Technical Papers
Mar 13, 2018

Primary Bond Mechanism Behavior of Posttensioned 7-Wire Strand during Load Exposition

Publication: Journal of Bridge Engineering
Volume 23, Issue 5

Abstract

The three primary bond mechanisms of a 7-wire strand are adhesion, friction, and mechanical interlocking between the concrete surface and the strands’ helical surfaces. Once adhesion fails as a result of micromovements of the strand, it is very difficult to predict the contribution of other two post-initial slip mechanisms to the total bond capacity of the 7-wire strand. The predictions become more difficult when the bond is influenced by the use of oil-based corrosion-protection (OCP) agents. This article discusses the influence of primary bond mechanisms during the loading stages of the posttensioned two-span concrete member and evaluates the contribution of bond mechanisms to the total member resistance and behavior. Elastomagnetic (EM) gauges, which can directly record the force inside the strands during prestressing and loading cycles, were used as one of the primary monitoring mechanisms. Based on these records, it is possible to evaluate force behavior in the strands during successive load stages up to the ultimate limit state (ULS) of the concrete members. The nonlinear bond behavior of the 7-wire strand is presented, including details of its elongation during testing.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The author gratefully acknowledges David Smith and Robert Petty (both of Atkins) for technical support and review. Special thanks is given to Associate Professor Andrej Jarosevic for the support and advice regarding EM gauge record evaluation. Sincere appreciation is also expressed to the Department of Concrete Structures at the Faculty of Civil Engineering at the Slovak University of Technology in Bratislava, Slovakia. The work was supported by the Slovak Research and Development Agency under Contract No. APVV-0442-12. The opinions, findings, and conclusions in this article are those of the author.

References

Borzovič, V., Laco, J., Pecník, M., and Pažma, P. (2016). “The crack development mechanism of prestressed girder influenced by different bond between prestressed tendons and concrete.” Key Eng. Mater., 691, 309–320.
BSI (British Standards Institution). (2000). “Concrete. Specification, performance, production and conformity.” BS EN 206-1:2000, London.
CEN (European Committee for Standardization). (2000). “Prestressing steels, part 3: Strand.” EN 10138-3, Brussels, Belgium.
CEN (European Committee for Standardization). (2004). “Design of concrete structures, part 1.1: General rules and rules for buildings.” Eurocode 2, EN 1992-1-1, Brussels, Belgium.
CEN (European Committee for Standardization). (2005). “Steel for the reinforcement of concrete. Weldable reinforcing steel: General.” EN 10080, Brussels, Belgium.
CEN (European Committee for Standardization). (2007). “Grout for prestressing tendons: Basic requirements.” EN 447, Brussels, Belgium.
Den Uijl, J. A. (1992). “Bond and splitting action of prestressing strand.” Proc., Bond in Concrete: From Research to Practice, Vol. 2, Comité Euro-international du Béton, Paris, 79–88.
EOTA (European Organization for Technical Assessment). (2002). “Post-tensioning kits for prestressing of structures.” ETAG 013, Brussels, Belgium.
FIB (Fédération Internationale du Béton). (2000). “Bond of reinforcement in concrete.” FIB Bulletin 10, Lausanne, Switzerland.
Halvonik, J., Dolnak, J., and Borzovič, V. (2013). “Long-term losses of prestress in precast members cast from HPC.” Procedia Eng., 65, 81–86.
Laco, J., and Borzovič, V. (2017). “Experimental investigation of prestressing strand bond on behavior of concrete members.” ACI Struct. J., 114(1), 15–24.
Laco, J., and Chrappa, M. (2016). “Corrosion protection material replacement in extradosed viaduct cables.” Proc., Performance-Based Approaches for Concrete Structures, FIB, Lausanne, Switzerland.
Laco, J., and Hendy, C. (2018). “Influence of oil-based corrosion protection on friction losses during strands installation and prestressing.” Proc., High Tech Concrete: Where Technology and Engineering Meet, FIB, Lausanne, Switzerland, 2299–2306.
Luthi, T., Diephuis, J., Icaza, J. J. Breen, J. E., and Kreger, M. E. (2005). “Factors affecting bond and friction losses in multi-strand post-tensioning tendons including the effect of emulsifiable oils.” CTR Research Report: 0-4562-1. Texas Dept. of Transportation, Austin, TX.
Martí-Vargas, J. R., Serna, P., and Hale, W. M. (2013). “Strand bond performance in prestressed concrete accounting for bond slip.” Eng. Struct., 51, 236–244.
Ryall, M. J., Parke, G. A. R., and Harding, J. E. (2000). The manual of bridge engineering, Thomas Telford, London.
Sumitro, S., Jarosevic, A., and Wang, M. L. (2002). “Elasto-magnetic sensor utilization on steel cable stress measurement.” Proc., 1st FIB Congress, FIB, Lausanne, Switzerland.

Information & Authors

Information

Published In

Go to Journal of Bridge Engineering
Journal of Bridge Engineering
Volume 23Issue 5May 2018

History

Received: Jun 9, 2017
Accepted: Nov 14, 2017
Published online: Mar 13, 2018
Published in print: May 1, 2018
Discussion open until: Aug 13, 2018

Permissions

Request permissions for this article.

Authors

Affiliations

Jan Laco, Ph.D. [email protected]
C.Eng
Bridge Engineer, Atkins, 2 Ashley Ave., Epsom KT18 5AL, U.K. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share