Curtain Wall Construction: Issues and Different Perspectives among Project Stakeholders

Publication: Journal of Management in Engineering
Volume 38, Issue 5

Abstract

Curtain wall construction has become increasingly popular. Activities on the critical path, engineered materials with long lead times, and involvement of various stakeholders such as architects, façade consultants, structural engineers, general contractors, and subcontractors are the key features of curtain wall construction. Therefore, to successfully construct a curtain wall, integrated coordination based on a common understanding among them is critical because misunderstandings and conflicts caused by differences in perception among different participants can hinder effective collaboration and communication. The purpose of this study is to identify the major problems in curtain wall construction and investigate whether there exist perception differences regarding the problems among the stakeholders executing the curtain wall construction. Based on a thorough literature review and content analysis with the qualitative data collected from interviews with industry experts, 40 problems related to curtain wall construction were identified. A total of 116 responses were collected from the survey developed to address these problems. Based on the results of a descriptive statistical analysis, it is observed that actual measurement after frame construction and quality and design changes caused by the lowest bid are the two major issues of curtain wall construction. In addition, for the 20 major problems identified from the descriptive statistical analysis, analysis of variance tests were conducted to determine whether there existed differences in the perception of each stakeholder on these issues. A total of 14 out of the 20 problems showed statistically significant perception differences regarding the problems of curtain wall construction. These perception differences were particularly noticeable for the subcontractor and architecture supervisor. Two main contributions of this study, identification of major problems in curtain wall construction and verification of the perception differences between stakeholders with respect to the problems, should help practitioners establish plans to improve the construction process and justify creating more efficient circumstances for curtain wall construction.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

Acknowledgments

This work was supported by a National Research Korea grant funded by the Korean government (Ministry of Education) (NRF-2021R1F1A1050519).

References

Abuya, I. O. 2016. “Project fraud: Conceptualization, determinants and schemes.” PM World J. 5 (6): 1–3.
Adriaanse, A., H. Voordijk, and G. Dewulf. 2010. “The use of interorganisational ICT in United States construction projects.” Autom. Constr. 19 (1): 73–83. https://doi.org/10.1016/j.autcon.2009.09.004.
Aksamija, A., and T. Peters. 2017. “Heat transfer in facade systems and energy use: Comparative study of different exterior wall types.” J. Archit. Eng. 23 (1): C5016002. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000224.
Allen, E., and J. Iano. 2019. Fundamentals of building construction: Materials and methods. Hoboken, NJ: Wiley.
Antillon, E. I., M. J. Garvin, K. R. Molenaar, and A. Javernick-Will. 2018. “Influence of interorganizational coordination on lifecycle design decision making: Comparative case study of public–private partnership highway projects.” J. Manage. Eng. 34 (5): 05018007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000623.
Assaf, S. A., M. Al-Khalil, and M. Al-Hazmi. 1995. “Causes of delay in large building construction projects.” J. Manage. Eng. 11 (2): 45–50. https://doi.org/10.1061/(ASCE)0742-597X(1995)11:2(45).
Cai, S., Z. Ma, M. J. Skibniewski, S. Bao, and H. Wang. 2020. “Construction automation and robotics for high-rise buildings: Development priorities and key challenges.” J. Constr. Eng. Manage. 146 (8): 04020096. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001891.
Carretero-Ayuso, M. J., M. T. Pinheiro-Alves, and D. Marín-García. 2021. “Comparative exam of deterioration in cladded facades with cement mortar.” J. Perform. Constr. Facil. 35 (5): 04021044. https://doi.org/10.1061/(ASCE)CF.1943-5509.0001617.
Chae, J., S. Hwang, W. Seo, and Y. Kang. 2021. “Relationship between rework of engineering drawing tasks and stress level measured from physiological signals.” Autom. Constr. 124 (Apr): 103560. https://doi.org/10.1016/j.autcon.2021.103560.
Choi, J. O., X. B. Chen, and T. W. Kim. 2019. “Opportunities and challenges of modular methods in dense urban environment.” Int. J. Constr. Manage. 19 (2): 93–105. https://doi.org/10.1080/15623599.2017.1382093.
Cohen, J. M. 1991. “Cladding design: Whose responsibility?” J. Perform. Constr. Facil. 5 (3): 208–218. https://doi.org/10.1061/(ASCE)0887-3828(1991)5:3(208).
Costantino, N., and R. Pietroforte. 2006. “The adoption rate of e-commerce in the U.S. and Italian construction markets: Some reasons for its variability.” J. Inf. Technol. Constr. 11 (8): 103–111.
Cui, C., Y. Liu, A. Hope, and J. Wang. 2018. “Review of studies on the public–private partnerships (PPP) for infrastructure projects.” Int. J. Project Manage. 36 (5): 773–794. https://doi.org/10.1016/j.ijproman.2018.03.004.
Dal Borgo, E., and A. Meneghetti. 2019. “Production and shipment planning for project based enterprises: Exploiting learning-forgetting phenomena for sustainable assembly of curtain walls.” Comput. Ind. Eng. 131 (May): 488–501. https://doi.org/10.1016/j.cie.2019.01.058.
Dorée, A. G. 2004. “Collusion in the Dutch construction industry: An industrial organization perspective.” Build. Res. Inf. 32 (2): 146–156. https://doi.org/10.1080/0961321032000172382.
Du, Q., R. Yang, and S. Ledbetter. 2012. “The information sources in building cladding supply chain.” Res. J. Appl. Sci. Eng. Technol. 4 (21): 4449–4452.
Forsman, S., N. Björngrim, A. Bystedt, L. Laitila, P. Bomark, and M. Öhman. 2012. “Need for innovation in supplying engineer-to-order joinery products to construction: A case study in Sweden.” Constr. Innovation 12 (4): 464–491. https://doi.org/10.1108/14714171211272225.
Gilani, G., O. Pons, and A. de la Fuente. 2022. “Sustainability-oriented approach to assist decision makers in building facade management.” J. Constr. Eng. Manage. 148 (1): 04021182. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002194.
Gosling, J., D. R. Towill, M. M. Naim, and A. R. Dainty. 2015. “Principles for the design and operation of engineer-to-order supply chains in the construction sector.” Prod. Plann. Control 26 (3): 203–218. https://doi.org/10.1080/09537287.2014.880816.
Guo, J., and Q. Wang. 2022. “Human-related uncertainty analysis for automation-enabled façade visual inspection: A Delphi study.” J. Manage. Eng. 38 (2): 04021088. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001000.
Hajian, H., and G. Brandow. 2012. “As-built documentation of structural components for reinforced concrete construction quality control with 3D laser scanning.” In Proc., 2012 ASCE Int. Conf. on Computing in Civil Engineering, 253–260. Reston, VA: ASCE. https://doi.org/10.1061/9780784412343.0032.
Hwang, B.-G., X. Zhao, and T. H. Van Do. 2014. “Influence of trade-level coordination problems on project productivity.” Project Manage. J. 45 (5): 5–14. https://doi.org/10.1002/pmj.21445.
Jang, S., Y. Jeong, G. Lee, and Y. Kang. 2019. “Enhancing subcontractors’ participation in BIM-based design coordination under a DBB contract.” J. Manage. Eng. 35 (6): 04019022. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000714.
Kassem, M., N. Dawood, and D. Mitchell. 2012. “A decision support system for the selection of curtain wall systems at the design development stage.” Construct. Manage. Econ. 30 (12): 1039–1053. https://doi.org/10.1080/01446193.2012.725940.
Kim, T., Y.-W. Kim, and H. Cho. 2021. “A simulation-based dynamic scheduling model for curtain wall production considering construction planning reliability.” J. Cleaner Prod. 286 (Mar): 124922. https://doi.org/10.1016/j.jclepro.2020.124922.
Koc, K., and A. P. Gurgun. 2021. “Stakeholder-associated life cycle risks in construction supply chain.” J. Manage. Eng. 37 (1): 04020107. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000881.
Layzell, J., and S. Ledbetter. 1998. “FMEA applied to cladding systems—Reducing the risk of failure.” Build. Res. Inf. 26 (6): 351–357. https://doi.org/10.1080/096132198369689.
Lee, J.-S. 2021. “Life cycle costing for exterior materials on building façade.” J. Constr. Eng. Manage. 147 (7): 04021059. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002068.
Liang, Q., J. Fu, Z. Li, B. Yan, Z. Shu, and Y. He. 2020. “Bimodal distribution of wind pressure on windward facades of high-rise buildings induced by interference effects.” J. Wind Eng. Ind. Aerodyn. 200 (May): 104156. https://doi.org/10.1016/j.jweia.2020.104156.
Lim, J. S., and J. H. Ock. 2014. “Development of the preliminary cost estimate method for the free-form building façade trade in conjunction with the panel optimization algorithm process.” Korean J. Constr. Eng. Manage. 15 (4): 95–106. https://doi.org/10.6106/KJCEM.2014.15.4.095.
Liu, J., and M. Lu. 2018. “Constraint programming approach to optimizing project schedules under material logistics and crew availability constraints.” J. Constr. Eng. Manage. 144 (7): 04018049. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001507.
Long, N. D., S. Ogunlana, T. Quang, and K. C. Lam. 2004. “Large construction projects in developing countries: A case study from Vietnam.” Int. J. Project Manage. 22 (7): 553–561. https://doi.org/10.1016/j.ijproman.2004.03.004.
Luo, L., X. Jin, G. Q. Shen, Y. Wang, X. Liang, X. Li, and C. Z. Li. 2020. “Supply chain management for prefabricated building projects in Hong Kong.” J. Manage. Eng. 36 (2): 05020001. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000739.
Memari, A. M., N. Simmons, and R. L. Solnosky. 2021. “Unitized curtain wall systems joint performance with re-entrant corners under seismic racking testing.” J. Build. Eng. 40 (Aug): 102715. https://doi.org/10.1016/j.jobe.2021.102715.
Moghtadernejad, S., M. S. Mirza, and L. E. Chouinard. 2019. “Façade design stages: Issues and considerations.” J. Archit. Eng. 25 (1): 04018033. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000335.
Montali, J., M. Overend, P. M. Pelken, and M. Sauchelli. 2018. “Knowledge-based engineering in the design for manufacture of prefabricated façades: Current gaps and future trends.” Archit. Eng. Des. Manage. 14 (1–2): 78–94. https://doi.org/10.1080/17452007.2017.1364216.
Owolabi, H. A., L. O. Oyedele, H. A. Alaka, S. O. Ajayi, O. O. Akinade, and M. Bilal. 2020. “Critical success factors for ensuring bankable completion risk in PFI/PPP megaprojects.” J. Manage. Eng. 36 (1): 04019032. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000717.
Pan, M., and W. Pan. 2020. “Stakeholder perceptions of the future application of construction robots for buildings in a dialectical system framework.” J. Manage. Eng. 36 (6): 04020080. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000846.
Pavitt, T., and A. Gibb. 2003. “Interface management within construction: In particular, building façade.” J. Constr. Eng. Manage. 129 (1): 8–15. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:1(8).
Pavitt, T. C., and A. G. F. Gibb. 1999. “Managing organizational interfaces in the cladding supply chain: Initial results from expert interviews.” In Vol. 2 of Proc., 15th Annual ARCOM Conf., edited by W. Hughes, 519–528. Liverpool, England: Liverpool John Moores Univ.
Pietroforte, R. 1995. “Cladding systems: Technological change and design arrangements.” J. Archit. Eng. 1 (3): 100–107. https://doi.org/10.1061/(ASCE)1076-0431(1995)1:3(100).
Pulidindi, K., and H. Pandey. 2020. “Aluminum curtain wall market size, 2020-2026.” Accessed July 23, 2021. https://www.gminsights.com/industry-analysis/aluminum-curtain-wall-market.
Rapone, G., and O. Saro. 2012. “Optimisation of curtain wall façades for office buildings by means of PSO algorithm.” Energy Build. 45 (Feb): 189–196. https://doi.org/10.1016/j.enbuild.2011.11.003.
Sardroud, J. M. 2012. “Influence of RFID technology on automated management of construction materials and components.” Sci. Iran. 19 (3): 381–392. https://doi.org/10.1016/j.scient.2012.02.023.
Scolobig, A., and J. Lilliestam. 2016. “Comparing approaches for the integration of stakeholder perspectives in environmental decision making.” Resources 5 (4): 37. https://doi.org/10.3390/resources5040037.
Seo, W., and Y. Kang. 2020. “Performance indicators for the claim management of general contractors.” J. Manage. Eng. 36 (6): 04020070. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000835.
Silverstone, H., M. Sheetz, S. Pedneault, and F. Rudewicz. 2004. Forensic accounting and fraud investigation for non-experts. Hoboken, NJ: Wiley Online Library.
Singleton, T. W. 2010. Fraud auditing and forensic accounting. Hoboken, NJ: Wiley.
Tam, V. W., L. Shen, and J. S. Kong. 2011. “Impacts of multi-layer chain subcontracting on project management performance.” Int. J. Project Manage. 29 (1): 108–116. https://doi.org/10.1016/j.ijproman.2010.01.005.
Wang, G., H. Lu, W. Hu, X. Gao, and P. Pishdad-Bozorgi. 2020. “Understanding behavioral logic of information and communication technology adoption in small- and medium-sized construction enterprises: Empirical study from China.” J. Manage. Eng. 36 (6): 05020013. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000843.
Zahiri, Z., D. F. Laefer, and A. Gowen. 2021. “Characterizing building materials using multispectral imagery and LiDAR intensity data.” J. Build. Eng. 44 (Dec): 102603. https://doi.org/10.1016/j.jobe.2021.102603.
Zhang, P., H. Lingard, N. Blismas, R. Wakefield, and B. Kleiner. 2015. “Work-health and safety-risk perceptions of construction-industry stakeholders using photograph-based Q methodology.” J. Constr. Eng. Manage. 141 (5): 04014093. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000954.
Zhou, Z., J. Irizarry, and Y. Lu. 2018. “A multidimensional framework for unmanned aerial system applications in construction project management.” J. Manage. Eng. 34 (3): 04018004. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000597.

Information & Authors

Information

Published In

Go to Journal of Management in Engineering
Journal of Management in Engineering
Volume 38Issue 5September 2022

History

Received: Feb 17, 2022
Accepted: May 13, 2022
Published online: Jul 13, 2022
Published in print: Sep 1, 2022
Discussion open until: Dec 13, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Formerly, Graduate Research Assistant, Dept. of Architecture and Architectural Engineering, Yonsei Univ., Seoul 03722, South Korea. Email: [email protected]
Associate Professor, Dept. of Architecture and Architectural Engineering, Yonsei Univ., Seoul 03722, South Korea (corresponding author). ORCID: https://orcid.org/0000-0002-2534-2264. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share