NC-UHPC Composite Structure for Long-Term Creep-Induced Deflection Control in Continuous Box-Girder Bridges
Publication: Journal of Bridge Engineering
Volume 23, Issue 6
Abstract
An innovative normal concrete (NC) with partial use of ultrahigh-performance concrete (UHPC) composite structure is proposed in this paper to reduce the long-term creep-induced deflection in continuous box-girder bridges. The creep properties of NC-UHPC composite columns were experimentally investigated, and test results showed that the creep coefficients in NC-UHPC composite columns decreased considerably compared with NC columns. A creep computational model of the NC-UHPC composite was further developed to describe long-term creep behaviors of the composite columns in good agreement with the test results. Based on the proposed creep model, the long-term behaviors of a long-span box-girder bridge, made of the NC-UHPC composite, were evaluated by finite-element analysis (FEA), and the influences of the UHPC area fraction and the length of embedded precast UHPC columns were also discussed. Compared with the traditional prestressed concrete (PC) box girder, the long-term creep-induced deflection at the midspan of the NC-UHPC composite bridge reduced by 54.5%. The NC-UHPC composite is, therefore, conceived to be one of effective solutions for long-term creep-induced deflection control of long-span continuous PC box-girder bridges.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
This project is supported by the National Natural Science Foundation of China (Grant 51578226 and 51778221), the Major Program of Science and Technology of Hunan Province (Grant 2017SK1010), the China Postdoctoral Science Foundation (Grant 2016M602411), and the Hunan Provincial Natural Science Foundation of China (Grant 2014JJ2046, 2015JJ2034).
References
ACI (American Concrete Institute). (1992). “Prediction of creep, shrinkage and temperature effect in concrete structures.” ACI 209R-92, Detroit.
Bažant, Z. P. (1972). “Prediction of concrete creep effects using age-adjusted effective modulus method.” ACI J., 69(4), 212–219.
Bažant, Z. P., Huber, M. H., and Yu, Q. (2011). “Perverseness of excessive segmental bridge deflections: Wake-up call for creep.” ACI Struct. J., 108(6), 766–774.
Bažant, Z. P., Yu, Q., and Li, G. H. (2012). “Excessive long-time deflections of prestressed box girders. I: Record-span bridge in Palau and other paradigms.” J Struct. Eng., 676–696.
Burkart, I., and Müller, H. S. (2008). “Creep and shrinkage characteristics of ultra high strength concrete (UHPC).” Proc., Second International Symp. on Ultra High Performance Concrete, Kassel University Press, Kassel, Germany, 469–476.
Cao, S. S. (2008). “Study on the simulation analysis and control of long-span concrete-filled steel tubular arch bridge.” Master’s thesis, Changan Univ., Shanxi, China (in Chinese).
CEB-FIP (Comité Euro-International du Béton-Fédération International de la Précontrainte). (1990). CEB-FIP model code for concrete structures, Lausanne, Switzerland.
Chai, Y. H. (2016). “Service performance of long-span lightweight aggregate concrete box-girder bridges.” J. Perform. Constr. Facil., 04014196.
Chen, Y. F., Xu, J. L., and Yu, W. J. (2007). “Causes and precautionary measures to long-term deflection of long span pre-stressed concrete box girder of continuous rigid frame bridge.” J. Chong-Qing Jiaotong Univ., 26(4), 6–8.
Chiu, H. S., Chern, J. C., and Chang, K. C. (1996). “Long-term deflection control in cantilever prestressed concrete bridge. I: Control method.” J. Eng. Mech., 122(6), 489–494.
Garas, V. Y., Kurtis, K. E., and Kahn, L. F. (2012). “Creep of UHPC in tension and compression: Effect of thermal treatment.” Cem. Concr. Compos., 34(4), 493–502.
Gardner, N. J., and Lockman, M. (2001). “Design provisions for drying shrinkage and creep of normal-strength concrete.” ACI Mater. J., 98(2), 159–167.
Ge, J. Y. (2013). Guidelines of civil MIDAS engineering software for bridge, China Communications Press, Beijing (in Chinese).
Graybeal, B. A. (2006). Material property characterization of ultra-high performance concrete, U. S. Dept. Transportation Federal Highway Administration, McLean, VA.
Hewson, N. (2012). Prestressed concrete bridges: Design and construction, 2nd Ed., Thomas Telford, London.
Ingebrigtsen, T. (1999). “Stolma Bridge, Norway.” Struct. Eng. Int., 9(2), 100–102.
Jin, C. D. (1981). “Analysis of deformation and stress redistribution of continuous structure due to creep of concrete.” China Civ. Eng. J., 14(8), 19–32.
Lu, Z. T., and Pan, Z. F. (2010). “Issues in design of long-span prestressed concrete box girder bridges.” China Civ. Eng. J., 43(1), 70–76 (in Chinese).
Manzanarez, R., and Olmer, M. (1994). Parrott’s ferry bridge retrofit, T.Y. Lin International, San Francisco.
Midas Civil 2015 [Computer software]. MIDAS Engineering Software, Seongnam, South Korea.
Ministry of Transport of the People’s Republic of China. (2004). “Code for design of highway reinforced concrete and prestressed concrete bridges and culverts.” JTGD62-2004, Beijing (in Chinese).
Pan, Z., Fu, C., and Jiang, Y. (2011). “Uncertainty analysis of creep and shrinkage effects in long-span continuous rigid frame of Sutong Bridge.” J. Bridge Eng., 248–258.
Pan, Z., and You, F. (2015). “Quantitative design of backup prestressing tendons for long-span prestressed concrete box girder bridges.” J. Bridge Eng., 04014066.
Richard, P., and Cheyrezy, M. (1995). “Composition of reactive powder concretes.” Cem. Concr. Res., 25(7), 1501–1511.
SETRA-AFGC (Service d’étude des transports, des routes et de leurs aménagement-Association Française de Génie Civil). (2013). Ultra high performance fibre-reinforced concretes: Interim recommendations, Paris.
Shao, X., Pan, R., Zhao, H., and Shao, Z. (2014). “Prestress loss of a new vertical prestressing anchorage system on concrete box-girder webs.” J. Bridge Eng., 210–219.
Shi, X. F., Yang, Q., and Ruan, X. (2010). “The measure of decreasing long-span PC girder bridge deflection and cracks.” China Communication Press, Beijing (in Chinese).
SIA (Swiss Standard). (2016). “Ultra-high performance fibre reinforced cement-based composites (UHPFRC): Materials design, and application.” SIA 2052, EPFL-Swiss Federal Institute of Technology, Lausanne, Switzerland.
Tang, M. C., and Dai, T. (2007). “Overall design of double-line bridge of Shibanpo Changjiang river bridge in Chongqing.” Bridge Constr., 2007(6), 28–32 (in Chinese).
Vitek, J. L. (1997). “Long-term deflections of large prestressed concrete bridges.” Bull. No. 235, Serviceability Models, Progress Rep., Comité Euro-International du Béton, Lausanne, Switzerland.
Xie, J., Wang, G. L., and Zhang, X. H. (2007). “Review of study of long-term deflection for long span prestressed concrete box-girder bridge.” J. Highway Trans. Res. Dev., 47–51.
Zhang, N. (2012). “The research of measure to prevent long-span PC girder bridge from crack and defection.” Master’s thesis, Hunan Univ., Changsha, China (in Chinese).
Zhang, Y., Zhang, N., and Yao, X. C. (2013). “Precautionary techniques for cracking and deflection of long-span PC continuous rigid frame bridges.” J. Shenyang Univ. Technol., 35(5), 594–600 (in Chinese).
Information & Authors
Information
Published In
Copyright
© 2018 American Society of Civil Engineers.
History
Received: Aug 23, 2017
Accepted: Dec 13, 2017
Published online: Apr 9, 2018
Published in print: Jun 1, 2018
Discussion open until: Sep 9, 2018
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.