Abstract

As projects evolve into complex and specialized temporary initiatives, accountability shortfalls in material flow are a major reason for schedule and cost overruns in construction. To date, researchers and practitioners are unresolved regarding the causes of material handling challenges and eminent solutions to improve material flow accountability. Consequently, inefficient supply chain management practices persist, leading to ineffective handling methods. This research, therefore, focused on identifying critical material challenges encountered by contractors and presented solutions to alleviate schedule and cost overrun failures. The fuzzy Delphi approach was used to refine opinions and achieve group consensus from 15 specialists on the ranking of material handling problems and potential solutions associated with design-build projects. The research revealed that complexity, material flow, and lack of information sharing are the top three main causes of onsite material problems. Potential solutions identified were a faster response mechanism (as an alternative to a slower build schedule), increasing material handlers’ worker power, subcontractors’ involvement in the procurement process, and prefabrication. The research highlighted subcontracting as a material handling paradox as apart from being a solution, it creates non-value-added costs in the supply chain and often inappropriately transfers risk. The findings showcased the potential to improve onsite material handling praxis by considering decision-making uncertainties in material flow and recognizing the importance of procurement methods in construction supply chain solutions in resolving scheduling and cost inefficiencies.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Data for this research are provided within the published paper.

References

Abdulkareem, K. H., N. Arbaiy, A. Zaidan, B. Zaidan, O. S. Albahri, M. Alsalem, and M. M. Salih. 2021. “A new standardisation and selection framework for real-time image dehazing algorithms from multi-foggy scenes based on fuzzy Delphi and hybrid multi-criteria decision analysis methods.” Neural Comput. Appl. 33 (4): 1029–1054. https://doi.org/10.1007/s00521-020-05020-4.
Abeysinghe, A., K. Waidyasekara, and D. Melagoda. 2018. “Beyond site material handling and transportation in large-scale construction projects.” In Proc., 2018 Moratuwa Engineering Research Conf. (MERCon), 66–71. New York: IEEE.
Adler, M., and E. Ziglio. 1996. The Delphi method and its application to social policy and public health. London: Jessica Kingsley.
Ahmed, F. H. 2017. “Improving construction materials management practices in construction sites.” Ph.D. thesis, Technology Management and Business, Universiti Tun Hussein Onn Malaysia.
Aibinu, A. A., and H. A. Odeyinka. 2006. “Construction delays and their causative factors in Nigeria.” J. Constr. Eng. Manage. 132 (7): 667–677. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:7(667).
Anil Kumar, C., M. Sakthivel, R. Elangovan, and M. Arularasu. 2015. “Analysis of material handling safety in construction sites and countermeasures for effective enhancement.” Sci. World J. 2015: 1–7. https://doi.org/10.1155/2015/742084.
Assaf, S. A., M. Al-Khalil, and M. Al-Hazmi. 1995. “Causes of delay in large building construction projects.” J. Manage. Eng. 11 (2): 45–50. https://doi.org/10.1061/(ASCE)0742-597X(1995)11:2(45).
Bäckstrand, J., and A. Fredriksson. 2020. “The role of supplier information availability for construction supply chain performance.” Prod. Plann. Control. 1–12. https://doi.org/10.1080/09537287.2020.1837933.
Bagaya, O., and J. Song. 2016. “Empirical study of factors influencing schedule delays of public construction projects in Burkina Faso.” J. Manage. Eng. 32 (5): 05016014. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000443.
Baiden, B. K., A. D. Price, and A. R. Dainty. 2006. “The extent of team integration within construction projects.” Int. J. Project Manage. 24 (1): 13–23. https://doi.org/10.1016/j.ijproman.2005.05.001.
Balakrishnan, J., F. Bowne, and A. L. Eckstein. 2008. “A strategic framework for managing failure in JIT supply chains.” Int. J. Inf. Syst. Supply Chain Manage. 1 (4): 20–38. https://doi.org/10.4018/jisscm.2008100102.
Balin, S. 2011. “Parallel machine scheduling with fuzzy processing times using a robust genetic algorithm and simulation.” Inf. Sci. 181 (17): 3551–3569. https://doi.org/10.1016/j.ins.2011.04.010.
Behera, P., R. P. Mohanty, and A. Prakash. 2015. “Understanding construction supply chain management.” Prod. Plann. Control 26 (16): 1332–1350. https://doi.org/10.1080/09537287.2015.1045953.
Briscoe, G., and A. Dainty. 2005. “Construction supply chain integration: An elusive goal?” Supply Chain Manage. 10 (4): 319–326. https://doi.org/10.1108/13598540510612794.
Bui, T. D., F. M. Tsai, M.-L. Tseng, and M. H. Ali. 2020. “Identifying sustainable solid waste management barriers in practice using the fuzzy Delphi method.” Resour. Conserv. Recycl. 154 (Mar): 104625. https://doi.org/10.1016/j.resconrec.2019.104625.
Buzoianu, G. 2020. “Delivery delay | what causes late shipping delivery?” Accessed January 30, 2022. https://www.eurosender.com/blog/en/delayed-delivery/.
Cantrill, J. A., B. Sibbald, and S. Buetow. 1996. “The Delphi and nominal group techniques in health services research.” Int. J. Pharm. Pract. 4 (2): 67–74. https://doi.org/10.1111/j.2042-7174.1996.tb00844.x.
Chakuu, S., J. Godsell, and J. Glass. 2020. “Supply chain productivity in construction.” In Transforming construction network plus digest series, 114. London: Univ. College London.
Chan, A. P., D. Scott, and A. P. Chan. 2004. “Factors affecting the success of a construction project.” J. Constr. Eng. Manage. 130 (1): 153–155. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:1(153).
Chan, E. H., and M. C. Au. 2007. “Building contractors’ behavioural pattern in pricing weather risks.” Int. J. Project Manage. 25 (6): 615–626. https://doi.org/10.1016/j.ijproman.2007.01.017.
Chang, L. 1994. “A psychometric evaluation of 4-point and 6-point Likert-type scales in relation to reliability and validity.” Appl. Psychol. Meas. 18 (3): 205–215. https://doi.org/10.1177/014662169401800302.
Chappell, D. 2008. The JCT design and build contract 2005. New York: Wiley.
Chen, H.-T. 2014. “Applying fuzzy multiple criteria decision-making method and service failure index to evaluate restaurants’ performance.” J. Manage. Strategy 5 (4): 14–25. https://doi.org/10.5430/jms.v5n4p14.
Chen, S.-H., and C. H. Hsieh. 1999. “Graded mean integration representation of generalized fuzzy number.” J. Chin. Fuzzy Syst. Assoc. 5 (2): 1–7.
Chen, Z., H. Li, and C. T. Wong. 2002. “An application of bar-code system for reducing construction wastes.” Autom. Constr. 11 (5): 521–533. https://doi.org/10.1016/S0926-5805(01)00063-2.
Chin, S., S. Yoon, C. Choi, and C. Cho. 2008. “RFID+ 4 D CAD for progress management of structural steel works in high-rise buildings.” J. Comput. Civ. Eng. 22 (2): 74–89. https://doi.org/10.1061/(ASCE)0887-3801(2008)22:2(74).
Deng, Y., V. J. L. Gan, M. Das, J. C. P. Cheng, and C. Anumba. 2019. “Integrating 4D BIM and GIS for construction supply chain management.” J. Constr. Eng. Manage. 145 (4): 04019016. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001633.
Donyavi, S., and R. Flanagan. 2009. “The impact of effective material management on construction site performance for small and medium sized construction enterprises.” In Proc., 25th Annual ARCOM Conf., edited by A. R. J. Dainty, 11–20. Nottingham, UK: Association of Researchers in Construction Management.
Egan, J. 1998. Construction task force: Rethinking construction. London: Department of Trade and Industries.
Erik Eriksson, P., M. Dickinson, and M. M. A. Khalfan. 2007. “The influence of partnering and procurement on subcontractor involvement and innovation.” Facilities 25 (5–6): 203–214. https://doi.org/10.1108/02632770710742174.
Faniran, O. O., J. O. Oluwoye, and D. J. Lenard. 1998. “Interactions between construction planning and influence factors.” J. Constr. Eng. Manage. 124 (4): 245–256. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:4(245).
Farmer, M. 2016. The farmer review of the UK construction labour model: Modernise or die. London: Construction Leadership Council.
Fikri Mohamed, S., and C. J. Anumba. 2006. “Potential for improving site management practices through knowledge management.” Constr. Innovation 6 (4): 232–249. https://doi.org/10.1108/14714170610713917.
Forsythe, P. J., and S. M. Sepasgozar. 2019. “Measuring installation productivity in prefabricated timber construction.” Eng. Constr. Archit. Manage. 26 (4): 578–598. https://doi.org/10.1108/ECAM-09-2017-0205.
Georgy, M., and S. Y. Basily. 2008. “Using genetic algorithms in optimizing construction material delivery schedules.” Constr. Innovation 8 (1): 23–45. https://doi.org/10.1108/14714170810846503.
Goodrum, P. M., M. A. McLaren, and A. Durfee. 2006. “The application of active radio frequency identification technology for tool tracking on construction job sites.” Autom. Constr. 15 (3): 292–302. https://doi.org/10.1016/j.autcon.2005.06.004.
Guerlain, C., S. Renault, and F. Ferrero. 2019. “Understanding construction logistics in urban areas and lowering its environmental impact: A focus on construction consolidation centres.” Sustainability 11 (21): 6118. https://doi.org/10.3390/su11216118.
Habibi, A., F. F. Jahantigh, and A. Sarafrazi. 2015. “Fuzzy Delphi technique for forecasting and screening items.” Asian J. Res. Bus. Econ. Manage. 5 (2): 130–143. https://doi.org/10.5958/2249-7307.2015.00036.5.
Hallowell, M. R., and J. A. Gambatese. 2010. “Population and initial validation of a formal model for construction safety risk management.” J. Constr. Eng. Manage. 136 (9): 981–990. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000204.
Hasan, A., B. Baroudi, A. Elmualim, and R. Rameezdeen. 2018. “Factors affecting construction productivity: A 30 year systematic review.” Eng. Constr. Archit. Manage. 25 (7): 916–937. https://doi.org/10.1108/ECAM-02-2017-0035.
Hasson, F., S. Keeney, and H. McKenna. 2000. “Research guidelines for the Delphi survey technique.” J. Adv. Nurs. 32 (4): 1008–1015. https://doi.org/10.1046/j.1365-2648.2000.t01-1-01567.x.
Haynes, N. S., and P. E. Love. 2004. “Psychological adjustment and coping among construction project managers.” Construct. Manage. Econ. 22 (2): 129–140. https://doi.org/10.1080/0144619042000201330.
Henderson, E. J., and G. P. Rubin. 2012. “Development of a community-based model for respiratory care services.” BMC Health Serv. Res. 12 (1): 1–10. https://doi.org/10.1186/1472-6963-12-193.
Hittle, B., and K. Moustafa Leonard. 2011. “Decision making in advance of a supply chain crisis.” Manage. Decis. 49 (7): 1182–1193. https://doi.org/10.1108/00251741111151208.
Hsu, Y.-L., C.-H. Lee, and V. B. Kreng. 2010. “The application of fuzzy Delphi method and fuzzy AHP in lubricant regenerative technology selection.” Expert Syst. Appl. 37 (1): 419–425. https://doi.org/10.1016/j.eswa.2009.05.068.
Hu, W. 2008. “Improving construction collaboration performance through supply chain control and management.” In Proc., 2008 Int. Conf. on Information Management, Innovation Management and Industrial Engineering, 58–61. New York: IEEE.
Ishikawa, A., M. Amagasa, T. Shiga, G. Tomizawa, R. Tatsuta, and H. Mieno. 1993. “The max-min Delphi method and fuzzy Delphi method via fuzzy integration.” Fuzzy Sets Syst. 55 (3): 241–253. https://doi.org/10.1016/0165-0114(93)90251-C.
Jang, W.-S., and M. J. Skibniewski. 2009. “Embedded system for construction asset tracking combining radio and ultrasound signals.” J. Comput. Civ. Eng. 23 (4): 221–229. https://doi.org/10.1061/(ASCE)0887-3801(2009)23:4(221).
Jaśkowski, P., A. Sobotka, and A. Czarnigowska. 2018. “Decision model for planning material supply channels in construction.” Autom. Constr. 90 (Jun): 235–242. https://doi.org/10.1016/j.autcon.2018.02.026.
Johnston, J. E. 2016. Site control of materials: Handling, storage and protection. London: Elsevier.
Kasim, N. 2011. “ICT implementation for materials management in construction projects: Case studies.” J. Constr. Eng. Project Manage. 1 (1): 31–36. https://doi.org/10.6106/JCEPM.2011.1.1.031.
Kasim, N. B., C. J. Anumba, and A. R. J. Dainty. 2005. “Improving materials management practices on fast-track construction projects.” In Vol. 2 of Proc., 21st Annual ARCOM Conf., edited by F. Khosrowshahi, 793–802. London: Univ. of London.
Katsela, K., Ş. Güneş, T. Fried, A. Goodchild, and M. Browne. 2022. “Defining urban freight microhubs: A case study analysis.” Sustainability 14 (1): 532. https://doi.org/10.3390/su14010532.
Kong, L., H. Li, H. Luo, L. Ding, and X. Zhang. 2018. “Sustainable performance of just-in-time (JIT) management in time-dependent batch delivery scheduling of precast construction.” J. Cleaner Prod. 193 (Aug): 684–701. https://doi.org/10.1016/j.jclepro.2018.05.037.
Latpate, R. V. 2015. “Fuzzy modified TOPSIS for supplier selection problem in supply chain management.” Int. J. Innovative Res. Comput. Sci. Technol. 3 (4): 22–28.
Lee, C.-H., K.-J. Wu, and M.-L. Tseng. 2018. “Resource management practice through eco-innovation toward sustainable development using qualitative information and quantitative data.” J. Cleaner Prod. 202 (Nov): 120–129. https://doi.org/10.1016/j.jclepro.2018.08.058.
Leung, M. Y., Y.-S. Chan, and P. Olomolaiye. 2008. “Impact of stress on the performance of construction project managers.” J. Constr. Eng. Manage. 134 (8): 644–652. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:8(644).
Lindblad, F., Å. Bolmsvik, J. Pettersson, and S. Wiberg. 2018. “Efficiencies in the on-site material handling process by using radio frequency identification in the wood building construction industry.” Int. J. Innovation Manage. Technol. 9 (Dec): 252–259. https://doi.org/10.18178/ijimt.2018.9.6.821.
Linstone, H. A. 1978. The Delphi technique. Handbook of futures research, 273–300. Westport, CT: Greenwood Press.
Liu, J., Q. Xie, B. Xia, and A. J. Bridge. 2017. “Impact of design risk on the performance of design-build projects.” J. Constr. Eng. Manage. 143 (6): 04017010. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001299.
Lu, H., H. Wang, Y. Xie, and X. Wang. 2018. “Study on construction material allocation policies: A simulation optimization method.” Autom. Constr. 90 (Jun): 201–212. https://doi.org/10.1016/j.autcon.2018.02.012.
Manakandan, S. K., I. Rosnah, R. J. Mohd, and R. Priya. 2017. “Pesticide applicators questionnaire content validation: A fuzzy Delphi method.” Med. J. Malaysia 72 (4): 228–235.
Martin, H., T. M. Lewis, and J. Fifi. 2014. “Centralized versus decentralized construction project structure—Easing communication difficulties.” Int. J. Constr. Manage. 14 (3): 156–170. https://doi.org/10.1080/15623599.2014.922726.
Martin, H., and K. Ramjarrie. 2021. “Cloud contractor selection model for design-build open tender.” J. Constr. Eng. Manage. 147 (4): 04021020. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002016.
Mawdesley, M. J., S. H. Al-Jibouri, and H. Yang. 2002. “Genetic algorithms for construction site layout in project planning.” J. Constr. Eng. Manage. 128 (5): 418–426. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:5(418).
McKenna, H. P. 1994. “The Delphi technique: A worthwhile research approach for nursing?” J. Adv. Nurs. 19 (6): 1221–1225. https://doi.org/10.1111/j.1365-2648.1994.tb01207.x.
Mishra, P., P. Mishra, and R. Purohit. 2018. “Material delivery problems in construction projects: A possible solution.” Mater. Today: Proc. 5 (2): 6497–6501. https://doi.org/10.1016/j.matpr.2018.01.135.
Modig, N. 2007. “The division of responsibility for project supply.” J. Purchasing Supply Manage. 13 (2): 87–97. https://doi.org/10.1016/j.pursup.2007.05.001.
Mullen, P. M. 2003. “Delphi: Myths and reality.” J. Health Org. Manage. 17 (1): 37–52. https://doi.org/10.1108/14777260310469319.
Naoum, S. G. 2016. “Factors influencing labor productivity on construction sites: A state-of-the-art literature review and a survey.” Int. J. Productivity Perform. Manage. 65 (3): 401–421. https://doi.org/10.1108/IJPPM-03-2015-0045.
Navon, R., and O. Berkovich. 2006. “An automated model for materials management and control.” Construct. Manage. Econ. 24 (6): 635–646. https://doi.org/10.1080/01446190500435671.
Ngniatedema, T., L. A. Fono, and G. D. Mbondo. 2015. “A delayed product customization cost model with supplier delivery performance.” Eur. J. Oper. Res. 243 (1): 109–119. https://doi.org/10.1016/j.ejor.2014.11.017.
O’Brien, W. J. 1999. “Construction supply-chain management: A vision for advanced coordination, costing, and control.” In Proc., NSF Berkeley-Stanford Construction Research Workshop. Stanford, CA: Stanford Univ.
Ocampo, L., J. A. Ebisa, J. Ombe, and M. G. Escoto. 2018. “Sustainable ecotourism indicators with fuzzy Delphi method—A Philippine perspective.” Ecol. Indic. 93 (Oct): 874–888. https://doi.org/10.1016/j.ecolind.2018.05.060.
Ojo, E., C. Mbowa, and E. T. Akinlabi. 2014. “Barriers in implementing green supply chain management in construction.” In Proc., Int. Conf. on Industrial Engineering and Operations Management, 1974–1981. Southfield, MI: Industrial Engineering and Operations Management Society.
Padilla-Rivera, A., B. B. T. do Carmo, G. Arcese, and N. Merveille. 2021. “Social circular economy indicators: Selection through fuzzy Delphi method.” Sustainable Prod. Consumption 26 (Apr): 101–110. https://doi.org/10.1016/j.spc.2020.09.015.
Pande, A. A., and S. Sabihuddin. 2015. “Study of material management techniques on construction project.” J. Constr. Eng. Technol. Manage. 5 (2): 22–27.
Pannucci, C. J., and E. G. Wilkins. 2010. “Identifying and avoiding bias in research.” Plast. Reconstructive Surg. 126 (2): 619. https://doi.org/10.1097/PRS.0b013e3181de24bc.
Pansiri, J. 2005. “Pragmatism: A methodological approach to researching strategic alliances in tourism.” Tourism Hospitality Plann. Dev. 2 (3): 191–206. https://doi.org/10.1080/14790530500399333.
Papadopoulos, G. A., N. Zamer, S. P. Gayialis, and I. P. Tatsiopoulos. 2016. “Supply chain improvement in construction industry.” Univ. J. Manage. 4 (10): 528–534. https://doi.org/10.13189/ujm.2016.041002.
Pattanayak, R. M., H. S. Behera, and S. Panigrahi. 2021. “A novel probabilistic intuitionistic fuzzy set based model for high order fuzzy time series forecasting.” Eng. Appl. Artif. Intell. 99 (Mar): 104136. https://doi.org/10.1016/j.engappai.2020.104136.
Payne, A. C., J. V. Chelsom, and L. R. Reavill. 1996. An introduction to management for engineers. New York: Wiley.
Perçin, S. 2018. “Evaluating airline service quality using a combined fuzzy decision-making approach.” J. Air Transp. Manage. 68 (May): 48–60. https://doi.org/10.1016/j.jairtraman.2017.07.004.
Peters, E., K. Subar, and H. Martin. 2019. “Late payment and nonpayment within the construction industry: Causes, effects, and solutions.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 11 (3): 04519013. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000314.
Pheng, L. S., S. Gao, and J. L. Lin. 2015. “Converging early contractor involvement (ECI) and lean construction practices for productivity enhancement: Some preliminary findings from Singapore.” Int. J. Productivity Perform. Manage. 64 (6): 831–852. https://doi.org/10.1108/IJPPM-02-2014-0018.
Rahman, M. M., Y. H. Yap, N. Ramli, M. Dullah, and M. Shamsuddin. 2017. “Causes of shortage and delay in material supply: A preliminary study.” In Proc., IOP Conf. Series: Materials Science and Engineering, 012037. Bristol, UK: IOP Publishing.
Ramya, R., and K. Viswanathan. 2019. “A study report on material management in construction industry.” Int. J. Intellectual Advancements Res. Eng. Comput. 7 (2): 1990–1994.
Rowe, G., G. Wright, and F. Bolger. 1991. “Delphi: A reevaluation of research and theory.” Technol. Forecasting Soc. Change 39 (3): 235–251. https://doi.org/10.1016/0040-1625(91)90039-I.
Roy, T. K., and A. Garai. 2012. “Intuitionistic fuzzy Delphi method: More realistic and interactive forecasting tool.” Notes Intuitionistic Fuzzy Sets 18 (2): 37–50.
Said, H., and K. El-Rayes. 2013. “Optimal utilization of interior building spaces for material procurement and storage in congested construction sites.” Autom. Constr. 31 (May): 292–306. https://doi.org/10.1016/j.autcon.2012.12.010.
San Cristóbal, J. R., L. Carral, E. Diaz, J. A. Fraguela, and G. Iglesias. 2018. “Complexity and project management: A general overview.” Complexity 2018: 1–10. https://doi.org/10.1155/2018/4891286.
Schmidt, R. C. 1997. “Managing Delphi surveys using nonparametric statistical techniques.” Decis. Sci. 28 (3): 763–774. https://doi.org/10.1111/j.1540-5915.1997.tb01330.x.
Shehab, T., O. Moselhi, and E. Nasr. 2009. “Barcode-assisted system for document management of construction projects.” Int. J. Constr. Educ. Res. 5 (1): 45–60. https://doi.org/10.1080/15578770902717592.
Sinha, I. P., R. L. Smyth, and P. R. Williamson. 2011. “Using the Delphi technique to determine which outcomes to measure in clinical trials: Recommendations for the future based on a systematic review of existing studies.” PLoS Med 8 (1): e1000393. https://doi.org/10.1371/journal.pmed.1000393.
Soltani, A., and T. Fernando. 2004. “A fuzzy based multi-objective path planning of construction sites.” Autom. Constr. 13 (6): 717–734. https://doi.org/10.1016/j.autcon.2004.04.012.
Songer, A. D., and K. R. Molenaar. 1997. “Project characteristics for successful public-sector design-build.” J. Constr. Eng. Manage. 123 (1): 34–40. https://doi.org/10.1061/(ASCE)0733-9364(1997)123:1(34).
Spillane, J. P., and L. O. Oyedele. 2017. “Effective material logistics in urban construction sites: A structural equation model.” Constr. Innovation. 17 (4): 406–428. https://doi.org/10.1108/CI-11-2015-0063.
Spillane, J. P., L. O. Oyedele, J. K. von Meding, A. Konanahalli, B. E. Jaiyeoba, and I. K. Tijani. 2011. “Challenges of UK/Irish contractors regarding material management and logistics in confined site construction.” Int. J. Constr. Supply Chain Manage. 1 (1): 25–42. https://doi.org/10.14424/ijcscm101011-25-42.
Tedla, Y., and D. Patel. 2018. “Improving effective material management by identifying common factors in building construction project.” Int. Res. J. Eng. Technol. 5 (1): 146–150.
Tezel, A., P. Febrero, E. Papadonikolaki, and I. Yitmen. 2021. “Insights into blockchain implementation in construction: Models for supply chain management.” J. Manage. Eng. 37 (4): 04021038. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000939.
Thomas, H. R., D. R. Riley, and J. I. Messner. 2005. “Fundamental principles of site material management.” J. Constr. Eng. Manage. 131 (7): 808–815. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:7(808).
Thunberg, M., M. Rudberg, and T. K. Gustavsson. 2014. “Identifying and positioning construction supply chain planning problems.” In Proc., 30th Annual ARCOM Conf., edited by A. B. Raiden and E. Aboagye-Nimo, 1069–1078. Portsmouth, UK: Association of Researchers in Construction Management.
Thunberg, M., M. Rudberg, and T. K. Gustavsson. 2017. “Categorising on-site problems: A supply chain management perspective on construction projects.” Constr. Innovation 17 (1): 90–111. https://doi.org/10.1108/CI-10-2015-0059.
Tian, F. 2016. “An agri-food supply chain traceability system for China based on RFID & blockchain technology.” In Proc., 2016 13th Int. Conf. on Service Systems and Service Management (ICSSSM), 1–6. New York: IEEE.
Tsai, T.-C., and M.-L. Yang. 2010. “Risk assessment of design-bid-build and design-build building projects.” J. Oper. Res. Soc. Japan 53 (1): 20–39. https://doi.org/10.15807/jorsj.53.20.
Wang, Z., T. Wang, H. Hu, J. Gong, X. Ren, and Q. Xiao. 2020. “Blockchain-based framework for improving supply chain traceability and information sharing in precast construction.” Autom. Constr. 111 (Mar): 103063. https://doi.org/10.1016/j.autcon.2019.103063.
Waste and Resource Action Plan. 2007. Current practices and future potential in modern methods of construction. Banbury, UK: Waste and Resources Action Plan.
Whitlock, K., F. H. Abanda, M. B. Manjia, C. Pettang, and G. E. Nkeng. 2021. “4D BIM for construction logistics management.” Civ. Eng. 2 (2): 325–348. https://doi.org/10.3390/civileng2020018.
Wood, H., and P. Ashton. 2010. “The factors of project complexity.” In Proc., CIB World Building Congress, 69–80. Salford, UK: CIB.
Wuni, I. Y., and G. Q. Shen. 2020. “Barriers to the adoption of modular integrated construction: Systematic review and meta-analysis, integrated conceptual framework, and strategies.” J. Cleaner Prod. 249 (Mar): 119347. https://doi.org/10.1016/j.jclepro.2019.119347.
Xia, B., and A. P. C. Chan. 2010. “Key competences of design-build clients in China.” J. Facil. Manage. 8 (2): 114–129. https://doi.org/10.1108/14725961011041161.
Xia, B., Q. Chen, Y. Xu, M. Li, and X. Jin. 2015. “Design-build contractor selection for public sustainable buildings.” J. Manage. Eng. 31 (5): 04014070. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000295.
Xie, C., D. Wu, J. Luo, and X. Hu. 2010. “A case study of multi-team communications in construction design under supply chain partnering.” Supply Chain Manage. 15 (5): 363–370. https://doi.org/10.1108/13598541011068279.
Xu, X., Y. Zhao, and C.-Y. Chen. 2016. “Project-driven supply chains: Integrating safety-stock and crashing decisions for recurrent projects.” Ann. Oper. Res. 241 (1): 225–247. https://doi.org/10.1007/s10479-012-1240-0.
Ye, G., Z. Jin, B. Xia, and M. Skitmore. 2015. “Analyzing causes for reworks in construction projects in China.” J. Manage. Eng. 31 (6): 04014097. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000347.
Zakeri, M., P. O. Olomolaiye, G. D. Holt, and F. C. Harris. 1996. “A survey of constraints on Iranian construction operatives’ productivity.” Construct. Manage. Econ. 14 (5): 417–426. https://doi.org/10.1080/014461996373287.
Zeb, A., S. Malik, S. Nauman, H. Hanif, and O. Amin. 2015. “Factors affecting material procurement, supply and management in building projects of Pakistan: A contractor’s perspective.” In Proc., Int. Conf. on Innovations in Civil and Structural Engineering (ICICSE’15), 170–175. Istanbul, Turkey: Universal Researchers in Science and Technology.
Zhao, X., B.-G. Hwang, and S. P. Low. 2013. “Critical success factors for enterprise risk management in Chinese construction companies.” Construct. Manage. Econ. 31 (12): 1199–1214. https://doi.org/10.1080/01446193.2013.867521.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 148Issue 8August 2022

History

Received: Aug 11, 2021
Accepted: Apr 5, 2022
Published online: Jun 3, 2022
Published in print: Aug 1, 2022
Discussion open until: Nov 3, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Ryan Heaton [email protected]
Dept. of the Built Environment, Liverpool John Moores Univ., Liverpool L3 3AF, UK. Email: [email protected]
Lecturer, Queens Univ., Belfast BT9 5AG, Northern Ireland, UK (corresponding author). ORCID: https://orcid.org/0000-0001-8474-6712. Email: [email protected]
Lecturer, Dept. of Civil and Environmental Engineering, Univ. of the West Indies, St. Augustine, Trinidad. ORCID: https://orcid.org/0000-0003-3129-2424. Email: [email protected]
Amrita Milling [email protected]
Ph.D. Candidate, Dept. of Civil Engineering, Queens Univ., Belfast BT9 5AG, Northern Ireland, UK. Email: [email protected]
Senior Lecturer, Dept. of the Built Environment, Liverpool John Moores Univ., Liverpool L3 3AF, UK. Email: [email protected]
Fiona Borthwick [email protected]
Senior Lecturer, Dept. of the Built Environment, Liverpool John Moores Univ., Liverpool L3 3AF, UK. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • A Comprehensive Review of Integration Management Components in Construction Management, Construction Research Congress 2024, 10.1061/9780784485286.072, (722-729), (2024).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share