Va. Feb. 6, 2020). Charleston, WV: US District Court for the Southern District of West Virginia.
Breaux, V. 2020. Home First Agency Inc., No. 2: 20-Cv-00168 (W.D. La. Oct. 22, 2020). Louisiana, Alexandri: US District Court.
Brennan-Centrella, V. 2019. Ritz-Craft Corp. of Penns., 942 F.3d 106 (2d Cir. 2019). New York: US Court of Appeals.
Cakmak, E., and P. I. Cakmak. 2014. “An analysis of causes of disputes in the construction industry using analytical network process.” In Procedia—Social and behavioral sciences, 183–187. Amsterdam, Netherlands: Elsevier.
Chan, E. H. W., and H. C. H. Suen. 2005. “Disputes and dispute resolution systems in Sino-foreign joint venture construction projects in China.” J. Civ. Eng. Educ. 131 (2): 141–148. https://doi.org/10.1061/(ASCE)1052-3928(2005)131:2(141.
Chang, K., and S. Chi. 2019. “Bridge clustering for systematic recognition of damage patterns on bridge elements.” J. Comput. Civ. Eng. 33 (5): 04019028. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000846.
Chen, L., S. Huang, C. Yang, and Q. Chen. 2020. “Analyzing factors that influence expressway traffic crashes based on association rules: Using the Shaoyang–Xinhuang section of the Shanghai–Kunming expressway as an example.” J. Transp. Eng. Part A: Syst. 146 (9): 05020007. https://doi.org/10.1061/JTEPBS.0000425.
Cheng, C. W., C. C. Lin, and S. S. Leu. 2010. “Use of association rules to explore cause–effect relationships in occupational accidents in the Taiwan construction industry.” Saf. Sci. 48 (4): 436–444. https://doi.org/10.1016/j.ssci.2009.12.005.
Cheung, S. O., and K. H. Y. Pang. 2013. “Anatomy of construction disputes.” J. Constr. Eng. Manage. 139 (1): 15–23. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000532.
Cheung, S. O., H. C. Suen, and T. L. Lam. 2002. “Fundamentals of alternative dispute resolution processes in construction.” J. Constr. Eng. Manage. 128 (5): 409–419.
Choi, J., and H. Song. 2014. “Evaluation of the modular method for industrial plant construction projects.” Int. J. Constr. Manage. 14 (3): 171–180. https://doi.org/10.1080/15623599.2014.922728.
Choi, J. O., J. T. O’Connor, and T. W. Kim. 2016. “Recipes for cost and schedule successes in industrial modular projects: Qualitative comparative analysis.” J. Constr. Eng. Manage. 142 (10): 04016055. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001171.
CMH Homes, Inc. 2020. v. Sexton, 441 F. Supp. 3d 1202 (D.N.M. 2020). Washington, DC: US District Court.
Diekmann, J. E., and M. J. Girard. 1995. “Are contract disputes predictable?” J. Constr. Eng. Manage. 121 (4): 355–363. https://doi.org/10.1061/(ASCE)0733-9364(1995)121:4(355).
District of Columbia Ex Rel. 2020. Z-modular, LLC v. MCN Build, Inc., No. 18-cv-2947 (RJL/GMH) (D.C. July 15, 2020). Washington, DC: US District Court.
Dodge, V. 2020. White’s Mobile Homes, Inc., 299 So. 3d 177 (La. Ct. App. 2020). New Orleans: Louisiana Third Circuit Court of Appeal.
Doub, A. E., M. L. Small, A. Levin, K. LeVangie, and T. R. Brick. 2016. “Identifying users of traditional and Internet-based resources for meal ideas: An association rule learning approach.” Appetite 103: 128–136. https://doi.org/10.1016/j.appet.2016.04.006.
Duncheva, T., and F. F. Bradley. 2019. “Multifaceted productivity comparison of off-site timber manufacturing strategies in Mainland Europe and the United Kingdom.” J. Constr. Eng. Manage. 145 (8): 04019043. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001641.
Enshassi, M. S., S. Walbridge, J. S. West, and C. T. Haas. 2019. “Integrated risk management framework for tolerance-based mitigation strategy decision support in modular construction projects.” J. Manage. Eng. 35 (4): 05019004. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000698.
Eteifa, S. O., and I. H. El-adaway. 2018. “Using social network analysis to model the interaction between root causes of fatalities in the construction industry.” J. Manage. Eng. 34 (1): 04017045. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000567.
Fateh, M. A. M., M. F. Mohammad, and A. S. Abd Shukor. 2017. “Review in formulating the standard form of contract for industrialized building system (IBS) construction approach in Malaysia.” In Vol. 87 of Proc., MATEC Web of Conf., 01001. Les Ulis, France: EDP Sciences.
FCRC Modular. 2016. LLC v. Skanska Modular LLC, 2016 N.Y. Slip Op 31494 (Sup. Ct. 2016). New York: New York County Supreme Court.
Feldt, V. 2015. Kan-Du Construction Corp., No. 12-1064-MLB (D. Kan. June 11, 2015). Kansas City, Topeka: US District Court of Kansas.
Freeman, L. C. 1978. “Centrality in social networks conceptual clarification.” Soc. Networks 1 (3): 215–239. https://doi.org/10.1016/0378-8733(78)90021-7.
Gardiner, P. D., and J. E. L. Simmons. 1998. “Conflict in small- and medium-sized projects: Case of partnering to the rescue.” J. Manage. Eng. 14 (1): 35–40. https://doi.org/10.1061/(ASCE)0742-597X(1998)14:1(35).
Giuffre, K. 2015. “Cultural production in networks.” In International encyclopedia of the social and behavioral sciences. Amsterdam, Netherlands: Elsevier.
Global Modular, Inc. 2017. v. Kadena Pacific, Inc., 15 Cal. App. 5th 127, 222 Cal. Rptr. 3d 819 (Ct. App. 2017). Santa Ana, CA: California Fourth District Court of Appeal.
Goh, E., and M. Loosemore. 2017. “The impacts of industrialization on construction subcontractors: A resource based view.” Constr. Manage. Econ. 35 (5): 288–304.
Gray Construction, Inc. 2020. v. Medline Industries, Inc., Civil Action No. GLR-19-3405 (D. Md. Sept. 30, 2020). Baltimore, MD: US District Court of Maryland.
Haas, C. T., J. T. O’Connor, R. L. Tucker, J. A. Eickmann, and W. R. Fagerlund. 2000. Prefabrication and preassembly trends and effects on the construction workforce. Austin, TX: Center for Construction Industry Studies, Univ. of Texas at Austin.
Hahsler, M., and K. Hornik. 2008. “New probabilistic interest measures for association rules.” Preprint, submitted October 1, 2007. http://arxiv.org/abs/0803.0966.
Hamzeh, F., O. Abdul Ghani, M. B. Saleh Bacha, and Y. Abbas. 2017. “Modular concrete construction: The differing perspectives of designers, manufacturers, and contractors in Lebanon.” Eng. Constr. Archit. Manage. 24 (6): 935–949. https://doi.org/10.1108/ECAM-11-2014-0148.
Htet, T. Z. 2019. “Prediction of web usages using apriori algorithm.” Int. J. Res. 6 (3): 663–669.
Hummon, N. P., and P. Doreian. 1990. “Computational methods for social network analysis.” Soc. Networks 12 (4): 273–288. https://doi.org/10.1016/0378-8733(90)90011-W.
Hwang, B. G., M. Shan, and K. Y. Looi. 2018. “Knowledge-based decision support system for prefabricated prefinished volumetric construction.” Auto. Constr. 94 (1): 168–178.
IBM (International Business Machine). 2019. “Lift in an association rule.” Accessed April 3, 2021. https://www.ibm.com/support/knowledgecenter/en/SSEPGG_11.1.0/com.ibm.im.model.doc/c_lift_in_an_association_rule.html.
Ilter, D. A., and G. Bakioglu. 2018. “Modeling the relationship between risk and dispute in subcontractor contracts.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 10 (1): 04517022. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000246.
Innovative Design and Building Services. 2014. LLC v. Arch Insurance Company, No. 12-cv-5474 (AJN) (S.D.N.Y. Sept. 23, 2014). New York: US District Court for the Southern District of New York.
Jahren, C. T., and B. F. Dammeier. 1990. “Investigation into construction disputes.” J. Manage. Eng. 6 (1): 39–46. https://doi.org/10.1061/(ASCE)9742-597X(1990)6:1(39).
Jaillon, L., and C. S. Poon. 2010. “Design issues of using prefabrication in Hong Kong building construction.” Constr. Manage. Econ. 28 (10): 1025–1042.
Jia, H., S. Ding, X. Xu, and R. Nie. 2014. “The latest research progress on spectral clustering.” Neural Comput. Appl. 24 (7): 14477–1486.
Johnsson, H. 2013. “Production strategies for pre-engineering in house-building: Exploring product development platforms.” Construct. Manage. Econ. 31 (9): 941–958. https://doi.org/10.1080/01446193.2013.828846.
Joshi, A. P. 2017. “Open source distributed spectral clustering.” Doctoral dissertation, Dept. of Computer Science, Univ. of Georgia.
Kagdi, H., M. L. Collard, and J. I. Maletic. 2007. “An approach to mining call-usage patterns with syntactic context.” In Proc., Twenty-Second IEEE/ACM Int. Conf. on Automated Software Engineering, 457–460. New York: Association for Computing Machinery.
Kaulkar, S., L. Vinodh, and P. Thompson. 2018. “Initial analysis of multivariate factors for prediction of shark presence and attacks on the coast of North Carolina.” In Proc., Int. Symp. on Methodologies for Intelligent Systems, 426–435. Cham, Switzerland: Springer.
K-Con Building Systems, Inc. 2017. v. US, No. 05-914C (Fed. Cl. Apr. 18, 2017). Washington, DC: US Court of Appeals for the Federal Circuit.
Kirchhoff-Consigli Construction Management. 2017. LLC v. Deluxe Building Systems, Inc., No. 4: 15-CV-01462 (M.D. Pa. Aug. 22, 2017). Scranton, PA: US District Court for the Middle District of Pennsylvania.
Kirchhoff-Consigli Construction Management. 2018. LLC v. Deluxe Building Systems, Inc., No. 4: 15-CV-01462 (M.D. Pa. June 29, 2018). Scranton, PA: US District Court for the Middle District of Pennsylvania.
Kisi, K. P., N. Lee, R. Kayastha, and J. Kovel. 2020. “Alternative dispute resolution practices in international road construction contracts.” J. Legal Aff. and Dispute Resol. Eng. Cons. 12 (2): 04520001.
Kumaraswamy, M. M. 1997. “Conflicts, claims and disputes in construction.” Eng. Constr. Archit. Manage. 4 (2): 95–111. https://doi.org/10.1108/eb021042.
Kumar Viswanathan, S., A. Panwar, S. Kar, R. Lavingiya, and K. N. Jha. 2020. “Causal modeling of disputes in construction projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (4): 04520035. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000432.
Larsson, J., P. E. Eriksson, T. Olofsson, and P. Simonsson. 2014. “Industrialized construction in the Swedish infrastructure sector: Core elements and barriers.” Construct. Manage. Econ. 32 (1–2): 83–96. https://doi.org/10.1080/01446193.2013.833666.
Lau, V., and East Coast Dormer, Inc. 2011. N.Y. Slip Op 31452 (Sup. Ct. 2011). Garden City, NY: Supreme Court of Nassau County.
Legal Information Institute. 2020. “Alternative dispute resolution.” Accessed June 17, 2021. https://www.law.cornell.edu/wex/alternative_dispute_resolution.
Leoff, V. S., and J Land Company. 2011. Civil Action No. 08-cv-02112-RPM (D. Colo. June 3, 2011). Denver: US District Court of District Colorado.
Liao, C. W., and Y. H. Perng. 2008. “Data mining for occupational injuries in the Taiwan construction industry.” Saf. Sci. 46 (7): 1091–1102. https://doi.org/10.1016/j.ssci.2007.04.007.
Lingard, H., P. Pirzadeh, and D. Oswald. 2019. “Talking safety: Health and safety communication and safety climate in subcontracted construction workgroups.” J. Constr. Eng. Manage. 145 (5): 04019029. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001651.
Liquidating Trustee Ester Du Val of KI Liquidation, Inc. 2014. v. US, No. 066-465C (Fed. Cl. June 11, 2014). Washington, DC: US Court of Federal Claims.
Liu, Q., G. Feng, N. Wang, and G. K. Tayi. 2018. “A multi-objective model for discovering high-quality knowledge based on data quality and prior knowledge.” Inf. Syst. Front. 20 (2): 401–416. https://doi.org/10.1007/s10796-016-9690-6.
Love, P. E. D., P. Davis, K. London, and T. Jasper. 2008. “Causal modeling of construction disputes.” In Proc., 24th Annual ARCOM Conf., 869–878. Cardiff, UK: Association of Researchers in Construction Management.
Luongo Const. & Dev., LLC v. 2017. MacFarlane, 170 A.3d 57, 176 Conn. App. 272 (App. Ct. 2017). Hartford, CT: Appellate Court of Connecticut.
Majestic Homes, Inc. 2017. v. Hurt, No. CV 16-08-BLG-SPW (D. Mont. Aug. 31, 2017). Billings, MT: US District Court, District Montana.
Marques, R. C. 2018. “Is arbitration the right way to settle conflicts in PPP arrangements?” J. Manage. Eng. 34 (1): 05017007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000564.
Mayo, V., and Mods International, Inc. 2020. W.I. App 31, 944 N.W.2d 361 (Wis. Ct. App. 2020). Wausau, WI: Court of Appeals of Wisconsin, District III.
Method, LLC v. 2018. Make It Right Foundation, No. CV 17-25-M-DLC (D. Mont. Feb. 1, 2018). Missoula, MT: US District Court, District Montana, Missoula Division.
Middle East Broadcasting Networks, Inc. 2017. v. MBI Global, LLC, No. 16-1004 (4th Cir. May 2, 2017). Richmond, VA: US Court of Appeals for the Fourth Circuit.
Modular Steel Systems, Inc. 2020. v. Fairfield University, No. 4: 20-CV-00752 (M.D. Pa. Sept. 24, 2020). Scranton, PA: US District Court for the Middle District of Pennsylvania.
Montella, A. 2011. “Identifying crash contributory factors at urban roundabouts and using association rules to explore their relationships to different crash types.” Accid. Anal. Prev. 43 (4): 1451–1463. https://doi.org/10.1016/j.aap.2011.02.023.
Nadim, W., and J. S. Goulding. 2010. “Offsite production in the UK: The way forward? A UK construction industry perspective.” Constr. Innov. 10 (2): 181–202. https://doi.org/10.1108/14714171011037183.
Ng, A. Y., M. I. Jordan, and Y. Weiss. 2002. “On spectral clustering: Analysis and an algorithm.” In Advances in neural information processing systems, 849–856. Cambridge, MA: MIT Press.
Nguyen, P. H., D. Tran, and B. C. Lines. 2020. “Fuzzy set theory approach to classify highway project characteristics for delivery selection.” J. Constr. Eng. Manage. 146 (5): 04020044. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001829.
O’Connor, J. T., W. J. O’Brien, and J. O. Choi. 2014. “Critical success factors and enablers for optimum and maximum industrial modularization.” J. Constr. Eng. Manage. 140 (6): 04014012. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000842.
O’Connor, J. T., W. J. O’Brien, and J. O. Choi. 2015. “Standardization strategy for modular industrial plants.” J. Constr. Eng. Manage. 141 (9): 04015026. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001001.
Otte, E., and R. Rousseau. 2002. “Social network analysis: A powerful strategy, also for the information sciences.” J. Inf. Sci. 28 (6): 441–453. https://doi.org/10.1177/016555150202800601.
Pan, W., A. R. Dainty, and A. G. Gibb. 2012. “Establishing and weighting decision criteria for building system selection in housing construction.” J. Constr. Eng. Manage. 138 (11): 1239–1250. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000543.
Park, H., S. H. Han, E. M. Rojas, J. Sons, and W. Jung. 2011. “Social network analysis of collaborative ventures for overseas construction projects.” J. Constr. Eng. Manage. 137 (5): 344–355. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000301.
Pena, B. D., L. Blakely, and M. J. Reno. 2021. “Parameter tuning analysis for phase identification algorithms in distribution system model calibration.” In Proc., 2021 IEEE Kansas Power and Energy Conf. (KPEC), 1–6. New York: IEEE.
Pioneer Homestead Apts. 2018. v. Sargent Eng’rs, 421 P.3d 1074, 2018 W.Y. 80 (Wyo. 2018). Cheyenne, WY: Supreme Court of Wyoming.
Rahman, M. M. 2014. “Barriers of implementing modern methods of construction.” J. Manage. Eng. 30 (1): 69–77. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000173.
Rahman, M. M., C. F. Ahmed, and C. K. S. Leung. 2019. “Mining weighted frequent sequences in uncertain databases.” Inf. Sci. 479 (1): 76–100. https://doi.org/10.1016/j.ins.2018.11.026.
Rai Industrial Fabricators. 2017. LLC v. Federal Insurance Company, No. 5: 16-cv-03674-EJD (N.D. Cal. Aug. 25, 2017). San Jose, CA: US District Court, Northern District of California.
Real Bldrs. Inc. 2020. v. Full Stack Modular LLC. N.Y. Slip Op 32157 (Sup. Ct. 2020). San Jose, CA: US District Court, Northern District of California.
Rubin, R. A., and B. V. Quintas. 2003. “Alternative dispute resolution in US public works: Proposed model.” J. Civ. Eng. Educ. 129 (2): 80–83. https://doi.org/10.1061/(ASCE)1052-3928(2003)129:2(80).
Rubulotta, E., M. Ignaccolo, G. Inturri, and Y. Rofè. 2013. “Accessibility and centrality for sustainable mobility: Regional planning case study.” J. Urban Plann. Dev. 139 (2): 115–132. https://doi.org/10.1061/(ASCE)UP.1943-5444.0000140.
Sahin, O., D. Miller, and S. Mohamed. 2018. “Value-based modelling: An Australian case of off-site manufactured buildings.” Int. J. Constr. Manage. 18 (1): 34–52. https://doi.org/10.1080/15623599.2016.1247774.
Said, H. 2015. “Prefabrication best practices and improvement opportunities for electrical construction.” J. Constr. Eng. Manage. 141 (12): 04015045. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001018.
Sand, and Castle Development. 2017. LLC v. Avalaon Development Group, LLC, No. A-3325-16T1 (N.J. Super. Ct. App. Div. Oct. 26, 2017). Appellate, NJ: Superior Court of New Jersey.
Semple, C., F. T. Hartman, and G. Jergeas. 1994. “Construction claims and disputes: Causes and cost/time overruns.” J. Constr. Eng. Manage. 120 (4): 785–795. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:4(785).
Sexton, D., I. H. El-adaway, M. Abdul Nabi, and A. H. El Hakea. 2020. “Using the simplified acquisition of base engineer requirements in construction projects: Contract administration guidelines.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (3): 04520018. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000394.
Shi, Y., B. Wu, N. Chen, A. Chen, J. Li, and H. Li. 2019. “Determination of effective management strategies for scenic area emergencies using association rule mining.” Int. J. Disaster Risk Reduct. 39 (Oct): 101208. https://doi.org/10.1016/j.ijdrr.2019.101208.
Shinnou, H., and M. Sasaki. 2008. “Spectral clustering for a large data set by reducing the similarity matrix size.” In LREC. Paris: European Language Resources Association.
Sica Industries, Inc. 2019. v. Macedo, No. A-3802-18T3 (N.J. Super. Ct. App. Div. Dec. 31, 2019). Appellate, NJ: Superior Court of New Jersey.
Skanska USA Building Inc. 2016. v. Atlantic Yards B2 Owner, LLC, 146 A.D.3d 1, 40 N.Y.S.3d 46 (App. Div. 2016). Appellate, NJ: Supreme Court of New York of Appellate Division.
Skanska USA Building Inc. 2018. v. Atlantic Yards B2 Owner, LLC, 31 N.Y.3d 1002, 98 N.E.3d 720, 74 N.Y.S.3d 805 (2018). New York: Court of Appeals of New York.
Skanska USA Building Inc. 2020. v. Atlantic Yards B2 Owner LLC, 2020 N.Y. Slip Op 30930 (Sup. Ct. 2020). New York: Supreme Court of New York County.
Solfisburg v. Glenco, Inc. 2019. Civil Action No. 18-cv-10266-IT (D. Mass. Sept. 30, 2019). Boston: US District Court of District Massachusetts.
Stoller v. CMH Manufacturing West, Inc. 2020. No. 18 C 0047 (N.D. Ill. Feb. 10, 2020). Rockford, IL: US District Court for the Northern District of Illinois.
Sundukovskiy, S. 2018. “Using technology to deal with the construction labor shortage.” Accessed April 02, 2021. https://consupt.com/2018/03/using-technology-to-deal-with-construction-labor-shortage/.
Suzumegano, Y. 2014. Critical factors and challenges in the designing and construction of nuclear power plants—The Westinghouse experience. Cranberry Township, PA: Westing House Electric Company.
Tanrıverdi, C. 2019. “A causal mapping approach for the analysis of construction disputes.” Master’s thesis, Dept. of Civil Engineering, Middle East Technical Univ.
Treacy, T. 1995. “Use of alternative dispute resolution in the construction industry.” J. Manage. Eng. 11 (1): 58–63.
Triton Structural Concrete, Inc. 2018. v. City of New York, 2018 N.Y. Slip Op 32968 (Sup. Ct. 2018). New York: Supreme Court of New York County.
United Partition Systems, Inc. 2009. v. US, No. 03-1242C (Fed. Cl. Nov. 19, 2009). Washington, DC: US Court of Federal Claims.
US Bureau of Economic Analysis. 2021. “GDP by industry.” Accessed April 2, 2021. https://apps.bea.gov/iTable/iTable.cfm?reqid=150&step=2&isuri=1&categories=gdpxind.
US, Sustainable Modular Management, Inc. 2017. v. Custom Mechanical Systems, Corp., No. 1: 16-cv-02915-JMS-MJD (S.D. Ind. May 5, 2017). Indianapolis: US District Court for the Southern District of Indiana.
Vegas v. CMH Homes, Inc. 2019. Civil No. 1: 18cv260-HSO-JCG (S.D. Miss. Jan. 15, 2019). Indianapolis: US District Court for the Southern District of Indiana.
Velamati, S. 2012. “Feasibility, benefits and challenges of modular construction in high rise development in the United States: A developer’s perspective.” Ph.D. dissertation, Center for Real Estate Program in Real Estate Development, Massachusetts Institute of Technology.
Verma, A., S. D. Khan, J. Maiti, and O. B. Krishna. 2014. “Identifying patterns of safety related incidents in a steel plant using association rule mining of incident investigation reports.” Saf. Sci. 70 (Jun): 89–98. https://doi.org/10.1016/j.ssci.2014.05.007.
Von Luxburg, U. 2007. “A tutorial on spectral clustering.” Stat. Comput. 17 (4): 395–416. https://doi.org/10.1007/s11222-007-9033-z.
Wambeke, B., M. Liu, and S. Hsiang. 2012. “Using Pajek and centrality analysis to identify a social network of construction trades.” J. Constr. Eng. Manage. 140 (7): 1192–1201. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000524.
Watts, V. M., and J. C. Scrivener. 1993. “Review of Australian building disputes settled by litigation: Fifty-nine different categories of dispute recognized within a total of 117 sources of dispute from building dispute judgments in supreme courts of New South Wales and Victoria from 1989–1990.” Build. Res. Inf. 21 (1): 59–63. https://doi.org/10.1080/09613219308727257.
Winforge, Inc. 2012. v. Coachmen Industries, Inc., 691 F.3d 856 (7th Cir. 2012). Chicago: US Court of Appeals for the Seventh Circuit.
Wong, P. S., and D. Maric. 2016. “Causes of disputes in construction planning permit applications.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 8 (4): 04516006. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000197.
Wong, P. S., C. Zwar, and E. Gharaie. 2017. “Examining the drivers and states of organizational change for greater use of prefabrication in construction projects.” J. Constr. Eng. Manage. 143 (7): 04017020. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001309.
Woodley, C. 2019. “Will digitalisation end construction disputes?” Constr. Res. Innov. 10 (1): 15–17. https://doi.org/10.1080/20450249.2019.1589140.
Xu, C., J. Bao, C. Wang, and P. Liu. 2018. “Association rule analysis of factors contributing to extraordinarily severe traffic crashes in China.” J. Saf. Res. 67 (1): 65–75.
Xue, Y., Y. Zhao, L. Cheng, J. An, L. Xue, and Z. Sang. 2019. “Traffic characteristics analyses of intersections based on the road detector data.” In Proc., CICTP 2019, 4710–4480. Reston, VA: ASCE.
Yao, L., Z. Xu, X. Zhou, and B. Lev. 2019. “Synergies between association rules and collaborative filtering in recommender system: An application to auto industry.” In Data science and digital business, 65–80. Cham, Switzerland: Springer.
Zhai, X., R. Reed, and A. Mills. 2014. “Factors impeding the offsite production of housing construction in China: An investigation of current practice.” Construct. Manage. Econ. 32 (1–2): 40–52. https://doi.org/10.1080/01446193.2013.787491.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 148Issue 1January 2022

History

Received: Apr 5, 2021
Accepted: Sep 10, 2021
Published online: Nov 2, 2021
Published in print: Jan 1, 2022
Discussion open until: Apr 2, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Mohamad Abdul Nabi, S.M.ASCE [email protected]
Ph.D. Candidate, Dept. of Civil, Architectural, and Environmental Engineering, Missouri Univ. of Science and Technology, Rolla, MO 65409. Email: [email protected]
Hurst-McCarthy Professor of Construction Engineering and Management, Professor of Civil Engineering, and Founding Director of the Missouri Consortium of Construction Innovation, Dept. of Civil, Architectural, and Environmental Engineering and Dept. of Engineering Management and Systems Engineering, Missouri Univ. of Science and Technology, Rolla, MO 65409 (corresponding author). ORCID: https://orcid.org/0000-0002-7306-6380. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Investigating Causes of Disputes Resulting in Litigation in Airport Development Projects in the United States Using Graph-Based Techniques, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5903, 40, 3, (2024).
  • A Holistic Approach to Exploring the Root Factors of Work Zone Accidents, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5729, 40, 1, (2024).
  • Competence as a Key Factor in Causal Mechanisms of Construction Disputes, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10.1061/JLADAH.LADR-1191, 16, 4, (2024).
  • Distributed Solar Generation: Current Knowledge and Future Trends, Journal of Infrastructure Systems, 10.1061/JITSE4.ISENG-2399, 30, 1, (2024).
  • Modeling and Understanding Dispute Causation in the US Public–Private Partnership Projects, Journal of Infrastructure Systems, 10.1061/JITSE4.ISENG-2328, 30, 1, (2024).
  • Understanding Collaboration Requirements for Modular Construction and Their Cascading Failure Impact on Project Performance, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5440, 39, 6, (2023).
  • Data-Driven Analysis of Construction Bidding Stage–Related Causes of Disputes, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5426, 39, 5, (2023).
  • Functionality as a Key Concept for Integrated Project Planning and Scheduling Methods, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-13427, 149, 7, (2023).
  • Identifying Design-Build Decision-Making Factors and Providing Future Research Guidelines: Social Network and Association Rule Analysis, Journal of Construction Engineering and Management, 10.1061/(ASCE)CO.1943-7862.0002431, 149, 1, (2023).
  • Construction Dispute Potentials: Mechanism versus Empiricism in Artificial Neural Networks, Sustainability, 10.3390/su142215239, 14, 22, (15239), (2022).
  • See more

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share