Installing Pipeline within Power Right-of-Way: What Could Go Wrong?

ABSTRACT

The project consists of installing roughly 9-mi of 42-in. pipe. The pipeline alignment is along an existing transmission power corridor, within an easement at an abandoned landfill, and along a public right-of-way adjacent to an active landfill. In addition to the challenges arising from the project being located primarily within coastal wetlands of South Florida, the project had to overcome an aggressive schedule, with design, permitting, and installation needing to be completed within 2 years of notice to proceed. The challenges observed on this project included difficult site conditions, with the contractor having to battle a high groundwater table, unstable soils, and tidal influences, coordination with local and federal stakeholders, installation parallel to an existing 54″ PCCP force main, and high voltage transmission lines. This paper will focus on discussing the various challenges observed and the solutions and strategies implemented to overcome the setbacks.

Get full access to this chapter

View all available purchase options and get full access to this chapter.

Information & Authors

Information

Published In

Go to Pipelines 2024
Pipelines 2024
Pages: 162 - 167

History

Published online: Aug 30, 2024

Permissions

Request permissions for this article.

Authors

Affiliations

Olena Lytvyn, P.E. [email protected]
1Engineering Manager, Black & Veatch, Coral Gables, FL. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$152.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$152.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share