Abstract

Construction and demolition (C&D) waste generated from construction projects impacts the environment if not managed properly; appropriate C&D waste management is therefore necessary. The first step in this practice is the estimation of the quantity of C&D waste generated. The literature recommends numerous approaches for the quantification of C&D waste in a region based on the availability of data pertaining to construction and demolition activity and the accuracy of the estimate required. The major obstacle in this process is the nonavailability of data in developing countries such as India. A novel approach for gathering such information and processing it further to quantify and manage C&D waste is presented in this study. The study was conducted in the Indian city of Hyderabad during the January 2017 to December 2020 period. The C&D waste data were ascertained based on the building permits issued during this period. Quantitative analysis was conducted to identify the proportion of different types of buildings for which permits were issued, number of buildings demolished before the construction of new buildings, types of buildings demolished, and C&D waste generated using a random sampling technique. Furthermore, regression analysis was performed to determine the relationship between the built-up area and the building permit fee collected by the town planning department. The results of this analysis allowed for the calculation of the total construction area of buildings based on the fee collected for issuing the permit. The suggested approach is beneficial, especially in developing countries where data pertaining to construction activity in a region are scarcely available. The findings of this study will help waste governors and policy makers formulate policies for effectively and efficiently managing C&D waste.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data that support the findings of this study are available from the corresponding author upon reasonable request.

References

Bergsdal, H., R. A. Bohne, and H. Bratteb. 2007. “Projection of construction and demolition waste in Norway.” J. Ind. Ecol. 11 (3): 27–39. https://doi.org/10.1162/jiec.2007.1149.
BMTPC (Building Materials and Technology Promotion Council). 2018. “Utilization of recycled produce of construction and demolition waste a ready reckoner.” Accessed July 25, 2021. https://www.bmtpc.org/DataFiles/CMS/file/PDF_Files/C&D_Ready_Reckoner_BMTPC_web.pdf.
Byrne, B. M. 2010. Structural equation modeling with AMOS: Basic concepts, applications, and programming. New York: Routledge.
Census of India. 2011. “Provisional population totals, Census of India 2011: Urban agglomerations and cities.” Accessed July 25, 2021. http://www.censusindia.gov.in/.
CMIE (Centre for Monitoring Indian Economy). 2021. “Economic outlook.” Accessed July 25, 2021. https://economicoutlook.cmie.com/.
Cochran, K., T. Townsend, D. Reinhart, and H. Heck. 2007. “Estimation of regional building-related C&D debris generation and composition: Case study for Florida, US.” Waste Manage. 27 (7): 921–931. https://doi.org/10.1016/j.wasman.2006.03.023.
Cochran, K. M., and T. G. Townsend. 2010. “Estimating construction and demolition debris generation using a materials flow analysis approach.” Waste Manage. 30 (11): 2247–2254. https://doi.org/10.1016/j.wasman.2010.04.008.
Coelho, A., and J. de Brito. 2011. “Generation of construction and demolition waste in Portugal.” Waste Manage. Res. 29 (7): 739–750. https://doi.org/10.1177/0734242X11402253.
Coronado, E., E. Dosla, J. R. Viguri, and A. Andres. 2011. “Estimation of construction and demolition waste (C&DW) generation and multicriteria analysis of C&DW management alternatives: A case study in Spain.” Waste Biomass Valorization 2 (2): 209–225. https://doi.org/10.1007/s12649-011-9064-8.
Ding, T., and J. Xiao. 2014. “Estimation of building-related construction and demolition waste in Shanghai.” Waste Manage. 34 (11): 2327–2334. https://doi.org/10.1016/j.wasman.2014.07.029.
Fatta, D., A. Papadopoulos, E. Avramikos, E. Sgourou, K. Moustakas, F. Kourmoussis, A. Mentzis, and M. Loizidou. 2003. “Generation and management of construction and demolition waste in Greece—An existing challenge.” Resour. Conserv. Recycl. 40 (1): 81–91. https://doi.org/10.1016/S0921-3449(03)00035-1.
Formoso, C. T., L. Soibelman, C. De Cesare, and E. L. Isatto. 2002. “Material waste in building industry: Main causes and prevention.” J. Constr. Eng. Manage. 128 (4): 316–325. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:4(316).
Hair, J., W. C. Black, B. J. Babin, and R. E. Anderson. 2010. Multivariate data analysis. 7th ed. Upper Saddle River, NJ: Pearson.
Hsiao, T. Y., Y. T. Huang, Y. H. Yu, and I. K. Wernick. 2002. “Modeling materials flow of waste concrete from construction and demolition wastes in Taiwan.” Resour. Policy 28 (1–2): 39–47. https://doi.org/10.1016/S0301-4207(03)00004-7.
Jain, S., S. Singhal, and N. K. Jain. 2019. “Construction and demolition waste generation in cities in India: An integrated approach.” Int. J. Sustainable Eng. 12 (5): 333–340. https://doi.org/10.1080/19397038.2019.1612967.
Kar, S., and K. N. Jha. 2021. “Investigation into lead time of construction materials and influencing factors.” J. Constr. Eng. Manage. 147 (3): 04020177. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001998.
Kartam, N., N. Al-Mutairi, I. Al-Ghusain, and J. Al-Humoud. 2004. “Environmental management of construction and demolition waste in Kuwait.” Waste Manage. 24 (10): 1049–1059. https://doi.org/10.1016/j.wasman.2004.06.003.
Katz, A., and H. Baum. 2011. “A novel methodology to estimate the evolution of construction waste in construction sites.” Waste Manage. 31 (2): 353–358. https://doi.org/10.1016/j.wasman.2010.01.008.
Kern, A. P., F. M. Dias, and P. M. Kulakowski. 2015. “Waste generated in highrise buildings construction: A quantification model based on statistical multiple regression.” Waste Manage. 39 (Jan): 35–44. https://doi.org/10.1016/j.wasman.2015.01.043.
Kofoworola, O. F., and S. H. Gheewala. 2009. “Estimation of construction waste generation and management in Thailand.” Waste Manage. 29 (2): 731–738. https://doi.org/10.1016/j.wasman.2008.07.004.
Kutner, M. H., C. J. Nachtsheim, J. Neter, and W. Li. 2005. Applied linear statistical models. New York: McGraw-Hill.
Lau, H. H., A. Whyte, and P. L. Law. 2008. “Composition and characteristics of construction waste generated by residential housing project.” Int. J. Environ. Res. 2 (3): 261–268.
Li, J., Z. Ding, X. Mi, and J. Wang. 2013. “A model for estimating construction waste generation index for building project in China.” Resour. Conserv. Recycl. 74 (May): 20–26. https://doi.org/10.1016/j.resconrec.2013.02.015.
Llatas, C. 2011. “A model for quantifying construction waste in projects according to the European waste list.” Waste Manage. 31 (6): 1261–1276. https://doi.org/10.1016/j.wasman.2011.01.023.
Lu, W., and V. W. Y. Tam. 2013. “Construction waste management policies and their effectiveness in Hong Kong: A longitudinal review.” Renewable Sustainable Energy Rev. 23 (Mar): 214–223. https://doi.org/10.1016/j.rser.2013.03.007.
Lu, W., C. Webster, Y. Peng, X. Chen, and X. Zhang. 2017. “Estimating and calibrating the amount of building-related construction and demolition waste in urban China.” Int. J. Construct. Manage. 17 (1): 13–24. https://doi.org/10.1080/15623599.2016.1166548.
Macrotrends. 2021. “Hyderabad, India metro area population 1950–2022.” Accessed July 25, 2021. https://www.macrotrends.net/cities/21275/hyderabad/population.
Martínez Lage, I., F. Martínez Abella, C. V. Herrero, and J. L. P. Ordóñez. 2010. “Estimation of the annual production and composition of C&D debris in Galicia (Spain).” Waste Manage. 30 (4): 636–645. https://doi.org/10.1016/j.wasman.2009.11.016.
Mcbean, E. A., and M. H. P. Fortin. 1993. “A forecast model of refuse tonnage with recapture and uncertainty bounds.” Waste Manage. Res. 11 (5): 373–385. https://doi.org/10.1177/0734242X9301100502.
Poon, C. S. 1997. “Management and recycling of demolition waste in Hong Kong.” Waste Manage. Res. 15 (6): 561–572. https://doi.org/10.1177/0734242X9701500602.
Poon, C. S., A. T. W. Yu, S. C. See, and E. Cheung. 2004. “Minimizing demolition wastes in Hong Kong public housing projects.” Construct. Manage. Econ. 22 (8): 799–805. https://doi.org/10.1080/0144619042000213283.
Ram, V. G., and S. N. Kalidindi. 2017. “Estimation of construction and demolition waste using waste generation rates in Chennai, India.” Waste Manage. Res. 35 (6): 610–617. https://doi.org/10.1177/0734242X17693297.
Saunders, M., P. Lewis, and A. Thornhill. 2016. Research methods for business students. Reston, VA: Pearson.
Seo, S., and Y. Hwang. 1999. “An estimation of construction and demolition debris in Seoul, Korea: Waste amount, type, and estimating model.” J. Air Waste Manage. Assoc. 49 (8): 980–985. https://doi.org/10.1080/10473289.1999.10463863.
Shi, J., and Y. Xu. 2006. “Estimation and forecasting of concrete debris amount in China.” Resour. Conserv. Recycl. 49 (2): 147–158. https://doi.org/10.1016/j.resconrec.2006.03.011.
Solís-Guzmán, J., M. Marrero, M. V. Montes-Delgado, and A. Ramírez-de-Arellano. 2009. “A Spanish model for quantification and management of construction waste.” Waste Manage. 29 (9): 2542–2548. https://doi.org/10.1016/j.wasman.2009.05.009.
Tam, V. W. Y., and C. M. Tam. 2006. “A review on the viable technology for construction waste recycling.” Resour. Conserv. Recycl. 47 (3): 209–221. https://doi.org/10.1016/j.resconrec.2005.12.002.
Tamraz, S. N., I. M. Srour, and G. R. Chehab. 2011. “Construction demolition waste management in Lebanon.” In Proc., Int. Conf. on Sustainable Design and Construction (ICSDC) 2011. Reston, VA: ASCE.
Telangana Today. 2021. “Construction and demolition waste recycling plant opened in Hyderabad.” Accessed July 25, 2021. https://telanganatoday.com/construction-and-demolition-waste-recycling-plant-opened-in-hyderabad.
Villoria Sáez, P., M. Del Río Merino, and C. Porras-Amores. 2012. “Estimation of construction and demolition waste volume generation in new residential buildings in Spain.” Waste Manage. Res. 30 (2): 137–146. https://doi.org/10.1177/0734242X11423955.
Wimalasena, B. A. D. S., J. Y. Ruwanpura, and J. P. A. Hettiaratchi. 2010. “Modeling construction waste generation towards sustainability.” In Proc., Construction Research Congress 2010: Innovation for Reshaping Construction Practice, 1498–1507. Reston, VA: ASCE. https://doi.org/10.1061/41109(373)150.
Wu, H., J. Wang, H. Duan, L. Ouyang, W. Huang, and J. Zuo. 2016. “An innovative approach to managing demolition waste via GIS (geographic information system): A case study in Shenzhen city, China.” J. Cleaner Prod. 112 (8): 494–503. https://doi.org/10.1016/j.jclepro.2015.08.096.
Wu, Z., A. T. W. Yu, L. Shen, and G. Liu. 2014. “Quantifying construction and demolition waste: An analytical review.” Waste Manage. 34 (9): 1683–1692. https://doi.org/10.1016/j.wasman.2014.05.010.
Ye, G., H. P. Yuan, and H. X. Wang. 2010. “Estimating the generation of construction and demolition waste by using system dynamics: A proposed model.” In Proc., Int. Conf. on Environmental Pollution and Public Health (EPPH2010), 1–4. New York: IEEE.
Yost, P. A., and J. M. Halstead. 1996. “A methodology for quantifying the volume of construction waste.” Waste Manage. Res. 14 (5): 453–461. https://doi.org/10.1177/0734242X9601400504.
Zhao, W., R. B. Leeftink, and V. S. Rotter. 2010. “Evaluation of the economic feasibility for the recycling of construction and demolition waste in China—The case of Chongqing.” Resour. Conserv. Recycl. 54 (6): 377–389. https://doi.org/10.1016/j.resconrec.2009.09.003.
Zhao, W., H. Ren, and V. S. Rotter. 2011. “A system dynamics model for evaluating the alternative of type in construction and demolition waste recycling center—The case of Chongqing, China.” Resour. Conserv. Recycl. 55 (11): 933–944.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 148Issue 9September 2022

History

Received: Aug 9, 2021
Accepted: May 2, 2022
Published online: Jul 9, 2022
Published in print: Sep 1, 2022
Discussion open until: Dec 9, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Assistant Professor, National Institute of Construction Management and Research, Hyderabad, Telangana 500 101, India; Research Scholar, Dept. of Civil Engineering, Indian Institute of Technology Delhi, New Delhi 110016, India (corresponding author). ORCID: https://orcid.org/0000-0002-5997-9394. Email: [email protected]
Kumar Neeraj Jha, Ph.D. [email protected]
Professor, Dept. of Civil Engineering, Indian Institute of Technology Delhi, New Delhi 110016, India. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share