Abstract

Investigating the implications of integrating building information modeling (BIM) with claims management and the consequent effect on quantity surveying practices is essential for advancing digitalization and for avoidance of disputes in construction. Based on primary semistructured interviews with eight construction professionals in the UK and 48 peer-reviewed articles (secondary data), BIM’s potential to enhance collaboration, improve cost estimation, and streamline claims management processes using text mining was studied. Text mining collocation analysis was applied using RStudio to elicit BIM and claims management concepts. The findings suggested that although BIM integration offers considerable benefits, challenges—such as resistance to change, lack of standardization, and the need for continuous upskilling—may hinder its full implementation. These findings contribute to the emerging need for as-built intelligent BIM with claims management operations in the construction industry from a theoretical perspective. BIM’s potential to redefine the role of construction professionals such as quantity surveyors may engender a collaborative construction sector because of the efficiency it brings to the construction industry.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

The data used in the analysis is available upon reasonable request from the corresponding author.

Acknowledgments

The authors thank the interviewees for their engagement and contributions to this study.

References

Works Cited

Ahmed, S. N., C. Pasquire, and E. Manu. 2018. “Evaluating why quantity surveyors conflict with collaborative project delivery system.” In Proc., 26th Annual Conf. of the Int., edited by V. A. González, 1272–1282. Chennai, India: Group for Lean Construction.
Alghazali, W. M. 2018. “Building information modelling (BIM) implementation in construction project and its effects in dispute avoidance and resolution.” M.Sc. thesis, M.Sc. Construction Law and Dispute Resolution, British Univ. in Dubai.
Ali, R., N. Handayani, H. Mukhlish, and F. Tantri. 2020. “The utilization of building information modelling in the extension of time claims management.” In Proc., 8th Int. Conf. on Engineering and Applied Science, 213–218. Islamabad, Pakistan: National Univ. of Sciences and Technology.
Al Shami, K. 2018. “Investigating the use of BIM in managing construction claims.” PM World J. 7 (2): 1–17.
Arayici, Y., P. Coates, L. Koskela, M. Kagioglou, C. Usher, and K. O’Reilly. 2012. “Technology adoption in the BIM implementation for lean architectural practice.” Autom. Constr. 20 (2): 189–195. https://doi.org/10.1016/j.autcon.2010.09.016.
Azhar, S. 2011. “Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry.” Leadersh. Manage. Eng. 11 (3): 241–252. https://doi.org/10.1061/(ASCE)LM.1943-5630.0000127.
Babatunde, S. O., D. Ekundayo, A. O. Adekunle, and W. Bello. 2020. “Comparative analysis of drivers to BIM adoption among AEC firms in developing countries.” J. Eng. Des. Technol. 20 (2): 189–195. https://doi.org/10.1108/JEDT-08-2019-0217.
Bakhary, N. A., A. Ibrahim, and N. A. A. Ismail. 2013. “Critical review on improving the claim management process in Malaysia.” J. Educ. Vocational Res. 4 (7): 214–218. https://doi.org/10.22610/jevr.v4i7.122.
Barakat, M., A. Abdul-Malak, and H. Khoury. 2019. “Sequencing and operational variations of standard claim and dispute resolution mechanisms.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 11 (3): 1–15. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000304.
Barison, M. B., and E. T. Santos. 2010. “BIM teaching strategies: An overview of the current approaches.” In Proc., 27th Int. Conf. on Applications of IT in the AEC Industry and Accelerating BIM Research Workshop. Nottingham, UK: Nottingham University Press.
Bhatt, R., and J. J. Bhavsar. 2014. “Types and causes of construction claims.” Int. J. Eng. Res. Technol. 3 (12): 1–4.
Bilal, M., L. O. Oyedele, J. Qadir, K. Munir, O. O. Akinade, S. O. Ajayi, L. A. Akanbi, H. A. Owolabi, H. A. Alaka, and M. Pasha. 2016. “Big data in the construction industry: A review of present status, opportunities, and future trends.” Adv. Eng. Inf. 30 (3): 500–521. https://doi.org/10.1016/j.aei.2016.07.001.
Braimah, N. 2013. “Approaches to delay claims assessment employed in the UK construction industry.” Buildings 3 (3): 598–620. https://doi.org/10.3390/buildings3030598.
Carmichael, S., and M. Murray. 2006. “Record keeping for contemporaneous delay analysis: A model for effective event management.” Construct. Manage. Econ. 24 (10): 1007–1018. https://doi.org/10.1080/01446190500521207.
Cohen, R., M. Elhadad, and N. Elhadad. 2013. “Redundancy in electronic health record corpora: Analysis, impact on text mining performance and mitigation strategies.” BMC Bioinf. 14 (1): 1–15. https://doi.org/10.1186/1471-2105-14-10.
De Vaus, D., and D. de Vaus. 2013. Surveys in social research. London: Routledge.
Ding, L., Y. Zhou, and B. Akinci. 2014. “BIM application framework: The process of expanding from 3D to computable nD.” Autom. Constr. 46 (Oct): 82–93. https://doi.org/10.1016/j.autcon.2014.04.009.
Dougherty, J. 2015. Claims, disputes and litigation involving BIM. London: Routledge.
Eadie, R., H. Odeyinka, M. Browne, C. McKeown, and M. Yohanis. 2013. “An analysis of the drivers for adopting BIM.” J. Inf. Technol. Constr. 18 (Oct): 338–352.
Eadie, R., H. Odeyinka, M. Browne, C. McKeown, and M. Yohanis. 2014. “BIM adoption: An analysis of the barriers to implementation.” J. Eng. Archit. 2 (1): 77–101.
Egbelakin, T., T. Omotayo, O. E. Ogunmakinde, and D. Ekundayo. 2023. “Eliciting social themes of flood mitigation and community engagement studies through text mining.” Int. J. Build. Pathol. Adapt. https://doi.org/10.1108/IJBPA-02-2023-0022.
Ekung, S. L., C. Okonkwo, and E. Nwosu. 2021. “Claims culture and client-contractors’ willingness to engage in future projects: A multivariate analysis.” Afr. J. Built Environ. Res. 5 (1): 19–40. https://doi.org/10.33796/ajober.5.1.02.
El-Samadony, A., M. Tantawy, and M. M. Atta. 2020. “Developing framework to optimize the preparation of EOT claims using integration of LPS and BIM techniques in construction projects.” J. Eng. Sci. 48 (6): 1196–1221. https://doi.org/10.21608/JESAUN.2021.169075.
Friendly, M. 2002. Visualizing categorical data. Cary, NC: SAS Institute.
Gangane, A. S., P. S. Mahatme, and S. Sabihuddin. 2017. “Impact of construction documents and record on project management.” Elixir Civ. Eng. J. 105 (Apr): 46315–46318.
Giel, B. K., and R. R. A. Issa. 2013. “Return on investment analysis of using BIM in construction.” J. Comput. Civ. Eng. 27 (5): 511–521. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000164.
Gledson, B., D. Hilton, and K. Rogage. 2016. “Benchmarking BIM levels of training and education amongst construction management practitioners.” In Vol. 1 of Proc., 32nd Annual ARCOM Conf., 353–362. Newcastle, UK: Northumbria Univ.
Greenacre, M. 2017. Correspondence analysis in practice. 3rd ed. Boca Raton, FL: CRC Press.
Guévremont, M., and A. Hammad. 2018. “Visualization of delay claim analysis using 4D simulation.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 10 (3): 1–8. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000267.
Guévremont, M., and A. Hammad. 2020. “Review and survey of 4D simulation applications in forensic investigation of delay claims in construction projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (3): 1–9. https://doi.org/10.1061/(ASCE)LA.1943-4170.000039.
Hammam, A. K., and M. El-Said. 2018. “Extension of IFC schema in construction delay claims.” J. Al Azhar Univ. Eng. Sector 13 (48): 908–919. https://doi.org/10.21608/auej.2018.18976.
Hancock, D. R., and B. Algozzine. 2006. Doing case study research: A practical guide for beginning researchers. New York: Teachers College Press.
Ibraheem, R. A., and A. M. R. Mahjoob. 2021. “Facilitating claims settlement using building information modelling in the school building projects.” Innovative Infrastruct. Solutions 7 (40): 1–17. https://doi.org/10.1007/s41062-021-00646-2.
Kassem, M., B. Succar, and N. Dawood. 2015. “Building information modeling: Analyzing noteworthy publications of eight countries using a knowledge content taxonomy.” In Building information modeling: Applications and practices. Reston, VA: ASCE. https://doi.org/10.1061/9780784478998.ch08.
Kehily, D., and J. Underwood. 2017. “Embedding life cycle costing in 5D BIM.” J. Inf. Technol. Constr. 22: 145–167.
Khawaja, E., and A. Mustapha. 2021. “Mitigating disputes and managing legal issues in the era of building information modelling.” J. Constr. Dev. Countries 26 (1): 111–130. https://doi.org/10.21315/jcdc2021.26.1.6.
Koc, S., and S. Skaik. 2014. “Disputes resolution: Can BIM help overcome barriers?” In Proc., Int. Conf. on Construction in a Changing World—CIB 2014, 1–15. Rockhampton, Australia: CQ Univ.
Kumar, R., and S. Paul. 2016. “A review of the types of scientific misconduct in biomedical research.” J. Acad. Ethics 14 (2): 89–102.
Likhitruangsilp, V., T. N. Handayani, P. G. Ioannou, and N. Yabuki. 2018. “A BIM-enabled system for evaluating impacts of construction change orders.” In Proc., Construction Research Congress 2018, 622–631. Reston, VA: ASCE. https://doi.org/10.1061/9780784481264.061.
Liu, Y., S. van Nederveen, and M. Hertogh. 2017. “Understanding effects of BIM on collaborative design and construction: An empirical study in China.” Int. J. Project Manage. 35 (4): 686–698. https://doi.org/10.1016/j.ijproman.2016.06.007.
Lu, W., L. Zhang, and Z. Li. 2015. “Influence of negotiation risk attitude and power on behaviours and outcomes when negotiating construction claims.” J. Constr. Eng. Manage. 141 (2). https://doi.org/10.1061/(ASCE)CO.1943-7862.0000927.
McNamara, A., and S. M. E. Sepasgozar. 2018. “Barriers and drivers of intelligent contract implementation in construction.” In Proc., 42nd AUBEA Conf. 2018: Educating Building Professionals for the future in the Globalised World. Bentley, WA: Curtin Univ. of Technology.
Mitchell, D. 2012. “5D BIM: Creating cost certainty and better buildings.” In Proc., RICS COBRA Conf. London: Royal Institute of Chartered Surveyors.
Mohammad, M., G. Michael, and C. Sharon. 2019. “5D BIM: An investigation into the integration of quantity surveyor within the BIM process.” J. Eng. Des. Technol. 17 (3): 537–553. https://doi.org/10.1108/JEDT-05-2018-0080.
Motamedi, A., A. Hammad, and Y. Asen. 2014. “Knowledge-assisted BIM-based visual analytics for failure root cause detection in facilities management.” Autom. Constr. 43 (Jul): 73–83. https://doi.org/10.1016/j.autcon.2014.03.012.
Obi, L., B. Awuzie, C. Obi, T. Omotayo, A. Oke, and O. Osobajo. 2021. “BIM for deconstruction: An interpretive structural model of factors influencing implementation.” Buildings 11 (6): 227. https://doi.org/10.3390/buildings11060227.
Omotayo, T. S., P. Boateng, O. Osobajo, A. Oke, and L. Obi. 2020. “ystems thinking and CMM for continuous improvement in the construction industry.” Int. J. Prod. Perform. Manage. 69 (2): 271–296. https://doi.org/10.1108/IJPPM-11-2018-0417.
Oraee, M., M. R. Hosseini, E. Papadonikolaki, R. Palliyaguru, and M. Arashpour. 2017. “Collaboration in BIM-based construction networks: A bibliometric-qualitative literature review.” Int. J. Project Manage. 35 (7): 1288–1301. https://doi.org/10.1016/j.ijproman.2017.07.001.
Petrović, S. 2007. “Improving the performance of the naive Bayes multinomial in email classification by varying the thresholds of the multinomial event model.” In Proc., European Conf. on Information Retrieval, 337–349. Berlin: Springer.
Preidel, C., A. Borrmann, H. Mattern, M. Konig, and S. Schapke. 2018. “Common data environment.” Chap. 15 in Building information modelling: Technology foundations and industry practice, edited by A. Borrmann, M. König, C. Koch, and J. Beetz. Cham, Switzerland: Springer. https://doi.org/10.1007/978-3-319-92862-3.
Radford, A., J. Wu, R. Child, D. Luan, D. Amodei, and I. Sutskever. 2019. “Language models are unsupervised multitask learners.” OpenAI blog 1 (8): 9.
Ramos, M., R. Costa, and C. Roche. 2019. “Dealing with specialised co-text in text mining: Verbal terminological collocations.” In Proc., TOTh 2019| Terminologie & Ontologie: Théories et Applications. Alps, France: Presses Universitaires Savoie Mont Blanc.
Ren, Z., G. J. Anumba, and O. O. Ugwu. 2001. “Construction claims management: Towards an agent-based approach.” Eng. Constr. Archit. Manage. 8 (3): 185–197. https://doi.org/10.1108/eb021181.
RICS (Royal Institute of Chartered Surveyors). 2015. International BIM implementation guide: RICS Guidance note, Global. London: RICS.
Runeson, P., and M. Höst. 2009. “Guidelines for conducting and reporting case study research in software engineering.” Empirical Software Eng. 14 (2): 131–164. https://doi.org/10.1007/s10664-008-9102-8.
Sabet, M., P. Zekavat, and S. Mostafa. 2018. “BIM attributes for addressing the causes of dispute in construction projects.” In Proc., Joint Asia-Pacific Network for Housing Researcher’s Conf. Gold Coast, Australia: Griffith Univ.
Sacks, R., L. Koskela, B. Dave, and R. Owen. 2010. “The interaction of lean and building information modeling in construction.” J. Constr. Eng. Manage. 136 (9): 968–980. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000203.
Shahhosseini, V., and H. Hajarolasvadi. 2021. “A conceptual framework for developing a BIM-enabled claim management system.” Int. J. Constr. Manage. 21 (2): 208–222. https://doi.org/10.1080/15623599.2018.1512182.
Shaikh, H. H., N. Y. Zainun, and S. H. Khahro. 2020. “Claims in construction projects: A comprehensive literature review.” In Vol. 498 of Proc., IOP Conf. Series: Earth and Environmental Science, 012095. Bristol, UK: IOP Publishing. https://doi.org/10.1088/1755-1315/498/1/012095.
Smith, P. V. 2017. “Sustainable development and BIM–The role of the 5D quantity surveyor.” In Proc., Pacific Association of Quantity Surveyors 21st Congress. Markham, ON, Canada: Canadian Institute of Quantity Surveyors.
Soon, L. T., H. Hassan, and N. Z. Abidin. 2019. “Comparison between the constraints of building information modelling and 3D modelling.” In Proc., AICCE, Lecture Notes in Civil Engineering, 53. Dordrecht, Netherlands: Springer. https://doi.org/10.1007/978-3-030-32816-0_49.
Succar, B., and M. Kassem. 2015. “Macro-BIM adoption: Conceptual structures.” Autom. Constr. 57 (Sep): 64–79. https://doi.org/10.1016/j.autcon.2015.04.018.
Tao, Y., Z. Cui, and Z. Jiazhe. 2019. “Research on keyword extraction algorithm using PMI and TextRank.” In Proc., 2019 IEEE 2nd Int. Conf. on Information and Computer Technologies (ICICT), 5–9. New York: IEEE.
Thanopoulos, A., N. Fakotakis, and G. Kokkinakis. 2002. “Comparative evaluation of collocation extraction metrics.” In Vol. 2 of Proc., LREC, 620–625. Paris: European Language Resources Association.
Zainon, N., F. A. Mohd-Rahim, and H. Salleh. 2016. “The rise of BIM in Malaysia and its impact towards quantity surveying practices.” In Vol. 6 of Proc., MATEC Web of Conf. (IBCC). Kuala Lumpur, Malaysia: Univ. of Malaya Research Fund Assistance. https://doi.org/10.1051/matecconf/20166.

Information & Authors

Information

Published In

Go to Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Volume 16Issue 3August 2024

History

Received: Jul 11, 2023
Accepted: Jan 6, 2024
Published online: Apr 26, 2024
Published in print: Aug 1, 2024
Discussion open until: Sep 26, 2024

Permissions

Request permissions for this article.

Authors

Affiliations

Dept. of Design and Built Environment, School of Arts and Humanities, Univ. of Huddersfield, Huddersfield HD1 3DH, UK. ORCID: https://orcid.org/0009-0002-7347-1033. Email: [email protected]
School of Built Environment, Engineering and Computing, Leeds Beckett Univ., Leeds LS2 8AG, UK (corresponding author). ORCID: https://orcid.org/0000-0001-5280-3946. Email: [email protected]
Professor, Dept. of Design and Built Environment, School of Arts and Humanities, Univ. of Huddersfield, Huddersfield HD1 3DH, UK. ORCID: https://orcid.org/0000-0002-8740-6753. Email: [email protected]
Dept. of Design and Built Environment, School of Arts and Humanities, Univ. of Huddersfield, Huddersfield HD1 3DH, UK. ORCID: https://orcid.org/0000-0002-0356-7585. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share