Alternative Dispute Resolution Selection Framework to Settle Disputes in Public–Private Partnership Projects

Publication: Journal of Construction Engineering and Management
Volume 148, Issue 9

Abstract

Effective use of alternative dispute resolution (ADR) methods is critical because disputes are one of the biggest concerns in public–private partnership (PPP) projects. However, decision makers still struggle to implement ADR effectively due to limited knowledge about selecting the most appropriate ADR method that meets the needs of their PPP projects. Although some research has been conducted to develop approaches for ADR selection, most of these studies ignored critical points such as PPP projects and inherent characteristics of disputes. Moreover, fuzzy set logic and integrated multicriteria decision-making (MCDM) methods have not usually been chosen in these studies, posing various limitations. This study aimed to bridge these gaps by proposing a decision support framework for decision makers in selecting the most appropriate ADR method to settle disputes in PPP projects. Initially, an in-depth literature review was conducted to design the initial version of the framework. Then, the focus group discussion (FGD) sessions were organized and subject matter experts refined the draft framework. In total, a list of 16 selection factors and 30 dispute types were identified through literature review and the FGD sessions. At the final step, fuzzy analytic hierarchy process (AHP) and integrated fuzzy AHP and fuzzy TOPSIS were performed to determine the priority of each ADR method for each dispute scenario. Results showed that ADR selection is strongly influenced by inherent characteristics of dispute types. In other words, an ADR method cannot settle all dispute types, and thus, inherent characteristics of dispute types should also be considered during the ADR selection. Second, dispute management in PPP projects necessitates project-specific approaches. Thus, decision makers should not rely fully on standard contract forms such as those of the International Federation of Consulting Engineers (FIDIC). By developing a specific ADR selection framework for PPP projects by considering dispute types, this study significantly contributes to the theory of ADR domain and has important managerial implications.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or codes that support the findings of this study are available from the corresponding author upon reasonable request.

References

Abdul-Malak, M.-A. U., and Z. Hassanein. 2001. “Asphalt works subcontracting disputes in large construction programs.” J. Perform. Constr. Facil. 15 (2): 62–67. https://doi.org/10.1061/(ASCE)0887-3828(2001)15:2(62).
Abwunza, A. A., T. K. Peter, and K. Muigua. 2020. “Explaining delays in construction arbitration: A process-control model approach.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (2): 04520003. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000371.
Ajaelu, H. C., and R. A. Okereke. 2020. “Arbitration as an alternative to litigation in construction projects.” Int. J. Manage. Humanities 4 (9): 166–172. https://doi.org/10.35940/ijmh.I0860.054920.
APMG (APM Group) International. 2021. “PPP certification guide.” Accessed June 7, 2022. https://ppp-certification.com/ppp-certification-guide/98-dispute-resolution.
Arcadis. 2018. “Global construction disputes report: Does the construction industry learn from its mistakes?” Accessed June 7, 2022. https://www.arcadis.com/-/media/project/arcadiscom/com/perspectives/global/2020/global-construction-disputes-2020/global-construction-disputes-report-2018.pdf.
Aritonang, D. D., and R. A. Simanjuntak. 2020. “Analysis of important factors in choosing or using process alternative dispute resolution of construction project from contractor’s perspective (Case Study in XYZ Company, Ltd’s).” IOP Conf. Ser.: Mater. Sci. Eng. 1007 (1): 021084. https://doi.org/10.1088/1757-899X/1007/1/012084.
Barman, A., and C. Charoenngam. 2017. “Decisional uncertainties in construction projects as a cause of disputes and their formal legal interpretation by the courts: Review of legal cases in the United Kingdom.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 9 (3): 04517011. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000222.
Beltrão, L. M. P., and M. T. M. Carvalho. 2019. “Prioritizing construction risks using fuzzy AHP in Brazilian public enterprises.” J. Constr. Eng. Manage. 145 (2): 05018018. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001606.
BMI (Business Monitor International). 2017. “Industry trend analysis—PPP failures highlight project execution risks.” Accessed April 15, 2018. http://www.infrastructure-insight.com/industry-trend -analysis-ppp-failures-highlight-project-execution-risks-feb-2017.
Brooker, P. 2007. “An investigation of evaluative and facilitative approaches to construction mediation.” Struct. Surv. 25 (3–4): 220–238. https://doi.org/10.1108/02630800710772818.
Budayan, C. 2019. “Evaluation of delay causes for BOT projects based on perceptions of different stakeholders in Turkey.” J. Manage. Eng. 35 (1): 04018057. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000668.
Budayan, C., O. Okudan, and I. Dikmen. 2020. “Identification and prioritization of stage-level KPIs for BOT projects—Evidence from Turkey.” Int. J. Managing Projects Bus. 13 (6): 1311–1337. https://doi.org/10.1108/IJMPB-11-2019-0286.
Calvert, M. D. 1991. “Out with the old, in with the new: The mini-trial is the new wave in resolving international disputes.” J. Dispute Resolut. 1991 (1): 1–16.
Çevikbaş, M., and A. Köksal. 2018. “An investigation of litigation process in construction industry in Turkey.” Teknik Dergi 29 (6): 8715–8729.
Chan, A. P. C., P. T. I. Lam, Y. Wen, E. E. Ameyaw, S. Wang, and Y. Ke. 2015. “Cross-sectional analysis of critical risk factors for PPP water projects in China.” J. Infrastruct. Syst. 21 (1): 04014031. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000214.
Chan, E. H., H. C. Suen, and C. K. Chan. 2006. “MAUT-based dispute resolution selection model prototype for international construction projects.” J. Constr. Eng. Manage. 132 (5): 444–451. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:5(444).
Chan, E. H. W., and R. Y. C. Tse. 2003. “Cultural considerations in international construction contracts.” J. Constr. Eng. Manage. 129 (4): 375–381. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:4(375).
Chan, I. Y. S., M. Leung, and S. S. W. Yu. 2012. “Managing the stress of Hong Kong expatriate construction professionals in mainland China: Focus group study exploring individual coping strategies and organizational support.” J. Constr. Eng. Manage. 138 (10): 1150–1160. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000533.
Chang, D.-Y. 1996. “Applications of the extent analysis method on fuzzy AHP.” Eur. J. Oper. Res. 95 (3): 649–655. https://doi.org/10.1016/0377-2217(95)00300-2.
Charoenngam, C., and W. Mahavarakorn. 2011. “Collaborative negotiation behaviors in Thai construction projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 3 (3): 109–115. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000047.
Charoenngam, C., and C. Y. Yeh. 1999. “Contractual risk and liability sharing in hydropower construction.” Int. J. Project Manage. 17 (1): 29–37. https://doi.org/10.1016/S0263-7863(97)00064-1.
Chau, K. 1992. “Resolving construction disputes by mediation: Hong Kong experience.” J. Manage. Eng. 8 (4): 384–393. https://doi.org/10.1061/(ASCE)9742-597X(1992)8:4(384).
Chen, C.-T. 2000. “Extensions of the TOPSIS for group decision-making under fuzzy environment.” Fuzzy Sets Syst. 114 (1): 1–9. https://doi.org/10.1016/S0165-0114(97)00377-1.
Cheung, S. O., and H. C. H. Suen. 2002. “A multi-attribute utility model for dispute resolution strategy selection.” Constr. Manage. Econ. 20 (7): 557–568. https://doi.org/10.1080/01446190210157568.
Cheung, S. O., and Y. W. Yeung. 1998. “The effectiveness of the dispute resolution advisor system: A critical appraisal.” Int. J. Project Manage. 16 (6): 367–374. https://doi.org/10.1016/S0263-7863(98)00010-6.
Cheung, S. O., and K. T. W. Yiu. 2007. “A study of construction mediator tactics–Part I: Taxonomies of dispute sources, mediator tactics and mediation outcomes.” Build. Environ. 42 (2): 752–761. https://doi.org/10.1016/j.buildenv.2005.09.004.
Cheung, S. O., T. W. Yiu, and S. F. Yeung. 2006. “A study of styles and outcomes in construction dispute negotiation.” J. Constr. Eng. Manage. 132 (8): 805–814. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:8(805).
Cheung, S.-O. 1999. “Critical factors affecting the use of alternative dispute resolution processes in construction.” Int. J. Project Manage. 17 (3): 189–194. https://doi.org/10.1016/S0263-7863(98)00027-1.
Cheung, S.-O., T.-I. Lam, M.-Y. Leung, and Y.-W. Wan. 2001. “An analytical hierarchy process based procurement selection method.” Constr. Manage. Econ. 19 (4): 427–437. https://doi.org/10.1080/014461901300132401.
Chong, H. Y., and R. M. Zin. 2012. “Selection of dispute resolution methods: Factor analysis approach.” Eng. Constr. Archit. Manage. 19 (4): 428–443. https://doi.org/10.1108/09699981211237120.
Cong, X., and L. Ma. 2018. “Performance evaluation of public-private partnership projects from the perspective of efficiency, economic, effectiveness, and equity: A study of residential renovation projects in China.” Sustainability (Switzerland) 10 (6): 1951. https://doi.org/10.3390/su10061951.
Dainty, A. R. J., M. I. Cheng, and D. R. Moore. 2003. “Redefining performance measures for construction project managers: An empirical evaluation.” Constr. Manage. Econ. 21 (2): 209–218. https://doi.org/10.1080/0144619032000049737.
Dancaster, C. 2008. “Construction adjudication in the United Kingdom: Past, present, and future.” J. Prof. Issues Eng. Educ. Pract. 134 (2): 204–208. https://doi.org/10.1061/(ASCE)1052-3928(2008)134:2(204).
Darko, A., A. P. C. Chan, E. E. Ameyaw, E. K. Owusu, E. Pärn, and D. J. Edwards. 2019. “Review of application of analytic hierarchy process (AHP) in construction.” Int. J. Constr. Manage. 19 (5): 436–452. https://doi.org/10.1080/15623599.2018.1452098.
Dulaimi, M. F., M. Alhashemi, F. Y. Y. Ling, and M. Kumaraswamy. 2010. “The execution of public-private partnership projects in the UAE.” Constr. Manage. Econ. 28 (4): 393–402. https://doi.org/10.1080/01446191003702492.
Edelman, L., and F. Carr. 1987. “The mini-trial: An alternative dispute resolution procedure.” Arbitration J. 42 (1): 7–14.
El-adaway, I. H., A. S. Ezeldin, and J. K. Yates. 2009. “Arbitral tribunal proceedings case study: Egyptian large-scale construction project.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 1 (3): 147–153. https://doi.org/10.1061/(ASCE)1943-4162(2009)1:3(147).
Emek, U. 2015. “Turkish experience with public private partnerships in infrastructure: Opportunities and challenges.” Util. Policy 37 (Dec): 120–129. https://doi.org/10.1016/j.jup.2015.06.005.
EPEC (European PPP Expertise Centre). 2018. “Market update: Review of the European PPP market in 2012.” In European PPP expertise centre. Luxembourg: Luxembourg European Investment Bank.
FIDIC (International Federation of Consulting Engineers). 1987. Conditions of contract for works of civil engineering construction. Lausanne, Switzerland: FIDIC.
Gad, G. M., J. S. Shane, K. C. Strong, and J. Choi. 2016. “Rethinking trust in construction contract formation: Dispute resolution method selection.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 8 (3): 04516003. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000191.
Graham, P., N. Nikolova, and S. Sankaran. 2020. “Tension between leadership archetypes: Systematic review to inform construction research and practice.” J. Manage. Eng. 36 (1): 03119002. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000722.
Harmon, K. M. J. 2003. “Effectiveness of dispute review boards.” J. Constr. Eng. Manage. 129 (6): 674–679. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:6(674).
Hasan, A., A. Elmualim, R. Rameezdeen, B. Baroudi, and A. Marshall. 2018. “An exploratory study on the impact of mobile ICT on productivity in construction projects” Built Environ. Project Asset Manage. 8 (3): 320–332. https://doi.org/10.1108/BEPAM-10-2017-0080.
Haugen, T., and A. Singh. 2015. “Dispute resolution strategy selection.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 7 (3): 05014004. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000160.
Hosseini Nasab, H., and M. Mirghani Ghamsarian. 2015. “A fuzzy multiple-criteria decision-making model for contractor prequalification.” J. Decis. Syst. 24 (4): 433–448. https://doi.org/10.1080/12460125.2015.1081048.
İç, Y. T. 2012. “An experimental design approach using TOPSIS method for the selection of computer-integrated manufacturing technologies.” Rob. Comput. Integr. Manuf. 28 (2): 245–256. https://doi.org/10.1016/j.rcim.2011.09.005.
Illankoon, I. M. C. S., V. W. Y. Tam, K. N. Le, and K. A. T. O. Ranadewa. 2019. “Causes of disputes, factors affecting dispute resolution and effective alternative dispute resolution for Sri Lankan construction industry.” Int. J. Constr. Manage. 22 (2): 218–228. https://doi.org/10.1080/15623599.2019.1616415.
Infrastructure Australia. 2008. National public private partnership guidelines: Overview. Canberra, Australia: Australian Government.
Javanbarg, M. B., C. Scawthorn, J. Kiyono, and B. Shahbodaghkhan. 2012. “Fuzzy AHP-based multicriteria decision making systems using particle swarm optimization.” Expert Syst. Appl. 39 (1): 960–966. https://doi.org/10.1016/j.eswa.2011.07.095.
Kendall, J. 1997. “Expert determination in major projects.” Int. Bus. Lawyer 25 (4): 171–174.
Kisi, K. P., N. Lee, R. Kayastha, and J. Kovel. 2020. “Alternative dispute resolution practices in international road construction contracts.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (2): 04520001. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000373.
Köksal, J. T. 2011. “FIDIC conditions of contract as a model for an international construction contract.” Int. J. Humanities Social Sci. 1 (8): 140–157.
Koulinas, G. K., P. K. Marhavilas, O. E. Demesouka, A. P. Vavatsikos, and D. E. Koulouriotis. 2019. “Risk analysis and assessment in the worksites using the fuzzy-analytical hierarchy process and a quantitative technique—A case study for the Greek construction sector.” Saf. Sci. 112 (Feb): 96–104. https://doi.org/10.1016/j.ssci.2018.10.017.
Kumar, A., A. Moktadir, Z. R. Liman, A. Gunasekaran, K. Hegemann, and S. A. Rehman Khan. 2020. “Evaluating sustainable drivers for social responsibility in the context of ready-made garments supply chain.” J. Cleaner Prod. 248 (Apr): 119231. https://doi.org/10.1016/j.jclepro.2019.119231.
Kumaraswamy, M. M. 1997. “Conflicts, claims and disputes in construction.” Eng. Constr. Archit. Manage. 4 (2): 95–111. https://doi.org/10.1108/eb021042.
Kylili, A., E. Christoforou, P. A. Fokaides, and P. Polycarpou. 2016. “Multicriteria analysis for the selection of the most appropriate energy crops: The case of Cyprus.” Int. J. Sustain. Energy 35 (1): 47–58. https://doi.org/10.1080/14786451.2014.898640.
Lawrence, M. 2017. “Nomination of subcontractors in the UAE.” Proc. Inst. Civ. Eng.: Manage. Procure. Law 170 (4): 167–171.
Lee, C. K., T. W. Yiu, and S. O. Cheung. 2016. “Selection and use of alternative dispute resolution (ADR) in construction projects—Past and future research.” Int. J. Project Manage. 34 (3): 494–507. https://doi.org/10.1016/j.ijproman.2015.12.008.
Lee, C. K., T. W. Yiu, and S. O. Cheung. 2018a. “Application of the theory of planned behavior to alternative dispute resolution selection and use in construction projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 10 (2): 04518003. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000252.
Lee, C. K., T. W. Yiu, and S. O. Cheung. 2018b. “Understanding intention to use alternative dispute resolution in construction projects: Framework based on technology acceptance model.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 10 (1): 04517021. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000245.
Lee, C. K., T. W. Yiu, and S. O. Cheung. 2021. “Predicting intention to use alternative dispute resolution (ADR): An empirical test of theory of planned behaviour (TPB) model.” Int. J. Constr. Manage. 21 (1): 27–40. https://doi.org/10.1080/15623599.2018.1505026.
Legislation.gov.uk. 1996. Housing Grants, Construction and Regeneration Act 1996. London: Stationery Office.
Legislation.gov.uk. 2001. Arbitration Act 1996. London: Stationery Office.
Liu, H.-C., M.-Y. Quan, Z. Li, and Z.-L. Wang. 2019. “A new integrated MCDM model for sustainable supplier selection under interval-valued intuitionistic uncertain linguistic environment.” Inf. Sci. 486 (Jun): 254–270. https://doi.org/10.1016/j.ins.2019.02.056.
Lu, W., and J. Liu. 2014. “Research into the moderating effects of progress and quality performance in project dispute negotiation.” Int. J. Project Manage. 32 (4): 654–662. https://doi.org/10.1016/j.ijproman.2013.09.008.
Maitra, A., and V. Srivastava. 2020. “International and national perspective of alternative dispute resolution (ADR).” Mukt Shabd J. 9 (6): 5665–5683.
Marques, R. C. 2018. “Is arbitration the right way to settle conflicts in PPP arrangements?” J. Manage. Eng. 34 (1): 05017007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000564.
Marzouk, M., L. El-Mesteckawi, and M. El-Said. 2011. “Dispute resolution aided tool for construction projects in Egypt.” J. Civ. Eng. Manage. 17 (1): 63–71. https://doi.org/10.3846/13923730.2011.554165.
Marzouk, M., A. Othman, M. Anaba, and M. Zaher. 2017. “Proactive construction claims analysis using BIM.” In Proc., Leadership in Sustainable Infrastructure, CON045-1-10. Montreal: Canadian Society for Civil Engineering.
Naji, K. K., M. M. Mansour, and M. Gunduz. 2020. “Methods for modeling and evaluating construction disputes: A critical review.” IEEE Access 8 (Feb): 45641–45652. https://doi.org/10.1109/ACCESS.2020.2976109.
Okudan, O., and C. Budayan. 2020. “Assessment of project characteristics affecting risk occurrences in construction projects using fuzzy AHP.” Sigma J. Eng. Nat. Sci. 38 (3): 1447–1462.
Okudan, O., C. Budayan, and I. Dikmen. 2021. “Development of a conceptual life cycle performance measurement system for build–operate–transfer (BOT) projects.” Eng. Constr. Archit. Manage. 28 (6): 1635–1656. https://doi.org/10.1108/ECAM-01-2020-0071.
Qu, Y., and S. O. Cheung. 2013. “Experimental evaluation of logrolling as an effective mediating tactic in construction project management.” Int. J. Project Manage. 31 (5): 775–790. https://doi.org/10.1016/j.ijproman.2012.05.003.
Rao, R. V. 2007. “Decision making in the manufacturing environment.” In Springer series in advanced manufacturing. London: Springer.
Regan, M., J. Smith, and P. E. D. Love. 2010. “Impact of the capital market collapse on public-private partnership infrastructure projects.” J. Constr. Eng. Manage. 137 (1): 6–16. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000245.
Ribas, J. R., M. E. Arce, F. A. Sohler, and A. Suárez-García. 2019. “Multi-criteria risk assessment: Case study of a large hydroelectric project.” J. Cleaner Prod. 227 (Aug): 237–247. https://doi.org/10.1016/j.jclepro.2019.04.043.
Rogulj, K., and N. Jajac. 2018. “Achieving a construction barrier–free environment: Decision support to policy selection.” J. Manage. Eng. 34 (4): 04018020. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000618.
Saaty, T. L. 1980. The analytic hierarchy process. New York: McGraw-Hill.
Saaty, T. L. 2004. “Decision making—The analytic hierarchy and network processes (AHP/ANP).” J. Syst. Sci. Syst. Eng. 13 (1): 1–35. https://doi.org/10.1007/s11518-006-0151-5.
Saidov, D. T. 2019. Challenging a third-party expert determination.” NUS Law Working Paper No. 2019/018, NUS Centre for Maritime Law Working Paper 19/06. Singapore: National Univ. of Singapore.
Sander, F. E. A. 1985. “Alternative methods of dispute resolution: An overview.” Univ. Florida Law Rev. 37 (1): 1–18.
Shabbar, H., F. Ullah, B. Ayub, M. J. Thaheem, and H. F. Gabriel. 2017. “Empirical evidence of extension of time in construction projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 9 (3): 04517008. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000217.
Shah, S. A. A., Y. A. Solangi, and M. Ikram. 2019. “Analysis of barriers to the adoption of cleaner energy technologies in Pakistan using modified Delphi and fuzzy analytical hierarchy process.” J. Cleaner Prod. 235 (Oct): 1037–1050. https://doi.org/10.1016/j.jclepro.2019.07.020.
Sinha, A. K., and K. N. Jha. 2019. “Impact of judicial overreach on PPP construction projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 11 (4): 05019006. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000330.
Sinha, A. K., and K. N. Jha. 2020. “Dispute resolution and litigation in PPP road projects: Evidence from select cases.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 05019007. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000336.
Tang, L., G. Q. Shen, M. Skitmore, and H. Wang. 2014. “Procurement-related critical factors for briefing in public-private partnership projects: Case of Hong Kong.” J. Manage. Eng. 31 (6): 4014096. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000352.
Thompson, R. M., M. C. Vorster, and J. P. Groton. 2000. “Innovations to manage disputes: DRB and NEC.” J. Manage. Eng. 16 (5): 51–59. https://doi.org/10.1061/(ASCE)0742-597X(2000)16:5(51).
Tong, Y. 2009. “Dispute resolution strategies in a hybrid system.” China Rev. 9 (1): 17–43.
Uher, T. E., and M. C. Brand. 2005. “Analysis of adjudication determinations made under security of payment legislation in New South Wales.” Int. J. Project Manage. 23 (6): 474–482. https://doi.org/10.1016/j.ijproman.2005.05.002.
UN ESCAP. 2021. “Differences between PPP and conventional projects.” Accessed June 7, 2022. https://www.unescap.org/ttdw/ppp/ppp_primer/04_differences_between_ppp_and_conventional_projects.html.
United Nations. 1958. “The New York convention.” Accessed February 26, 2021. https://www.newyorkconvention.org/11165/web/files/original/1/5/15432.pdf.
Wang, Y.-J. J. 2008. “Applying FMCDM to evaluate financial performance of domestic airlines in Taiwan.” Expert Syst. Appl. 34 (3): 1837–1845. https://doi.org/10.1016/j.eswa.2007.02.029.
Weisheng, L., A. M. M. Liu, W. Hongdi, and W. Zhongbing. 2013. “Procurement innovation for public construction projects: A study of agent-construction system and public-private partnership in China.” Eng. Constr. Archit. Manage. 20 (6): 543–562. https://doi.org/10.1108/ECAM-09-2011-0084.
Yadav, G., and T. N. Desai. 2017. “A fuzzy AHP approach to prioritize the barriers of integrated Lean Six Sigma.” Int. J. Qual. Reliab. Management 34 (8): 1167–1185. https://doi.org/10.1108/IJQRM-01-2016-0010.
Yang, X. L., J. H. Ding, and H. Hou. 2013. “Application of a triangular fuzzy AHP approach for flood risk evaluation and response measures analysis.” Nat. Hazards 68 (2): 657–674. https://doi.org/10.1007/s11069-013-0642-x.
Yi, W., and A. P. C. Chan. 2014. “Critical review of labor productivity research in construction journals.” J. Manage. Eng. 30 (2): 214–225. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000194.
Yusuwan, N. M., and H. Adnan. 2013. “Issues associated with extension of time (EoT) claim in Malaysian construction industry.” Procedia Technol. 9 (Jan): 740–749. https://doi.org/10.1016/j.protcy.2013.12.082.
Zadeh, L. 1965. “Fuzzy sets.” Inf. Control 8 (3): 338–353. https://doi.org/10.1016/S0019-9958(65)90241-X.
Zheng, X., Y. Liu, J. Jiang, L. M. Thomas, and N. Su. 2021. “Predicting the litigation outcome of PPP project disputes between public authority and private partner using an ensemble model.” J. Bus. Econ. Manage. 22 (2): 320–345. https://doi.org/10.3846/jbem.2021.13219.
Zyoud, S. H., L. G. Kaufmann, H. Shaheen, S. Samhan, and D. Fuchs-Hanusch. 2016. “A framework for water loss management in developing countries under fuzzy environment: Integration of fuzzy AHP with fuzzy TOPSIS.” Expert Syst. Appl. 61 (Nov): 86–105. https://doi.org/10.1016/j.eswa.2016.05.016.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 148Issue 9September 2022

History

Received: Nov 8, 2021
Accepted: Apr 25, 2022
Published online: Jun 30, 2022
Published in print: Sep 1, 2022
Discussion open until: Nov 30, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Research Assistant, Dept. of Civil Engineering, Yildiz Technical Univ., Istanbul 34220, Turkey (corresponding author). ORCID: https://orcid.org/0000-0001-7816-2761. Email: [email protected]
Murat Çevikbaş [email protected]
Research Assistant, Dept. of Civil Engineering, Isparta Univ. of Applied Sciences, Isparta 32260, Turkey. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Analysis of Price Adjustment Claim during Project Time Extension, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10.1061/JLADAH.LADR-1063, 16, 1, (2024).
  • Modeling and Understanding Dispute Causation in the US Public–Private Partnership Projects, Journal of Infrastructure Systems, 10.1061/JITSE4.ISENG-2328, 30, 1, (2024).
  • Application of Group Decision Making in Shipping Industry 4.0: Bibliometric Analysis, Trends, and Future Directions, Systems, 10.3390/systems11020069, 11, 2, (69), (2023).
  • Construction Claims and Payment Disputes Analysis: Alternative Dispute Resolution to Litigation, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10.1061/JLADAH.LADR-908, 15, 1, (2023).
  • Critical Issues Affecting Dispute Resolution Practice in Infrastructure Public–Private Partnerships, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-12902, 149, 3, (2023).
  • BIM-based big data analytic system for healthcare facility management, Journal of Building Engineering, 10.1016/j.jobe.2022.105713, 64, (105713), (2023).
  • Social Dimensions in Ex-Post Evaluation of Public Private Partnership Infrastructure Projects: A Scoping Review, Sustainability, 10.3390/su142315808, 14, 23, (15808), (2022).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share