Free access
Research Article
Oct 26, 2022

Practical Experience From Risks of Decommissioning of Petrochemical Facilities

Publication: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering
Volume 8, Issue 4

Abstract

Decommissioning is expensive and can be a complex operation involving a series of distinct phases, including cessation of operation, site preparation, decontamination, dismantling (demolition) and disposal. Each decommissioning phase has associated risks, which need to be identified, controlled, and minimized as far as reasonably practicable. A risk-based approach has been recognized, both for ensuring safety and reducing the total decommissioning period with cost savings. A traditional hazard and operability (HAZOP) study can be conveniently extended to decommissioning HAZOP, which is a guideword-based collective multidisciplinary study identifying types of risks associated with decommissioning and allocates actions to the contractor and specialists departments for implementation. A decommissioning HAZOP enables to address the hazards and risks of decommissioning activities holistically, addresses all major contingencies, and results in safe decommissioning within budget. The presented decommissioning HAZOP study itself was completed ahead of time, without accidents. While there are other methods, decommissioning HAZOP and risk assessment was recognized as one of the effective methods for achieving the safety and project cost objectives. This article is available in the ASME Digital Collection at https://doi.org/10.1115/1.4055797.

Information & Authors

Information

Published In

Go to ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering
ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering
Volume 8Issue 4December 2022

History

Received: Dec 3, 2021
Revision received: Sep 11, 2022
Published online: Oct 26, 2022
Published in print: Dec 1, 2022

Authors

Affiliations

Arriscar Pty Ltd, New South Wales, 2000, Australia e-mail: [email protected]
Petrellus Engineering Ltd, Kent DA13 0TL, UK e-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share