Assessment of Readability Risks in Contracts Causing Conflicts in Construction Projects

Publication: Journal of Construction Engineering and Management
Volume 147, Issue 6

Abstract

Readability and comprehensibility of contracts are important. A contract would be more practical and functional if the clauses can be interpreted more consistently. Therefore, an analysis of risks influencing readability of construction contracts other than the more common approach of analyzing operational risk is essential. This paper aims to assess risk factors affecting readability of contracts to avoid or minimize conflicts among project parties by adopting a fuzzy Visekriterijumska Optimizacija I Kompromisno Resenje (VIKOR) technique. Readability risks were analyzed based on conflicting potential interpretations of clauses on time, cost, and quality criteria. The results identified the top three risks as: (1) unnecessary complexity in using nouns and improper use of referents; (2) the use of abstract and ambiguous words or sentences leading to multiple interpretations; and (3) unnecessarily long sentence length. To establish consensus among experts, compare stakeholders’ perceptions, and ensure the robustness of the model, interrater agreement (IRA) analysis, Mann-Whitney U test, and sensitivity analysis were performed. The findings can help contract drafters recognize the importance of the role of readability of contracts. Improved readability can potentially lead to reduced conflicts, claims, and disputes in construction projects.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data (i.e., questionnaire survey data) that support the findings of this study are available from the corresponding author upon reasonable request.

Acknowledgments

The work described in this paper was supported by the Coordinatorship of Scientific Research Projects of the Yildiz Technical University (Project ID: FBA-2020-3934).

References

Abdul-Malak, M. A. U., and J. M. K. Hamie. 2019. “Proposed framework for the rendering of construction contract document interpretations by engineering professionals.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 11 (3): 04519016. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000305.
Abotaleb, I. S., I. H. El-Adaway, M. W. Ibrahim, A. S. Hanna, and J. S. Russell. 2019a. “Causes, early warning signs, and impacts of out-of-sequence construction: Expert-based survey analysis.” J. Manage. Eng. 35 (6): 04019030. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000724.
Abotaleb, I. S., I. H. El-Adaway, and M. B. Moussa. 2019b. “Guidelines for administrating and drafting nonpayment owners’ obligation provisions under design-build contracts.” J. Manage. Eng. 35 (4): 04019010. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000693.
Al-Humaidi, H. M. 2016. “Construction projects bid or not bid approach using the fuzzy technique for order preference by similarity FTOPSIS method.” J. Constr. Eng. Manage. 142 (12): 04016068. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001180.
Ameer Ali, N. A. N. 2008. “Modern plain English drafting and construction: The Malaysian subcontract model terms.” Soc. Constr. Law 90 (1): 1–67.
Ameer Ali, N. A. N., and S. Wilkinson. 2010. “Modernising construction contracts drafting—A plea for good sense.” In Proc., W113—Special Track 18th CIB World Building Congress, 323–345. Rotterdam, Netherlands: CIB Publication.
Arcadis. 2020. Collaborating to achieve project excellence. Amsterdam, Netherlands: Arcadis.
Artan Ilter, D., and G. Bakioglu. 2018. “Modeling the relationship between risk and dispute in subcontractor contracts.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 10 (1): 04517022. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000246.
Azouz, M., and J. Kim. 2015. “Examining contemporary issues for green buildings from contractors’ perspectives.” Procedia Eng. 118: 470–478. https://doi.org/10.1016/j.proeng.2015.08.451.
Badalpur, M., and A. Hafezalkotob. 2015. “Methodology based on MCDM for risk management in EPC projects: A case study of LPG storage tanks construction.” J. Ind. Syst. Eng. 8 (3): 1–23.
Beaumont, B. 2009. “Dispute resolution in NEC3—User unfriendly?” Constr. Law J. 25 (8): 591–613.
Behrouz, M., and F. Fegh-Hi. 2017. “Prioritize factors affecting the high-tech industry investment in East Azerbaijan province using prioritization techniques VIKOR.” Int. Rev. 1 (1–2): 133–142. https://doi.org/10.5937/intrev1702133B.
Benjamin, R. G. 2012. “Reconstructing readability: Recent developments and recommendations in the analysis of text difficulty.” Educ. Psychol. Rev. 24 (1): 63–88. https://doi.org/10.1007/s10648-011-9181-8.
Besaiso, H., P. Fenn, M. Emsley, and D. Wright. 2018. “A comparison of the suitability of FIDIC and NEC conditions of contract in Palestine: A perspective from the industry.” Eng. Constr. Archit. Manage. 25 (2): 241–256. https://doi.org/10.1108/ECAM-10-2016-0235.
Bottani, E., and A. Rizzi. 2006. “A fuzzy TOPSIS methodology to support outsourcing of logistics services.” Supply Chain Manage. 11 (4): 294–308. https://doi.org/10.1108/13598540610671743.
Broome, J. C., and R. W. Hayes. 1997. “A comparison of the clarity of traditional construction contracts and of the new engineering contract.” Int. J. Project Manage. 15 (4): 255–261. https://doi.org/10.1016/S0263-7863(96)00078-6.
Brown, R. D., and N. M. A. Hauenstein. 2005. “Interrater agreement reconsidered: An alternative to the rwg indices.” Organizational Res. Methods 8 (2): 165–184. https://doi.org/10.1177/1094428105275376.
Budayan, C. 2019. “Evaluation of delay causes for BOT projects based on perceptions of different stakeholders in Turkey.” J. Manage. Eng. 35 (1): 04018057. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000668.
Budayan, C., O. Okudan, and I. Dikmen. 2020. “Identification and prioritization of stage-level KPIs for BOT projects—Evidence from Turkey.” Int. J. Managing Projects Bus. 13 (6): 1311–1337. https://doi.org/10.1108/IJMPB-11-2019-0286.
Butt, P., and R. Castle. 2006. Modern legal drafting: A guide to using clearer language. 2nd ed. Cambridge, UK: Cambridge University Press.
Büyüközkan, G., and A. Görener. 2015. “Evaluation of product development partners using an integrated AHP-VIKOR model.” Kybernetes 44 (2): 220–237. https://doi.org/10.1108/K-01-2014-0019.
Cevikbas, M., and A. Koksal. 2019. “Evaluation of litigation process in Turkish construction industry from the perspective of judicial actors.” Tamap J. Eng. 1: 1–7. https://doi.org/10.29371/2019.3.76.
Chan, A. P. C., J. F. Y. Yeung, C. C. P. Yu, S. Q. Wang, and Y. Ke. 2011. “Empirical study of risk assessment and allocation of public-private partnership projects in China.” J. Manage. Eng. 27 (3): 136–148. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000049.
Chang, T. H., and T. C. Wang. 2009. “Using the fuzzy multi-criteria decision making approach for measuring the possibility of successful knowledge management.” Inf. Sci. 179 (4): 355–370. https://doi.org/10.1016/j.ins.2008.10.012.
Chen, L. Y., and T. C. Wang. 2009. “Optimizing partners’ choice in IS/IT outsourcing projects: The strategic decision of fuzzy VIKOR.” Int. J. Prod. Econ. 120 (1): 233–242. https://doi.org/10.1016/j.ijpe.2008.07.022.
Cheung, S. O., and K. H. Y. Pang. 2013. “Anatomy of construction disputes.” J. Constr. Eng. Manage. 139 (1): 15–23. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000532.
Chong, H. Y., B. Balamuralithara, and S. C. Chong. 2011. “Construction contract administration in Malaysia using DFD: A conceptual model.” Ind. Manage. Data Syst. 111 (9): 1449–1464. https://doi.org/10.1108/02635571111182782.
Chong, H. Y., and R. M. Zin. 2008. “Construction contract administration—An approach on clarity.” Clarity 60 (1): 6–10.
Chong, H. Y., and R. M. Zin. 2010. “A case study into the language structure of construction standard form in Malaysia.” Int. J. Project Manage. 28 (6): 601–608. https://doi.org/10.1016/j.ijproman.2009.09.008.
Cinelli, M., M. Kadzinski, M. Gonzalez, and R. Słowinski. 2020. “How to support the application of multiple criteria decision analysis? Let us start with a comprehensive taxonomy.” Omega 96 (Oct): 102261. https://doi.org/10.1016/j.omega.2020.102261.
Clough, R. H., G. A. Sears, and S. K. Sears. 2000. Construction project management. Chichester, UK: Wiley.
Collins-Thompson, K. 2014. “Computational assessment of text readability: A survey of current and future research.” ITL—Int. J. Appl. Ling. 165 (2): 97–135. https://doi.org/10.1075/itl.165.2.01col.
El-Adaway, I. H., R. A. Vance, and I. S. Abotaleb. 2020. “Understanding extension of time under different standard design-build forms of contract.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 04519031. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000331.
Emeç, Ş., and G. Akkaya. 2018. “Stochastic AHP and fuzzy VIKOR approach for warehouse location selection problem.” Int. J. Enterp. Inf. Manage. 31 (6): 950–962. https://doi.org/10.1108/JEIM-12-2016-0195.
Ertuğrul, I., and N. Karakaşoğlu. 2008. “Comparison of fuzzy AHP and fuzzy TOPSIS methods for facility location selection.” Int. J. Adv. Manuf. Technol. 39 (7–8): 783–795. https://doi.org/10.1007/s00170-007-1249-8.
Eydi, A., H. Farughi, and F. Abdi. 2016. “A hybrid method based on fuzzy AHP and VIKOR for the discrete time-cost-quality trade-off problem.” J. Optim. Ind. Eng. 19 (2): 105–116.
Fu, H. P., K. K. Chu, P. Chao, H. H. Lee, and Y. C. Liao. 2011. “Using fuzzy AHP and VIKOR for benchmarking analysis in the hotel industry.” Serv. Ind. J. 31 (14): 2373–2389. https://doi.org/10.1080/02642069.2010.503874.
Gad, G. M., J. S. Shane, K. C. Strong, and J. Choi. 2016. “Rethinking trust in construction contract formation: Dispute resolution method selection.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 8 (3): 04516003. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000191.
Gao, N., Y. Chen, W. Wang, and Y. Wang. 2018. “Addressing project complexity: The role of contractual functions.” J. Manage. Eng. 34 (3): 04018011. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000613.
Giles, T. D., and B. Still. 2005. “A syntactic approach to logical modality.” Atlantis 35 (1): 47–70.
Goodman, K. S. 1967. “Reading: A psycholinguistic guessing game.” J. Reading Specialist 6 (4): 103–112. https://doi.org/10.1080/19388076709556976.
Grandol, J., and M. Gershon. 1994. “Multiple criteria decision making.” In Vol. 27 of Quality progress. Katowice, Poland: Univ. of Economics. https://doi.org/10.5117/mab.67.13669.
Gunduz, M., and H. A. Elsherbeny. 2020. “Operational framework for managing construction-contract administration practitioners’ perspective through modified Delphi method.” J. Constr. Eng. Manage. 146 (3): 040191110. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001768.
Gürcanli, G. E., S. Baradan, and M. Uzun. 2015. “Risk perception of construction equipment operators on construction sites of Turkey.” Int. J. Ind. Ergon. 46 (Mar): 59–68. https://doi.org/10.1016/j.ergon.2014.12.004.
Hansen, S., S. F. Rostiyanti, and A. Rif’at. 2020. “Causes, effects, and mitigations framework of contract change orders: Lessons learned from GBK aquatic stadium project.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 05019008. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000341.
Hitching, I. 2020. “Recent developments in interpretation of contracts: A picture of consistency and clarity.” Soc. Constr. Law 223 (1): 1–16.
Hittleman, D. R. 1972. “Seeking a psycholinguistic definition of readability.” Reading Teach. 26 (8): 783–789.
Huang, S., J. J. H. Liou, W. Tang, and G. Tzeng. 2020. “Location selection of a manufacturing facility from the perspective of supply chain sustainability.” Symmetry 12 (9): 1418. https://doi.org/10.3390/sym12091418.
Huang, S. K., M. K. Lindell, C. S. Prater, H. C. Wu, and L. K. Siebeneck. 2012. “Household evacuation decision making in response to Hurricane Ike.” Nat. Hazard. Rev. 13 (4): 283–296. https://doi.org/10.1061/(ASCE)NH.1527-6996.0000074.
Hughes, W., and Y. Maeda. 2002. “Construction contract policy: Do we mean what we say?” RICS Res. Pap. 4 (12): 1–25.
Husin, S., F. Fachrurrazi, M. Rizalihadi, and M. Mubarak. 2019. “Implementing fuzzy TOPSIS on project risk variable ranking.” Adv. Civ. Eng. 1: 1–10. https://doi.org/10.1155/2019/9283409.
Ibbs, C. W., and D. B. Ashley. 1987. “Impact of various construction contract clauses.” J. Constr. Eng. Manage. 113 (3): 501–521. https://doi.org/10.1061/(ASCE)0733-9364(1987)113:3(501).
IIiff, B. A., P. Halls, and J. Tedjeske. 2012. “The shifting sands of contract drafting, interpretation, and application.” Constr. Law 32 (2): 1–11.
ISO. 2020. Plain language—Part 1: Governing principles and guidelines. ISO/WD 24495-1. Geneva: ISO.
Jang, W., H. U. Hong, S. H. Han, and S. W. Baek. 2017. “Optimal supply vendor selection model for LNG plant projects using fuzzy-TOPSIS theory.” J. Manage. Eng. 33 (2): 04016035. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000474.
Javanbarg, M. B., C. Scawthorn, J. Kiyono, and B. Shahbodaghkhan. 2012. “Fuzzy AHP-based multicriteria decision making systems using particle swarm optimization.” Expert Syst. Appl. 39 (1): 960–966. https://doi.org/10.1016/j.eswa.2011.07.095.
Ju, Y., and A. Wang. 2013. “Extension of VIKOR method for multi-criteria group decision making problem with linguistic information.” Appl. Math. Model. 37 (5): 3112–3125. https://doi.org/10.1016/j.apm.2012.07.035.
Keskitalo, P. 2006. “Contracts + risks + management = contractual risk management?” Nord. J. Commer. Law 2: 1–32.
Khazaeni, G., M. Khanzadi, and A. Afshar. 2012. “Optimum risk allocation model for construction contracts: Fuzzy TOPSIS approach.” Can. J. Civ. Eng. 39 (7): 789–800. https://doi.org/10.1139/l2012-038.
Kumaraswamy, M. M. 1998. “Consequences of construction conflict: A Hong Kong perspective.” J. Manage. Eng. 14 (3): 66–74. https://doi.org/10.1061/(ASCE)0742-597X(1998)14:3(66).
Lam, P. T. I., and A. A. Javed. 2015. “Comparative study on the use of output specifications for Australian and U.K. PPP/PFI projects.” J. Perform. Constr. Facil. 29 (2): 04014061. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000554.
Larsen, J. K., G. Q. Shen, S. M. Lindhard, and T. D. Brunoe. 2016. “Factors affecting schedule delay, cost overrun, and quality level in public construction projects.” J. Manage. Eng. 32 (1): 04015032. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000391.
Lau, C. H., J. W. Mesthrige, P. T. I. Lam, and A. A. Javed. 2019. “The challenges of adopting new engineering contract: A Hong Kong study.” Eng. Constr. Archit. Manage. 26 (10): 2389–2409. https://doi.org/10.1108/ECAM-02-2018-0055.
Lee, G., K. S. Jun, and E. S. Chung. 2015. “Group decision-making approach for flood vulnerability identification using the fuzzy VIKOR method.” Nat. Hazards Earth Syst. Sci. 15 (4): 863–874. https://doi.org/10.5194/nhess-15-863-2015.
Lee, J., Y. Ham, J. S. Yi, and J. Son. 2020. “Effective risk positioning through automated identification of missing contract conditions from the contractor’s perspective based on FIDIC contract cases.” J. Manage. Eng. 36 (3): 05020003. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000757.
Leung, M. Y., S. T. Ng, and S. O. Cheung. 2002. “Improving satisfaction through conflict stimulation and resolution in value management in construction projects.” J. Manage. Eng. 18 (2): 68–75. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:2(68).
Li, J., and P. X. W. Zou. 2011. “Fuzzy AHP-based risk assessment methodology for PPP projects.” J. Constr. Eng. Manage. 137 (12): 1205–1209. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000362.
Liang, R., J. Zhang, C. Wu, Z. Sheng, and X. Wang. 2019. “Joint-venture contractor selection using competitive and collaborative criteria with uncertainty.” J. Constr. Eng. Manage. 145 (2): 04018123. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001588.
Lin, C. T., H. Chiu, and P. Y. Chu. 2006. “Agility index in the supply chain.” Int. J. Prod. Econ. 100 (2): 285–299. https://doi.org/10.1016/j.ijpe.2004.11.013.
Lingard, H., P. Pirzadeh, and D. Oswald. 2019. “Talking safety: Health and safety communication and safety climate in subcontracted construction workgroups.” J. Constr. Eng. Manage. 145 (5): 04019029. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001651.
Liu, A., Y. Xiao, H. Lu, S. B. Tsai, and W. Song. 2019. “A fuzzy three-stage multi-attribute decision-making approach based on customer needs for sustainable supplier selection.” J. Cleaner Prod. 239 (Dec): 118043. https://doi.org/10.1016/j.jclepro.2019.118043.
Liu, H. C., J. X. You, X. Y. You, and M. M. Shan. 2015. “A novel approach for failure mode and effects analysis using combination weighting and fuzzy VIKOR method.” Appl. Soft Comput. 28 (Mar): 579–588. https://doi.org/10.1016/j.asoc.2014.11.036.
Maemura, Y., E. Kim, and K. Ozawa. 2018. “Root causes of recurring contractual conflicts in international construction projects: Five case studies from Vietnam.” J. Constr. Eng. Manage. 144 (8): 05018008. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001523.
Mardani, A., A. Jusoh, K. M. D. Nor, Z. Khalifah, N. Zakwan, and A. Valipour. 2015. “Multiple criteria decision-making techniques and their applications—A review of the literature from 2000 to 2014.” Econ. Res. Ekonomska Istraživanja 28 (1): 516–571. https://doi.org/10.1080/1331677X.2015.1075139.
Marzouk, M., and M. El-Hesnawi. 2018. “Framework for assessing serviceability and socio-economic risk associated with PPPs projects in Libya.” J. Civ. Eng. Manage. 24 (7): 556–567. https://doi.org/10.3846/jcem.2018.5623.
Mazher, K. M., A. P. C. Chan, H. Zahoor, M. I. Khan, and E. E. Ameyaw. 2018. “Fuzzy integral–based risk-assessment approach for public–private partnership infrastructure projects.” J. Constr. Eng. Manage. 144 (12): 04018111. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001573.
Mcconnell, W., and C. M. Clevenger. 2018. “Frequently disputed sections within the AIA A201—2017 general conditions.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 10 (4): 03718002. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000274.
Meixner, O. 2009. “Fuzzy AHP group decision analysis and its application for the evaluation of energy sources.” In Proc., 10th Int. Symp. Analytic Hierarchy/Network Process. Pittsburgh: Creative Decisions Foundation.
Menches, C. L., and L. Dorn. 2013. “Emotional reactions to variations in contract language.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 5 (2): 97–105. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000109.
Mitropoulos, P., and G. Howell. 2001. “Model for understanding, preventing, and resolving project disputes.” J. Constr. Eng. Manage. 127 (3): 223–231. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:3(223).
Molenaar, K., S. Washington, and J. Diekmann. 2000. “Structural equation model of construction contract dispute potential.” J. Constr. Eng. Manage. 126 (4): 268–277. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:4(268).
Murphy, S. E., J. P. Spillane, C. Hendron, and J. Bruen. 2014. “NEC contracting: Evaluation of the inclusion of dispute review boards in lieu of adjudication in the construction industry in the United Kingdom.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 6 (4): 04514002. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000147.
Ng, H. S., F. Peña-Mora, and T. Tamaki. 2007. “Dynamic conflict management in large-scale design and construction projects.” J. Manage. Eng. 23 (2): 52–66. https://doi.org/10.1061/(ASCE)0742-597X(2007)23:2(52).
Nguyen, D. A., M. J. Garvin, and E. E. Gonzalez. 2018. “Risk allocation in US public-private partnership highway project contracts.” J. Constr. Eng. Manage. 144 (5): 04018017. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001465.
Okudan, O., and C. Budayan. 2020. “Determination of the critical success criteria for public-private partnership (PPP) projects in Turkey.” J. Polytech. https://doi.org/10.2339/politeknik.709225.
Okudan, O., C. Budayan, and I. Dikmen. 2020. “Development of a conceptual life cycle performance measurement system for build–operate–transfer (BOT) projects.” Eng. Constr. Archit. Manage. https://doi.org/10.1108/ECAM-01-2020-0071.
Opricovic, S. 2011. “Fuzzy VIKOR with an application to water resources planning.” Expert Syst. Appl. 38 (10): 12983–12990. https://doi.org/10.1016/j.eswa.2011.04.097.
Opricovic, S., and G. H. Tzeng. 2002. “Multicriteria planning of post-earthquake sustainable reconstruction.” Comput. Civ. Infrastruct. Eng. 17 (3): 211–220. https://doi.org/10.1111/1467-8667.00269.
Opricovic, S., and G. H. Tzeng. 2004. “Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS.” Eur. J. Oper. Res. 156 (2): 445–455. https://doi.org/10.1016/S0377-2217(03)00020-1.
Opricovic, S., and G. H. Tzeng. 2007. “Extended VIKOR method in comparison with outranking methods.” Eur. J. Oper. Res. 178 (2): 514–529. https://doi.org/10.1016/j.ejor.2006.01.020.
Oyegoke, A. S. 2006. “Building competence to manage contractual claims in international construction environment: The case of Finnish contractors.” Eng. Constr. Archit. Manage. 13 (1): 96–113. https://doi.org/10.1108/09699980610646520.
Park, S. H. 2009. “Whole life performance assessment: Critical success factors.” J. Constr. Eng. Manage. 135 (11): 1146–1161. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000090.
Parker, D. W., N. Parsons, and F. Isharyanto. 2015. “Inclusion of strategic management theories to project management.” Int. J. Manage. Project Bus. 8 (3): 552–573. https://doi.org/10.1108/IJMPB-11-2014-0079.
Pena-Mora, F., and T. Tamaki. 2001. “Effect of delivery systems on collaborative negotiations for large-scale infrastructure projects.” J. Manage. Eng. 17 (2): 105–121. https://doi.org/10.1061/(ASCE)0742-597X(2001)17:2(105.
Perez, D., J. Gray, and M. Skitmore. 2017. “Perceptions of risk allocation methods and equitable risk distribution: A study of medium to large Southeast Queensland commercial construction projects of medium to large Southeast Queensland commercial construction projects.” Int. J. Constr. Manage. 17 (2): 132–141. https://doi.org/10.1080/15623599.2016.1233087.
Raj, S., J. B. Hillig, and W. Hughes. 2009. “Responsiveness to change by standard-form contract drafters in the construction industry: A case study of the FIDIC White Book.” Int. J. Law Built Environ. 1 (3): 205–220. https://doi.org/10.1108/17561450911001261.
Rameezdeen, R., and C. Rajapakse. 2007. “Contract interpretation: The impact of readability.” Constr. Manage. Econ. 25 (7): 729–737. https://doi.org/10.1080/01446190601099228.
Rameezdeen, R., and A. Rodrigo. 2014. “Modifications to standard forms of contract: The impact on readability.” Constr. Econ. Build. 14 (2): 31–40. https://doi.org/10.5130/ajceb.v14i2.3778.
Sahu, A. K., S. Datta, and S. S. Mahapatra. 2016. “Evaluation and selection of resilient suppliers in fuzzy environment: Exploration of fuzzy-VIKOR.” Benchmarking 23 (3): 651–673. https://doi.org/10.1108/BIJ-11-2014-0109.
Saseendran, A., B. F. Bigelow, Z. K. Rybkowski, and D. E. Jourdan. 2020. “Disputes in construction: Evaluation of contractual effects of ConsensusDOCS.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (2): 04520008. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000377.
Schuhmann, R., and B. Eichhorn. 2017. “Reconsidering contact risk and contractual risk management.” Int. J. Law Manage. 59 (4): 504–521. https://doi.org/10.1108/IJLMA-02-2016-0023.
Seyis, S. 2019. “Pros and cons of using building information modeling in the AEC industry.” J. Constr. Eng. Manage. 145 (8): 04019046. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001681.
Smyth, H., and A. Edkins. 2007. “Relationship management in the management of PFI/PPP projects in the UK.” Int. J. Project Manage. 25 (3): 232–240. https://doi.org/10.1016/j.ijproman.2006.08.003.
Sofiyabadi, J., B. Kolahi, and C. Valmohammadi. 2015. “Key performance indicators measurement in service business: A fuzzy VIKOR approach.” Total Qual. Manage. Bus. Excellence 27 (9–10): 1028–1042. https://doi.org/10.1080/14783363.2015.1059272.
Wang, T. C., J. L. Liang, and C. Y. Ho. 2006. “Multi-criteria decision analysis by using fuzzy VIKOR.” In Vol. 2 of Proc., 2006 Int. Conf. on Service Systems and Service Management, 901–906. New York: IEEE. https://doi.org/10.1109/ICSSSM.2006.320751.
Yao, H., Y. Chen, Y. Chen, and X. Zhu. 2019. “Mediating role of risk perception of trust and contract enforcement in the construction industry.” J. Constr. Eng. Manage. 145 (2): 04018130. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001604.
Yazdani, M., M. R. Abdi, N. Kumar, M. Keshavarz-Ghorabaee, and F. T. S. Chan. 2019. “Improved decision model for evaluating risks in construction projects.” J. Constr. Eng. Manage. 145 (5): 04019024. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001640.
Youssef, A., H. Osman, M. Georgy, and N. Yehia. 2018. “Semantic risk assessment for ad hoc and amended standard forms of construction contracts.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 10 (2): 04518002. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000253.
Yücenur, G. N., and N. E. Demirel. 2012. “Group decision making process for insurance company selection problem with extended VIKOR method under fuzzy environment.” Expert Syst. Appl. 39 (3): 3702–3707. https://doi.org/10.1016/j.eswa.2011.09.065.
Zadeh, L. A. 1965. “Fuzzy sets.” Inf. Control 8 (3): 338–353. https://doi.org/10.1016/S0019-9958(65)90241-X.
Zakaluk, B. L., and S. J. Samuels. 1988. Readability, its past, present, and future. Newark, NJ: International Reading Association.
Zhang, S. B., Y. F. Fu, Y. Gao, and X. D. Zheng. 2016. “Influence of trust and contract on dispute negotiation behavioral strategy in construction subcontracting.” J. Manage. Eng. 32 (4): 04016001. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000427.
Zhang, X. 2005. “Concessionaire’s financial capability in developing build-operate-transfer type infrastructure projects.” J. Constr. Eng. Manage. 131 (10): 1054–1064. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:10(1054).

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 147Issue 6June 2021

History

Received: Apr 18, 2020
Accepted: Dec 15, 2020
Published online: Mar 25, 2021
Published in print: Jun 1, 2021
Discussion open until: Aug 25, 2021

Permissions

Request permissions for this article.

Authors

Affiliations

Ph.D. Candidate, Dept. of Civil Engineering, Yildiz Technical Univ., Istanbul 34220, Turkey (corresponding author). ORCID: https://orcid.org/0000-0002-6865-804X. Email: [email protected]
Associate Professor, Dept. of Civil Engineering, Yildiz Technical Univ., Istanbul 34220, Turkey. ORCID: https://orcid.org/0000-0002-0026-4685. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share