Abstract

Antero Dam is an earthen embankment about 45 feet high and about 4,200 feet long located on the South Platte River in Park County, Colorado, at an elevation of about 9,000 feet. The dam and reservoir are owned and operated by Denver Water. Embankment construction was completed between 1908 and 1909 with a hydraulic fill core in a wide, shallow valley with variable alluvial soils over highly variable sedimentary and volcanic geology. Concerns related to seepage stability began shortly after construction of the dam and prevented complete filling of the reservoir. Reservoir storage has been restricted to less than 1/4 of the total storage. The area downstream of the dam generally along the entire length of the toe has always been wet and marshy, with areas of standing water. No evidence of movement of fines at the current restricted storage level have been previously documented. Antero Dam has undergone a significant rehabilitation that occurred over several phases and construction seasons. Rehabilitation has included a downstream filter trench installed using the bio-polymer method, a toe and chimney drain, flattening the upstream and downstream slopes, additional upstream slope protection, installation of a soil-bentonite barrier wall through the center of the embankment, hardening of the spillway, and raising the outlet works tower. This paper will focus on the evaluation, design, and construction of the soil-bentonite barrier wall installed through the center of the dam. Extensive evaluations occurred during design to select the installation method and backfill material type appropriate for this 107-year-old embankment. Significant consideration was given to the risk for damage to the embankment during construction related to hydraulic fracturing or trench instability that could lead to additional dam safety concerns. Regular quality control and quality assurance testing occurred during construction to verify the slurry properties, backfill properties, trench stability, and that the total excavation depth met the requirements and intent of the design. Additionally, daily dam safety inspections occurred in the vicinity of the open trench to confirm dam safety incidents were not developing. Construction was successfully completed in fall 2015 without incident, under budget, and on schedule.

Get full access to this chapter

View all available purchase options and get full access to this chapter.

Information & Authors

Information

Published In

Go to Grouting 2017
Grouting 2017
Pages: 299 - 315

History

Published online: Jul 6, 2017

Permissions

Request permissions for this article.

Authors

Affiliations

Edwin R. Friend [email protected]
P.E., P.G.
RJH Consultants, 9800 Mt. Pyramid Court Suite 330, Englewood, CO 80112. E-mail: [email protected]
Darren Brinker [email protected]
P.E.
Denver Water, 1600 W. 12th Ave., Denver, CO 80204-3412. E-mail: [email protected]
Jeff Martin [email protected]
P.E.
Denver Water, 1600 W. 12th Ave., Denver, CO 80204-3412. E-mail: [email protected]
Douglas Raitt [email protected]
P.E.
Denver Water, 1600 W. 12th Ave., Denver, CO 80204-3412. E-mail: [email protected]
Robert Huzjak [email protected]
P.E.
RJH Consultants, 9800 Mt. Pyramid Court Suite 330, Englewood, CO 80112. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$108.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$108.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share