Budget Optimization of Concrete Bridge Decks under Performance-Based Contract Settings

Publication: Journal of Construction Engineering and Management
Volume 147, Issue 6

Abstract

Growing needs for maintenance, repair, and replacement (MRR) of existing transportation infrastructure signifies the importance of new and innovative contracting strategies. Among the emerging contracting methods in the area of transportation infrastructure management is long-term performance-based maintenance contracts, also known as performance-based contracting (PBC). To date, PBC has not been implemented in the area of bridge infrastructure maintenance management due to uncertainties in the bridge deterioration process and challenges in modeling performance. The main objective of this research is to develop short- and long-term optimal MRR plans for bridge decks under PBC settings. This objective necessitates the development of a performance model to define the current condition of bridges and predict their future deterioration rates. The performance model is essential to select appropriate MRR actions that enable planning these actions and estimating the needed budget. The research introduces an integrated condition as a key performance indicator of the bridge component (i.e., bridge deck). Further, an associated level of service (LOS) threshold is defined. The output of this research is a decision support model for selecting optimal rehabilitation strategies while maintaining a defined performance LOS and budget constraints. A modified genetic algorithm (GA) is developed to perform the optimization of resources under the defined LOS and is coded in MATLAB version R2014a software to perform the needed analysis. The decision support model is evaluated with a real case study for a bridge located in Quebec, Canada. Sensitivity analysis is performed to evaluate the impacts of the decision variables against the cost. For instance, the analysis proved that improving the LOS by 18% requires an increase of an MRR budget by about 51%. Research findings concluded that integrating the PBC approach into the decision-making process offers better results in long-term plans. The focus of this study has mainly been on bridge decks. Future work may target expanding to the other bridge components and additional related assets.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, and code generated or used during the study appear in the published article.

References

Abu Dabous, S., and S. Alkass. 2011. “Managing bridge infrastructure under budget constraints: A decision support methodology.” Can. J. Civ. Eng. 38 (11): 1227–1237. https://doi.org/10.1139/l11-082.
Abu Dabous, S., and G. Al-Khayyat. 2018. “A flexible bridge rating method based on analytical evidential reasoning and Monte Carlo simulation.” Adv. Civ. Eng. 2018 (3): 1–13. https://doi.org/10.1155/2018/1290632.
Abu Samra, S., H. Osman, and O. Hosny. 2017. “Optimal maintenance and rehabilitation policies for performance-based road maintenance contracts.” J. Perform. Constr. Facil. 31 (1): 04016075. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000928.
Allah Bukhsh, Z., I. Stipanovic, and A. Doree. 2020. “Multi-year maintenance planning framework using multi-attribute utility theory and genetic algorithms.” Eur. Transp. Res. Rev. 12 (1): 1–13. https://doi.org/10.1186/s12544-019-0388-y.
Alonso, F., J. Casas, and M. Nazar. 2006. “Use of genetic algorithms for optimal policies of M&R in a bridge network.” In Proc., 3rd Int. Conf. on Bridge Maintenance, Safety and Management (IABMAS'06), 103. Porto, Portugal: CRC Press.
Alsharqawi, M., S. Abu Dabous, and T. Zayed. 2016. “Quality function deployment based method for condition assessment of concrete bridges.” In Proc., Transportation Research Board 95th Annual Meeting. Washington, DC: Transportation Research Board.
Alsharqawi, M., S. Abu Dabous, and T. Zayed. 2017. “Performance-based contracting for maintaining transportation assets with emphasis on bridges.” In Vol. 120 of Proc., MATEC Web of Conf., 08012. Les Ulis, France: EDP Sciences.
Alsharqawi, M., T. Zayed, and S. Abu Dabous. 2018. “Integrated condition rating and forecasting method of bridge decks using visual inspection and ground penetrating radar.” Autom. Constr. 89 (May): 135–145. https://doi.org/10.1016/j.autcon.2018.01.016.
Alsharqawi, M., T. Zayed, and A. Shami. 2020. “Ground penetrating radar-based deterioration assessment of RC bridge decks.” Constr. Innov. 20 (1): 1–17. https://doi.org/10.1108/CI-08-2019-0076.
Alsyouf, I., and S. Hamdan, eds. 2017. “A multi-objective optimization of maintenance policies using weighted comprehensive criterion method (WCCM).” In Proc., Int. Conf. on Modeling, Simulation, and Applied Optimization, 1–4. New York: IEEE.
Alyami, Z., and S. Tighe. 2013. “Development of maintenance and rehabilitation program: Pavement assets under performance-based contracts.” Transp. Res. Rec. 2361 (1): 1–10. https://doi.org/10.3141/2361-01.
Cariou, P., A. Cheaitou, R. Larbi, and S. Hamdan. 2018. “Liner shipping network design with emission control areas: A genetic algorithm-based approach.” Transp. Res. Part D Transp. Environ. 63 (Aug): 604–621. https://doi.org/10.1016/j.trd.2018.06.020.
Cheaitou, A., S. Hamdan, R. Larbi, and I. Alsyouf. 2020. “Sustainable traveling purchaser problem with speed optimization.” Int. J. Sustainable Transp. 1–20. https://doi.org/10.1080/15568318.2020.1774825.
de la Garza, J., J. Piñero, and M. Ozbek. 2009. “A framework for monitoring performance-based road maintenance contracts.” In Proc., Associated Schools of Construction 45th Annual Int. Conf., edited by S. Tulio and C. Sterling, 433–441. Gainesville, FL: Univ. of Florida.
Dong, Y., D. M. Frangopol, and S. Sabatino. 2015. “Optimizing bridge network retrofit planning based on cost-benefit evaluation and multi-attribute utility associated with sustainability.” Earthquake Spectra 31 (4): 2255–2280. https://doi.org/10.1193/012214EQS015M.
Fonseca, C. M., and P. J. Fleming. 1998. “Multiobjective optimization and multiple constraint handling with evolutionary algorithms. I: A unified formulation.” IEEE Trans. Syst. Man Cybern. Part A Syst. Humans 28 (1): 26–37. https://doi.org/10.1109/3468.650319.
Frosch, R., S. Labi, A. Samdariya, and Q. Ye. 2014. Increasing bridge deck service life: Volume II—Economic evaluation. West Lafayette, IN: Purdue Univ.
Fwa, T., C. Tan, and W. Chan. 1994. “Road-maintenance planning using genetic algorithms. II: Analysis.” J. Transp. Eng. 120 (5): 710–722. https://doi.org/10.1061/(ASCE)0733-947X(1994)120:5(710).
Ghodoosi, F., S. Abu-Samra, M. Zeynalian, and T. Zayed. 2018. “Maintenance cost optimization for bridge structures using system reliability analysis and genetic algorithms.” J. Constr. Eng. Manage. 144 (2): 04017116. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001435.
Gupta, D., A. Vedantam, and J. Azadivar. 2011. Optimal contract mechanism design for performance-based contracts. MN/RC 2011-18 No. St. Paul, MN: Minnesota DOT.
Haas, R., G. Felio, Z. Lounis, and L. C. Falls, eds. 2009. “Measurable performance indicators for roads: Canadian and international practice.” In Proc., Annual Conf. of the Transportation Association of Canada. Vancouver, BC: Transportation Association of Canada.
Haas, R., S. Tighe, J. Yeaman, and L. C. Falls, eds. 2008. “Long term warranty provisions for sustained preservation of pavement networks.” In Proc., Annual Conf. of the Transportation Association of Canada. Toronto: Transportation Association of Canada.
Hamdan, S., and A. Cheaitou. 2017. “Supplier selection and order allocation with green criteria: An MCDM and multi-objective optimization approach.” Comput. Oper. Res. 81 (May): 282–304. https://doi.org/10.1016/j.cor.2016.11.005.
Holland, J. H. 1975. Adaptation in natural and artificial systems: An introductory analysis with applications to biology, control, and artificial intelligence. Cambridge, MA: MIT Press.
Holland, J. H., and D. E. Goldberg. 1989. Genetic algorithms in search, optimization, and machine learning. Boston: Addison-Wesley Publishing Company.
Hyman, W. A. 2009. Performance-based contracting for maintenance. Washington, DC: National Cooperative Highway Research Program Synthesis of Highway Practice.
Liu, C., A. Hammad, and Y. Itoh. 1997. “Maintenance strategy optimization of bridge decks using genetic algorithm.” J. Transp. Eng. 123 (2): 91–100. https://doi.org/10.1061/(ASCE)0733-947X(1997)123:2(91).
Liu, M., and D. M. Frangopol. 2005. “Multiobjective maintenance planning optimization for deteriorating bridges considering condition, safety, and life-cycle cost.” J. Struct. Eng. 131 (5): 833–842. https://doi.org/10.1061/(ASCE)0733-9445(2005)131:5(833).
Madanat, S., R. Mishalani, and W. H. W. Ibrahim. 1995. “Estimation of infrastructure transition probabilities from condition rating data.” J. Infrastruct. Syst. 1 (2): 120–125.
McCullouch, B. G., K. C. Sinha, and P. C. Anastasopoulos. 2009. Performance-based contracting for roadway maintenance operations in Indiana. West Lafayette, IN: Joint Transportation Research Program.
Mitchell, M. 1998. An introduction to genetic algorithms. Cambridge, MA: MIT Press.
Miyamoto, A., K. Kawamura, and H. Nakamura. 2000. “Bridge management system and maintenance optimization for existing bridges.” Comput.-Aided Civ. Infrastruct. Eng. 15 (1): 45–55. https://doi.org/10.1111/0885-9507.00170.
Morcous, G., and Z. Lounis. 2005. “Maintenance optimization of infrastructure networks using genetic algorithms.” Autom. Constr. 14 (1): 129–142. https://doi.org/10.1016/j.autcon.2004.08.014.
OFPP (Office of Federal Procurement Policy). 1998. Report on the performance-based service contracting pilot project. Washington, DC: OFPP.
Pakkala, P. 2002. Innovative project delivery methods for infrastructure. Helsinki, Finland: Finnish Road Enterprise.
Panthi, K. 2009. “A methodological framework for modeling pavement maintenance costs for projects with performance-based contracts.” Doctor of Philosophy, College of Engineering and Computing, Florida International Univ. https://doi.org/10.25148/etd.FI09120824.
Panthi, K., R. U. Farooqui, and S. M. Ahmed, eds. 2008. “Reliability-based model for estimating long term pavement maintenance contracts under performance specifications.” In Proc., 1st Int. Conf. on Construction in Developing Countries (ICCIDC-I), 456–463. Karachi, Pakistan: NED Univ. of Engineering & Technology.
Piñero, J. C., and J. M. de la Garza. 2004. “Issues related to the assessment of performance-based road maintenance contracts.” In Towards a vision for information technology in civil engineering, edited by I. Flood, 1–8. Reston, VA: ASCE.
Porter, T. M., ed. 2001. “Trends in the procurement models for highway maintenance.” In Proc., Transportation Research Board 80th Annual Meeting. Washington, DC: Transportation Research Board of the National Academies.
Rajeev, S., and C. Krishnamoorthy. 1992. “Discrete optimization of structures using genetic algorithms.” J. Struct. Eng. 118 (5): 1233–1250. https://doi.org/10.1061/(ASCE)0733-9445(1992)118:5(1233).
Sabatino, S., D. M. Frangopol, and Y. Dong. 2015. “Sustainability-informed maintenance optimization of highway bridges considering multi-attribute utility and risk attitude.” Eng. Struct. 102 (Nov): 310–321. https://doi.org/10.1016/j.engstruct.2015.07.030.
Semaan, N., Y. Dib. 2019. “Comparison between the predicted performance curve and the Markov Chain models for structural performance of infrastructure components.” In Vol. 289 of Proc., MATEC Web of Conf., 08006. Les Ulis, France: EDP Sciences.
Seo, J. H. 1994. “A Lagrangean relaxation and network approach to large-scale optimization for bridge management systems.” Doctor of Philosophy, Dept. of Industrial Engineering, Texas A&M Univ.
Smith, K. L., M. Stivers, T. E. Horner, and A. R. Romaine. 1997. Highway maintenance quality assurance. Washington, DC: Transportation Research Board, National Research Council.
Soni, J., R. Gujar, T. Thaker, S. Deshmukh, and P. Patelia. 2019. “Efficient road asset management with output and performance-based road contract.” In Innovative research in transportation infrastructure, 45–54. Singapore: Springer.
Stankevich, N., N. Qureshi, and C. Queiroz. 2009. Performance-based contracting for preservation and improvement of road assets. Washington, DC: World Bank.
Xie, H., W. Wu, and Y. Wang. 2018. “Life-time reliability based optimization of bridge maintenance strategy considering LCA and LCC.” J. Cleaner Prod. 176 (Mar): 36–45. https://doi.org/10.1016/j.jclepro.2017.12.123.
Xiong, Y., and J. B. Schneider. 1992. “Transportation network design using a cumulative genetic algorithm and neural network.” Transp. Res. Rec. 1364 (1): 37–44.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 147Issue 6June 2021

History

Received: Mar 26, 2020
Accepted: Dec 2, 2020
Published online: Mar 23, 2021
Published in print: Jun 1, 2021
Discussion open until: Aug 23, 2021

Permissions

Request permissions for this article.

Authors

Affiliations

Asset Management Specialist, Regional Municipality of York, Newmarket, ON, Canada L3Y 6Z1 (corresponding author). ORCID: https://orcid.org/0000-0001-8249-4718. Email: [email protected]
Saleh Abu Dabous
Associate Professor, Dept. of Civil and Environmental Engineering, Univ. of Sharjah, Sharjah 27272, United Arab Emirates.
Tarek Zayed, F.ASCE
Professor, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., Hung Hom, Kowloon, Hong Kong.
Researcher, Sustainable Engineering Asset Management Research Group, Univ. of Sharjah, Sharjah 27272, United Arab Emirates; Researcher, Université Paris-Saclay, CentraleSupélec, Laboratoire Génie Industriel, 91190, Gif-sur-Yvette, France. ORCID: https://orcid.org/0000-0002-5265-0836

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share