Erratum for “Heuristic Methods for Finance-Based and Resource-Constrained Project Scheduling Problem” by Wanlin Liu, Jingwen Zhang, and Wanjun Liu
You are viewing the correction.
VIEW THE CORRECTED ARTICLEPublication: Journal of Construction Engineering and Management
Volume 147, Issue 12
Eq. (18) in the original paper included a typographical error resulting in the incorrect notation for profit. The correct notation is . The corrected equation is included herein:
(18)
To preserve the published version of record, these details have been corrected only in this erratum.
Information & Authors
Information
Published In
Copyright
© 2021 American Society of Civil Engineers.
History
Received: Aug 25, 2021
Accepted: Aug 26, 2021
Published online: Sep 25, 2021
Published in print: Dec 1, 2021
Discussion open until: Feb 25, 2022
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.