Making the Management of a Project Successful: Case of Construction Projects in Developing Countries

Publication: Journal of Construction Engineering and Management
Volume 147, Issue 12

Abstract

Many developing countries (DCs) are currently spending on construction projects due to the high demand resulting from rapid urbanization. However, the results of these projects in terms of time, cost, and quality do not tend to meet the expectations of the stakeholders. Despite the relevance and high visibility of this situation in many DCs, this topic has received little research attention. This study examines the combined effect of six factors that are commonly signaled in the project management literature as determinants of successful project management in construction projects. Our ultimate goal is to identify the extent to which traditional factors play a role in project management in DCs because recent studies have highlighted the uniqueness of project management in these countries, therefore requiring specific analysis within this context. To empirically address this goal, we rely on an ad-hoc survey that collected the responses from 120 project management practitioners in Ghana. First, building upon existing works, we construct and validate a scale that evaluates project management practices in DCs. Next, we use qualitative comparative analysis to scrutinize which combinations of the aforementioned six factors lead to successful project management in construction projects. The findings support the initial intuition about the existence of distinct pathways, suggesting that there is no unique formula, but that different situations (i.e., combinations of factors) might require the adoption of diverse project management practices. The primary contribution of this research stems from adding to the project management body of knowledge the understanding of how a combination of factors can assist construction engineers and project managers to plan and implement successful construction projects in DCs.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All the data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

Acknowledgments

This paper was written using responses from members of the Project Management Institute and other project management experts in Ghana. The authors are grateful to them.

References

Ahadzie, D., E. Kissi, and T. Adjei-Kumi. 2012. “The status of project management practices in the Ghanaian construction industry.” Int. J. Project Plann. Finance 3 (1): 123–135.
Ahadzie, D. K., and K. Amoa-Mensah. 2010. “Management practices in the Ghanaian house building industry.” J. Sci. Technol. 30 (2): 62–75. https://doi.org/10.4314/just.v30i2.60533.
Ahmed, R., and N. A. Mohamad. 2016. “Exploring the relationship between multi-dimensional top management support and project success: An international study.” Eng. Manage. J. 28 (1): 54–67. https://doi.org/10.1080/10429247.2015.1136525.
Alashwal, A. M., N. F. Fareed, and K. M. Al-Obaidi. 2017. “Determining success criteria and success factors for international construction projects for Malaysian contractors.” Constr. Econ. Build. 17 (2): 62–80. https://doi.org/10.5130/AJCEB.v17i2.5319.
Alias, Z., E. M. Zawawi, K. Yusof, and N. M. Aris. 2014. “Determining critical success factors of project management practice: A conceptual framework.” Procedia Social Behav. Sci. 153 (Oct): 61–69. https://doi.org/10.1016/j.sbspro.2014.10.041.
Alrik, T., and A. Duşa. 2013. Qualitative comparative analysis with R. A user’s guide. New York: Springer.
Amoako, I. S., and F. Lyon. 2014. “We don’t deal with courts: Cooperation and alternative institutions shaping exporting relations of small and medium-sized enterprise in Ghana.” Internal Small Bus. J. 32 (2): 117–139. https://doi.org/10.1177/0266242613484778.
Amoatey, C. T., Y. A. Ameyaw, E. Adaku, and S. Famiyeh. 2015. “Analysing delay causes and effects in Ghanaian state housing construction projects.” Int. J. Managing Projects Bus. 8 (1): 198–214. https://doi.org/10.1108/IJMPB-04-2014-0035.
Amponsah, R. 2010. “Improving project management practice in Ghana with focus on agriculture, banking and construction sectors of the Ghanaian economy.” Ph.D. thesis. School of Property, Construction, and Project Management, RMIT Univ.
Asunka, J. 2016. “Partisanship and political accountability in new democracies: Explaining compliance with formal rules and procedures in Ghana.” Res. Politics 3 (1): 7–9. https://doi.org/10.1177/2053168016633907.
Belassi, W., and O. I. Tukel. 1996. “A new framework for determining critical success/failure factors in projects.” Int. J. Project Manage. 14 (3): 141–151. https://doi.org/10.1016/0263-7863(95)00064-X.
Beleiu, I., E. Crisan, and R. Nistor. 2015. “Main factors influencing project success.” Interdiscip. Manage. Res. 11 (1): 59–72.
Belout, A., and C. Gauvreau. 2004. “Factors influencing project success: The impact of human resource management.” Int. J. Project Manage. 22 (1): 1–11. https://doi.org/10.1016/S0263-7863(03)00003-6.
Besner, C., and B. Hobbs. 2006. “The project management tools and techniques: The portrait of current professional practice.” Project Manage. J. 37 (3): 37–48. https://doi.org/10.1177/875697280603700305.
Bokor, M. J. K. 2011. “The dirty politics of development project hurts.” Accessed March 5, 2020. https://www.ghanaweb.com/GhanaHomePage/features/artikel.php?ID=215290.
Bond-Barnard, T. J., L. Fletcher, and H. Steyn. 2018. “Linking trust and collaboration in project teams to project management success.” Int. J. Managing Projects Bus. 11 (2): 432–457. https://doi.org/10.1108/IJMPB-06-2017-0068.
Budget of the Republic of Ghana. 2019. “Budget highlights: A stronger economy for jobs and prosperity.” Accessed February 18, 2020. https://www.pwc.com/gh/en/assets/pdf/2019-budget-highlights.pdf.
Chan, A. P. C., D. Scott, and A. P. L. Chan. 2004. “Factors affecting the success of a construction project.” J. Constr. Eng. Manage. 130 (1): 153–155. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:1(153).
Chau, N. D., L. Long, and D. L. Young. 2012. “Critical success factors of large design-build projects in Vietnam.” J. Constr. Eng. Project Manage. 2 (3): 30–39. https://doi.org/10.6106/JCEPM.2012.2.3.030.
Chen, Y. Q., Y. B. Zhang, J. Y. Liu, and P. Mo. 2012. “Interrelationships among critical success factors of construction projects based on the structural equation model.” J. Manage. Eng. 28 (3): 243–251. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000104.
Choi, Y. J. 2009. “Application of fuzzy-set theory in social sciences.” J. Governmental Stud. 15 (3): 307–336.
Ciccotti, K. 2014. “The human factor in project management.” In Proc., PMI® Global Congress 2014—North America. Newtown Square, PA: Project Management Institute.
Cleland, D. I., and R. Gareis. 2006. Global project management handbook: Planning, organizing and controlling international projects. 2nd ed. New York: McGraw-Hill.
Cserháti, G., and L. Szabó. 2014. “The relationship between success criteria and success factors in organizational event projects.” Int. J. Project Manage. 32 (4): 613–624. https://doi.org/10.1016/j.ijproman.2013.08.008.
Damoah, I. S., and C. Akwei. 2017. “Government project failure in Ghana: A multidimensional approach.” Int. J. Managing Projects Bus. 10 (1): 32–59. https://doi.org/10.1108/IJMPB-02-2016-0017.
Damoah, I. S., and D. K. Kumi. 2018. “Causes of government construction projects failure in an emerging economy: Evidence from Ghana.” Int. J. Managing Projects Bus. 11 (3): 558–582. https://doi.org/10.1108/IJMPB-04-2017-0042.
Dang, C. N., L. Le-Hoai, and Y. D. Lee. 2012. “Critical success factors of large design-build projects in Vietnam.” KICEM J. Constr. Eng. Manage. 2 (3): 30–39. https://doi.org/10.6106/JCEPM.2012.2.3.030.
Darko, E., and A. Löwe. 2016. Ghana’s construction sector and youth employment. London: Overseas Development Institute.
De Wit, A. 1988. “Measurement of project success.” Int. J. Project Manage. 6 (3): 164–170. https://doi.org/10.1016/0263-7863(88)90043-9.
Dissanayaka, S. M., and M. M. Kumaraswamy. 1999. “Evaluation of factors affecting time and cost performance in Hong Kong building projects.” Eng. Constr. Archit. Manage. 6 (3): 287–298. https://doi.org/10.1108/eb021119.
Doloi, H., and M. Y. Lim. 2007. “Measuring performance in construction projects—A critical analysis with an Australian perspective.” In Proc., Construction and Building Research Conf. of the Royal Institute of Chartered Surveyors. London: Royal Institute of Chartered Surveyors.
Fiss, P. C. 2011. “Building better causal theories: A fuzzy set approach to typologies in organization research.” Acad. Manage. J. 54 (2): 393–420. https://doi.org/10.5465/amj.2011.60263120.
Fornell, C., and D. F. Larcker. 1981. “Evaluating structural equation models with unobservable variables and measurement error.” J. Marketing Res. 18 (1): 39–50. https://doi.org/10.1177/002224378101800104.
Fortune, J., and D. White. 2006. “Framing of project critical success factors by a systems model.” Int. J. Project Manage. 24 (1): 53–65. https://doi.org/10.1016/j.ijproman.2005.07.004.
Frefer, A. A., M. Mahmoud, H. Haleema, and R. Almamlook. 2018. “Overview success criteria and critical success factors in project management.” Ind. Eng. Manage. 7 (10): 244. https://doi.org/10.4172/2169-0316.1000244.
Fugar, F. D. K., and A. B. Agyarkwa. 2010. “Delays in building construction in Ghana.” Aust. J. Constr. Econ. Build. 10 (1–2): 103–116. https://doi.org/10.5130/ajceb.v10i1/2.1592.
Gudienė, N., A. Banaitis, and N. Banaitienė. 2013. “Evaluation of critical success factors for construction projects: An empirical study in Lithuania.” Int. J. Strategic Property Manage. 17 (1): 21–31. https://doi.org/10.3846/1648715X.2013.787128.
Hair, J. F., W. C. Black, B. J. Babin, and R. E. Anderson. 2010. Multivariate data analysis. 7th ed. New York: Pearson.
Hassan, A. Q. 1995. “Don’t burn that bridge.” J. Manage. Eng. 11 (6): 22. https://doi.org/10.1061/(ASCE)0742-597X(1995)11:6(22).
Hwang, B. G., and E. J. Lim. 2013. “Critical success factors for key project players and objectives: Case study of Singapore.” J. Constr. Eng. Manage. 139 (2): 204–215. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000597.
Ihuah, P. W., I. I. Kakulu, and D. Eaton. 2014. “A review of critical project management success factors for sustainable social housing in Nigeria.” Int. J. Sustainable Built Environ. 3 (1): 62–71. https://doi.org/10.1016/j.ijsbe.2014.08.001.
Jelodar, M. B., T. W. Yiu, and S. Wilkinson. 2016. “A conceptualisation of relationship quality in construction procurement.” Int. J. Project Manage. 34 (6): 997–1011. https://doi.org/10.1016/j.ijproman.2016.03.005.
Jenkins, Q. C., and A. Wallace. 2016. Construction bonds: What every contractor and owner should know. Vancouver, Canada: Jenkins Marzban Logan LLP Lawyers.
Jugdev, K., and R. Muller. 2005. “A retrospective look at our evolving understanding of project success.” Project Manage. J. 36 (4): 19–31. https://doi.org/10.1177/875697280503600403.
Kaiser, H. F. 1960. “The application of electronic computers to factor analysis.” Educ. Psychol. Meas. 20 (1): 141–151. https://doi.org/10.1177/001316446002000116.
Kandelousi, N. S., J. Ooi, and A. Abdollahi. 2011. “Key success factors for managing projects international.” J. Econ. Manage. Eng. 5 (1): 11–23.
Khang, D. B., and T. L. Moe. 2008. “Success criteria and factors for international development projects: A life-cycle-based framework.” Project Manage. J. 39 (1): 72–84. https://doi.org/10.1002/pmj.20034.
Kissi, E., D. K. Ahadzie, and E. Badu. 2015. “Strategies for improving professional project management practices in the Ghanaian construction industry.” NICMAR-J. Constr. Manage. 30 (2): 5–9.
Konadu-Agyemang, K. 2001. “A survey of housing conditions and characteristics in Accra, an African city.” Habitat Int. 25 (1): 15–34. https://doi.org/10.1016/S0197-3975(00)00016-3.
Ladhari, R. 2012. “The lodging quality index: An independent assessment of validity and dimensions.” Int. J. Contemp. Hospitality Manage. 24 (4): 628–652. https://doi.org/10.1108/09596111211217914.
Lapinski, A., M. Horman, and D. Riley. 2006. “Lean processes for sustainable project delivery.” J. Constr. Eng. Manage. 132 (10): 1083–1091. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:10(1083).
Lester, A. 2007. Project management: Planning and control. New York: Elsevier.
Ling, F. Y., S. P. Low, S. Wang, and T. Egbelakin. 2008. “Models for predicting project performance in China using project management practices adopted by foreign AEC firms.” J. Constr. Eng. Manage. 134 (12): 983–990. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:12(983).
Liu, Y. W., G. F. Zhou, and S. Q. Wang. 2010. “Many hands, much politics, multiple risks: The case of the 2008 Beijing Olympics stadium.” Aust. J. Public Admin. 69 (Mar): S85–S98. https://doi.org/10.1111/j.1467-8500.2009.00661.x.
Lova, A., P. Tormos, M. Cervantes, and F. Barber. 2009. “An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes.” Int. J. Prod. Econ. 117 (2): 302–316. https://doi.org/10.1016/j.ijpe.2008.11.002.
Malhotra, N. K. 1999. Marketing research: An applied orientation. London: Prentice-Hall International.
Meyer, A. D., A. S. Tsui, and C. R. Hinings. 1993. “Configurational approaches to organizational analysis.” Acad. Manage. J. 36 (6): 1175–1195. https://doi.org/10.5465/256809.
Molenaar, K. R., and A. D. Songer. 1998. “Model for public sector design-build project selection.” J. Constr. Eng. Manage. 124 (6): 467–479. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:6(467).
Nguyen, L. D., S. O. Oguniana, and D. T. Xuan Lan. 2004. “A study on project success factors in large construction projects in Vietnam.” Eng. Constr. Archit. Manage. 11 (6): 404–413. https://doi.org/10.1108/09699980410570166.
Nunnally, J. C., and I. H. Bernstein. 1994. Psychometric theory. New York: McGraw-Hill.
Odeh, A. M., and H. T. Battaineh. 2002. “Causes of construction delays: Traditional contracts.” Int. J. Project Manage. 20 (1): 67–73. https://doi.org/10.1016/S0263-7863(00)00037-5.
Ofer, Z. 2007. “Top management involvement in project management.” Int. J. Managing Projects Bus. 1 (3): 387–403. https://doi.org/10.1108/17538370810883837.
Ofori, D. F. 2013. “Project management practices and critical success factors: A developing country perspective.” Int. J. Bus. Manage. 8 (21): 14–31. https://doi.org/10.5539/ijbm.v8n21p14.
Ofori-Kuragu, J. K., D. Owusu-Manu, and J. Ayarkwa. 2016. “The case for the Construction Industry Council, Ghana.” J. Constr. Dev. Countries 21 (2): 131–149. https://doi.org/10.21315/jcdc2016.21.2.7.
Ojiako, U., and M. Chipulu. 2014. “National culture and perceptions of success and failure in projects.” Manage. Procure. Law 167 (4): 168–169. https://doi.org/10.1680/mpal.13.00027.
Owusu-Ansah, M., and L. Louw. 2019. “The influence of national culture on organizational culture of multinational companies.” Cogent Soc. Sci. 5 (1): 162–364. https://doi.org/10.1080/23311886.2019.1623648.
Oxford Business Group. 2019. “Construction & real estate.” Accessed April 9, 2020. https://oxfordbusinessgroup.com/ghana-2019/construction-real-estate.
Pallant, J. 2010. SPSS survival manual: A step by step guide to data analysis using the SPSS program. 4th ed. New York: McGraw-Hill.
Phua, F. T. T. 2004. “Modelling the determinants of multi-firm project success: A grounded exploration of differing participant perspectives.” Constr. Manage. Econ. 22 (5): 451–459. https://doi.org/10.1080/0144619042000190243.
Pinto, J. K., and D. P. Slevin. 1989. “Critical success factors in R&D projects.” Res. Technol. Manage. 32 (1): 31–35. https://doi.org/10.1080/08956308.1989.11670572.
Project Management Institute. 2017. A guide to the project management body of knowledge (PMBOK® guide). 6th ed. Newtown Square, PA: Project Management Institute.
Pugh, C. 2001. “The theory and practice of housing sector development for developing countries.” Housing Stud. 16 (4): 399–423. https://doi.org/10.1080/02673030120066527.
Radujkovića, M., and M. Sjekavicab. 2017. “Project management success factors.” Procedia Eng. 196 (2017): 607–615.
Ragin, C. C. 2008. Redesigning social inquiry: Fuzzy sets and beyond. Chicago: Univ. of Chicago Press.
Rasul, I., and D. Rogger. 2016. “Management of bureaucrats and public service delivery: Evidence from the Nigerian civil service.” Econ. J. 128 (1): 7–9.
Rodney, T., M. Ralf, and D. Vic. 2009. “Comparing the leadership styles of functional and project managers.” Int. J. Managing Projects Bus. 2 (2): 198–216. https://doi.org/10.1108/17538370910949266.
Salam, M. A., M. Ali, and K. A. S. Kan. 2017. “Analyzing supply chain uncertainty to deliver sustainable operational performance: Symmetrical and asymmetrical modeling approaches.” Sustainability 9 (12): 2217. https://doi.org/10.3390/su9122217.
Sanvido, V., F. Grobler, K. Parfitt, M. Guvenis, and M. Coyle. 1992. “Critical success factors for construction projects.” J. Constr. Eng. Manage. 118 (1): 94–111. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:1(94).
Schneider, C. Q., and C. Wagemann. 2012. Set-theoretic methods for the social sciences: A guide to qualitative comparative analysis. Cambridge, UK: Cambridge University Press.
Shokri-Ghasabeh, M., and K. Kavousi-Chabok. 2009. “Generic project success and project management success criteria and factors: Literature review and survey.” WSEAS Trans. Bus. Econ. 8 (6): 56–59.
Songer, A. D., and K. R. Molenaar. 1997. “Project characteristics for successful public-sector design-build.” J. Constr. Procur. 123 (1): 34–40. https://doi.org/10.1061/(ASCE)0733-9364(1997)123:1(34).
Transparency International. 2015. “Corruption perception index.” Accessed June 24, 2020. https://www.transparency.org/cpi2015#results-table.
Venter, F. 2005. “Project management in Ghana: Expectations, realities and barriers to use.” J. Transdiscip. Res. Southern Afr. 1 (1): 20–96. https://doi.org/10.4102/td.v1i1.305.
Walker, D., and Y. Shen. 2002. “Project understanding, planning, flexibility of management action and construction time performance: Two Australian case studies.” Constr. Manage. Econ. 20 (1): 31–44. https://doi.org/10.1080/01446190110089691.
White, D., and J. Fortune. 2002. “Current practice in project management: An empirical study.” Int. J. Project Manage. 20 (1): 1–11. https://doi.org/10.1016/S0263-7863(00)00029-6.
Williams, T. 2016. “Identifying success factors in construction projects: A case study.” Project Manage. J. 47 (1): 97–112. https://doi.org/10.1002/pmj.21558.
Wolfinbarger, M., and M. C. Gilly. 2003. “eTailQ: Dimensionalizing, measuring and predicting retail quality.” J. Retailing 79 (3): 183–198. https://doi.org/10.1016/S0022-4359(03)00034-4.
Yanwen, W. 2012. “The study on complex project management in developing countries.” Procedia 25 (2012): 1547–1552. https://doi.org/10.1016/j.phpro.2012.03.274.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 147Issue 12December 2021

History

Received: Feb 20, 2021
Accepted: Aug 5, 2021
Published online: Sep 22, 2021
Published in print: Dec 1, 2021
Discussion open until: Feb 22, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Lecturer, Faculty of IT Business, Ghana Communication Technology Univ., Takoradi Campus, P.O. Box MC 3262, Takoradi, Ghana (corresponding author). ORCID: https://orcid.org/0000-0003-2621-7040. Email: [email protected]
Associate Professor, Dept. of Economy and Business Organization, Universitat Internacional de Catalunya, C/Immaculada, 22, Barcelona 08017, Spain. ORCID: https://orcid.org/0000-0001-5145-2179. Email: [email protected]
Full Professor, Dept. of Economy and Business Organization, Universitat Internacional de Catalunya, C/Immaculada, 22, Barcelona 08017, Spain. ORCID: https://orcid.org/0000-0002-5572-7341. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Identifying Construction Managers’ Challenges: A Novel Approach Based on Social Network Analysis, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-13771, 150, 1, (2024).
  • Success factors for dam engineering industry: systematic literature review and conceptual classification, Innovative Infrastructure Solutions, 10.1007/s41062-022-01022-4, 8, 1, (2023).
  • The Conditional Configuration Path for Private Enterprises Participating in PPP: A Fuzzy-Set Qualitative Comparative Analysis, Buildings, 10.3390/buildings12040440, 12, 4, (440), (2022).
  • Key Factors Employers Look for In Hiring Construction Managers for Public and Private Construction Projects, International Journal of Scientific Research in Science and Technology, 10.32628/IJSRST229589, (516-545), (2022).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share